Opendata, web and dolomites

KDRP

KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 KDRP project word cloud

Explore the words cloud of the KDRP project. It provides you a very rough idea of what is the project "KDRP" about.

trl6    slowly    max    period    installation    remote    trl8    hospitals    telecoms    kemp    industrial    environment    communication    consists    evolution    prevent    scalability    50kw    central    lt    technological    engine    delivered    capacity    lack    sufficiently    stability    validation    secondary    smei    plan    solution    pump    assets       industry    asset    tech    barriers    renewables    requirement    ups    orgs    feasibility    report    principal    commercialisation    complete    mw    cloud    data    rarr    demonstrated    types    hotels    qualified    drups    designed    participation    revenues    frequency    market    basis    initial    optimisation    speed    challenge    model    commercial    automated    forecasting    1mw    energy    motors    innovations    prototype    centres    business    financial    integration    critical    successful    forming    first    economic    software    gt    hardware    sec    integrate    wireless    innovative    kpls    stations    progressing    renewable    flexibility    grid    incl    hvac    stores    meter    ancillary    detailing    monitoring    readings    dr    smes    retail    platform    carbon    water    demand    electricity    services    small    overcome      

Project "KDRP" data sheet

The following table provides information about the project.

Coordinator
KIWI POWER LTD 

Organization address
address: 35 BALLARDS LANE
city: LONDON
postcode: N3 1XW
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.kiwipowered.com/innovation
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-03-01   to  2015-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KIWI POWER LTD UK (LONDON) coordinator 50˙000.00

Map

 Project objective

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "KDRP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "KDRP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More  

PearlLight+ (2015)

Increasing the efficiency of LED street lighting by 15% via optical design

Read More  

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More