KiWi Power Limited’s Revolutionary, Low Cost, Demand Response Platform (KDRP)

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 KDRP project word cloud

Explore the words cloud of the KDRP project. It provides you a very rough idea of what is the project "KDRP" about.

evolution    critical    hvac    ups    demonstrated    delivered    revenues    kpls    cloud    demand    renewables    forming    communication    incl    prevent    stability    trl8    grid    lt    integration    speed    flexibility    qualified    monitoring    rarr    asset    economic    platform    sec    trl6    industrial    stores    innovative    commercialisation    services    industry    max    principal    validation    innovations    water    scalability    software    slowly    financial    basis    barriers    successful    optimisation    energy    report    progressing    tech    lack    stations    drups    requirement    environment    orgs    telecoms    market    participation    kemp    solution    capacity    hardware    automated    sufficiently    carbon    pump    hotels    initial    installation    smei    integrate    gt    dr    motors    overcome       renewable    retail    1mw    detailing    smes    consists    readings    secondary    assets    engine    electricity    challenge    central    prototype    hospitals    types    data    complete    centres    first    mw    wireless    meter    period    feasibility    plan    commercial    model    remote    ancillary    small    designed    50kw    forecasting    business    frequency    technological      

Project "KDRP" data sheet

The following table provides information about the project.

Coordinator
KIWI POWER LTD 

Organization address
address: 35 BALLARDS LANE
city: LONDON
postcode: N3 1XW
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://www.kiwipowered.com/innovation
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-03-01   to  2015-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    KIWI POWER LTD UK (LONDON) coordinator 50˙000.00

Map

 Project objective

CHALLENGE: Demand response (DR) is central to the successful evolution of a new low carbon electricity system in order to deliver grid flexibility & stability, however it is progressing slowly in the EU due to technological barriers which prevent widespread uptake: high in cost hardware (€4.000 - €6.000); not specifically designed for DR → lack critical functionality (e.g. wireless communication, integration of renewables); & not sufficiently open for wider industry participation.

PROPOSED SOLUTION: To address the need for innovations that overcome principal barriers to DR, this project seeks to advance KPLs Energy Management Platform, KEMP, from a prototype demonstrated in a relevant environment (TRL6) to complete & qualified commercial prototype (TRL8). KEMP is a low cost, automated ancillary services platform which consists of: [1] Unique hardware: multi-asset control; first platform to integrate renewable assets; wireless communication between assets → reduced installation cost; & sec. by sec. meter readings – requirement for Frequency Response programmes. [2] Innovative software: cloud based – for greater scalability; flexibility & remote monitoring, forecasting model - for integration of renewables; & optimisation engine - to max. revenues.

END USERS: [1] Initial target = large scale commercial & industrial (C&I) orgs with high MW capacity (>1MW) e.g. financial, telecoms, hospitals, hotels etc. Asset types: DRUPS systems & HVAC. [2] Secondary target = SMEs with low MW capacity (50kW< capacity < 1MW) incl. Water Pump Stations, Small Data Centres, Retail Stores. Asset types: Variable Speed Motors, HVAC, UPS systems etc.

STUDY OBJECTIVES: tech validation, market analysis, economic & business assessment, operational capacity analysis. Activities will be delivered within a 4 month period, & result in a comprehensive feasibility report detailing the next steps towards development & commercialisation, forming the basis of the SMEI Phase II Business Plan.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "KDRP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "KDRP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More  

HELITE (2016)

High precision and performance heliostat for variable geometry fields of Thermosolar Plants

Read More  

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More