Opendata, web and dolomites

KDRP

KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 KDRP project word cloud

Explore the words cloud of the KDRP project. It provides you a very rough idea of what is the project "KDRP" about.

demand    integration    renewable    lt    mw    hvac    max    successful    gt    financial    smei    telecoms    optimisation    environment    readings    barriers    prototype    innovative    drups    cloud    kpls    ups    platform    participation    services    carbon    electricity    meter    centres    designed    principal    kemp    software    consists    trl6    ancillary    validation    report    retail    delivered    forming    scalability    smes    frequency    remote    trl8    monitoring    50kw    sufficiently    forecasting    qualified    data    industry    prevent    overcome    industrial    challenge    slowly    communication    motors    demonstrated    lack    first    rarr    technological    grid    tech    commercialisation    model    capacity    complete    sec    types    secondary    water    revenues    central    initial    stations    orgs    business    small    evolution    pump    assets    automated    plan       economic    hardware    hospitals    incl    1mw    progressing    engine    critical    requirement    commercial    market    energy    period    stores    feasibility    installation    speed    dr    detailing    innovations    flexibility    hotels    asset    renewables    basis    solution    wireless    integrate       stability   

Project "KDRP" data sheet

The following table provides information about the project.

Coordinator
KIWI POWER LTD 

Organization address
address: 35 BALLARDS LANE
city: LONDON
postcode: N3 1XW
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.kiwipowered.com/innovation
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-03-01   to  2015-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KIWI POWER LTD UK (LONDON) coordinator 50˙000.00

Map

 Project objective

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "KDRP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "KDRP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

iDriver (2015)

iDriver

Read More  

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More