Opendata, web and dolomites

KDRP

KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 KDRP project word cloud

Explore the words cloud of the KDRP project. It provides you a very rough idea of what is the project "KDRP" about.

gt    slowly    electricity       kpls    evolution    communication    kemp    max    platform    hardware    central    demonstrated    drups    readings    telecoms    installation    retail    renewable    stability    automated    hospitals    meter    participation    industrial       initial    validation    overcome    innovations    technological    integrate    types    integration    lt    stores    50kw    carbon    innovative    principal    water    optimisation    motors    detailing    hvac    commercial    asset    hotels    forming    assets    software    1mw    industry    ancillary    market    basis    plan    centres    delivered    dr    period    trl8    incl    environment    solution    forecasting    renewables    commercialisation    model    wireless    scalability    rarr    orgs    cloud    capacity    secondary    report    consists    speed    requirement    designed    energy    challenge    grid    financial    critical    first    qualified    economic    revenues    stations    flexibility    feasibility    monitoring    smei    sec    barriers    small    engine    data    pump    tech    prototype    complete    mw    progressing    ups    business    prevent    sufficiently    successful    services    trl6    frequency    smes    lack    remote    demand   

Project "KDRP" data sheet

The following table provides information about the project.

Coordinator
KIWI POWER LTD 

Organization address
address: 35 BALLARDS LANE
city: LONDON
postcode: N3 1XW
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.kiwipowered.com/innovation
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-03-01   to  2015-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KIWI POWER LTD UK (LONDON) coordinator 50˙000.00

Map

 Project objective

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "KDRP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "KDRP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

iDriver (2015)

iDriver

Read More  

CargoMill (2015)

The CARGOMIL, an innovative self propelled all terrain vehicle for mobilising “where and when the biomass is”.

Read More