Opendata, web and dolomites

Wavepiston SIGNED

Low price wave energy conversion through force cancellation.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Wavepiston project word cloud

Explore the words cloud of the Wavepiston project. It provides you a very rough idea of what is the project "Wavepiston" about.

pilot    complete    ireland    performed    shore    connection    pumps    validated    sceptical    technologies    islands       clean    competitive    specialised    requiring    usable    no    modules    90    2013    respect    economically    successive    near    power    wavepiston    watt    pumping    communities    force    esco    pressurized    reducing    break    efficiency    identical    2006    industrialization    cylinders    stopped    ensures    2009    chain    enermed    investors    fit    size    mounted    respectively    forces    demand    structure    energy    2010    plan    experimentally    vryhof    price    remote    emissions    coastal    supply    reduce    tests    conversion    proof    ed    amount    offshore    wave    harvest    anchors    business    contained    patented    capital    waves    grid    joined    water    suitable    company    simpler    meet    models    renewable    expenditure    efficient    proved    tank    string    conceived    isolated    nurmi    producing    accounting    predicted    consists    mooring    hydraulic    cancellation    worked    attempt    panel   

Project "Wavepiston" data sheet

The following table provides information about the project.

Coordinator
WAVEPISTON AS 

Organization address
address: KRONBORG 10A, 3000 Helsingør
city: HELSINGER
postcode: 3000
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Denmark [DK]
 Project website http://www.wavepiston.dk/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-02-01   to  2015-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    WAVEPISTON AS DK (HELSINGER) coordinator 50˙000.00
2    ENERGIA MEDITERRANEA SRL IT (CAGLIARI) participant 0.00
3    NURMI CYLINDERS OY FI (IKKALA) participant 0.00
4    VRYHOF ANCHORS BV NL (SCHIEDAM) participant 0.00

Map

 Project objective

No attempt to harvest energy from waves has resulted in an economically viable and competitive technology. Many projects stopped and investors have become sceptical of wave power. Currently the cost per watt of usable wave energy is high, due to a focus on energy conversion methods and efficiency, rather than on mooring and grid connection, accounting for more than 90% expenditure. Wavepiston is a break through near-shore wave power technology producing energy from waves at a competitive price with respect to the most efficient renewable energy technologies. The system consists of identical modules mounted on a string pumping pressurized water to shore for successive energy conversion. Using Wavepiston’s patented “force cancellation” principle the system is able to reduce the amount of forces on the mooring and structure to 1:10, requiring a simpler structure and therefore reducing capital costs. The Wavepiston system can provide cost efficient, clean and reliable renewable energy to help meet Europe’s increasing demand and achieve emissions reduction targets. The offshore application ensures it is a suitable fit also for remote islands and isolated coastal communities. The Wavepiston system was conceived in 2006 and in 2009 the concept of force cancellation was patented. In 2010 numerous tank tests were performed with a system 1:30 the size, that experimentally validated the system and proved each panel can harvest more than 5% of the energy contained in a wave. In 2013 a proof of concept was carried out offshore with a system 1:9 the size and it worked better than predicted. Vryhof Anchors and Nurmi Cylinders, specialised in offshore mooring and hydraulic pumps respectively, have joined the project to support product industrialization. Phase 1 will assess various business models (with the support of the ESCO company EnerMed partner in the project), establish a complete supply chain and plan all activities for the large scale pilot to be held in Ireland.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "WAVEPISTON" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "WAVEPISTON" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More  

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

SEESWIND (2016)

SEESWIND, Silent, Efficient and Economic Small Wind Energy.

Read More