Opendata, web and dolomites

CLEANKER SIGNED

CLEAN clinKER production by Calcium looping process

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "CLEANKER" data sheet

The following table provides information about the project.

Coordinator
LABORATORIO ENERGIA AMBIENTE PIACENZA 

Organization address
address: VIA NINO BIXIO 27
city: PIACENZA
postcode: 29121
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.cleanker.eu
 Total cost 9˙237˙851 €
 EC max contribution 8˙972˙201 € (97%)
 Programme 1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply)
 Code Call H2020-LCE-2017-RES-CCS-RIA
 Funding Scheme RIA
 Starting year 2017
 Duration (year-month-day) from 2017-10-01   to  2021-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    LABORATORIO ENERGIA AMBIENTE PIACENZA IT (PIACENZA) coordinator 798˙875.00
2    BUZZI UNICEM SPA IT (CASALE MONFERRATO ALESSANDRIA) participant 2˙899˙131.00
3    IKN GMBH INGENIEURBURO-KUHLERBAU-NEUSTADT DE (NEUSTADT AM RUBENBERGE) participant 2˙462˙082.00
4    VDZ GEMEINNUTZIGE GMBH DE (DUSSELDORF) participant 549˙316.00
5    UNIVERSITAET STUTTGART DE (STUTTGART) participant 470˙437.00
6    AGENCIA ESTATAL CONSEJO SUPERIOR DEINVESTIGACIONES CIENTIFICAS ES (MADRID) participant 436˙876.00
7    TALLINNA TEHNIKAULIKOOL EE (TALLINN) participant 338˙500.00
8    LAPPEENRANNAN-LAHDEN TEKNILLINEN YLIOPISTO LUT FI (LAPPEENRANTA) participant 338˙420.00
9    POLITECNICO DI MILANO IT (MILANO) participant 274˙000.00
10    QUANTIS CH (ECUBLENS VD) participant 235˙625.00
11    ITALCEMENTI FABBRICHE RIUNITE CEMENTO SPA IT (BERGAMO) participant 109˙500.00
12    AMICI DELLA TERRA ONLUS IT (ROMA) participant 59˙437.00
13    TSINGHUA UNIVERSITY CN (BEIJING) participant 0.00

Map

 Project objective

Calcium looping (CaL) is one of the most promising technologies for CO2 capture in cement plants. The process comprises two basic steps: (1) “carbonation” of CaO to form CaCO3 in a reactor operating around 650°C; (2) oxyfuel calcination in a reactor operating at 920-950°C, which makes the CaO available again and generates a gas stream of nearly-pure CO2. The CLEANKER project aims at demonstrating at TRL7 the CaL concept in a configuration highly integrated with the cement production process, making use of entrained flow reactors. The highly integrated configuration allows achieving high energy efficiencies, with CO2 capture efficiency over 90%. The adoption of entrained flow gas-solid reactors is particularly suitable - and familiar - to the cement industry. The core activity of the project is the design, construction and operation of a CaL demonstration system comprising the entrained-flow carbonator (the CO2 absorber) and the entrained-flow oxyfuel calciner (the sorbent regenerator). This demonstration system will capture the CO2 from a portion of the flue gas of the cement plant in Vernasca (Italy) operated by Buzzi Unicem, using as CO2 sorbent the same raw meal used for clinker production. Other activities will include: (i) screening of different raw meals to assess their properties as CO2 sorbent, (ii) reactors and process modelling, (iii) scale-up study, (iv) economic analysis, (v) life cycle assessment, (vi) CO2 transport, storage and utilization study (vii) demonstration of the complete value chain, including mineral carbonation of waste ash with the CO2 captured at Vernasca; (viii) exploitation study for the demonstration of the technology at TRL>7 and for its first commercial exploitation based on CO2 transport and storage opportunities.

 Deliverables

List of deliverables.
CLEANKER Newsletter (1) Websites, patent fillings, videos etc. 2019-10-10 15:03:34
Detailed Project Management Plan Documents, reports 2019-10-10 15:03:34
Development of a dissemination and communication plan of results Documents, reports 2019-10-10 15:03:34
CLEANKER Newsletter (2) Websites, patent fillings, videos etc. 2019-10-10 15:03:34
CLEANKER website and social media account online Websites, patent fillings, videos etc. 2019-10-10 15:03:34
Project Management Handbook describing all commonly-agreed internal project management procedures Documents, reports 2019-10-10 15:03:34
CLEANKER Newsletter (3) Websites, patent fillings, videos etc. 2019-10-10 15:03:35

Take a look to the deliverables list in detail:  detailed list of CLEANKER deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Martina Fantini
CLEANKER - Objectives + scope of Ca-Looping
published pages: , ISSN: , DOI:
Innovation in Industrial Carbon Capture Conference 2019-10-10
2018 Matthias Hornberger et. al.
Calcium Looping CO2 Capture - Integrated Entrained Flow CaL
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 Martina Fantini, Maurizio Spinelli
CLEANKER Overview
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 Sandra Turrado, Borja Arias, José Ramón Fernández, Juan Carlos Abanades
Carbonation of Fine CaO Particles in a Drop Tube Reactor
published pages: 13372-13380, ISSN: 0888-5885, DOI: 10.1021/acs.iecr.8b02918
Industrial & Engineering Chemistry Research 57/40 2019-10-10
2018 Stefano Consonni
CLEANKER: come abbattere le emissioni di CO2 nella produzione di cemento
published pages: , ISSN: , DOI:
2019-10-10
2018 Mónica Alonso, Mathias Hornberger, Reinhold Spörl, Günter Scheffknecht, Carlos Abanades
Characterization of a Marl-Type Cement Raw Meal as CO 2 Sorbent for Calcium Looping
published pages: 15229-15234, ISSN: 2470-1343, DOI: 10.1021/acsomega.8b01795
ACS Omega 3/11 2019-10-10
2018 Alla Shogenova et. al.
WP7: Transport, Utilization and Storage of CO2 emissions produced by cement industry
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 Alla Shogenova
Regulations, gaps and recommendations for CO2 use in the Baltic States (Based on CLEANKER Project results)
published pages: , ISSN: , DOI:
BASRECCS – ENOS Workshop: September 26. 2018 2019-10-10
2019 Alla Shogenova et. al.
Transport, Utilization and Storage of CO2 Emissions Produced by Cement Industry: CCUS Study of the CLEANKER Project
published pages: , ISSN: , DOI:
14th Greenhouse Gas Control Technologies Conference Melbourne 21-26 October 2018 (GHGT-14) 2019-10-10
2019 Fantini M. et al.
CLEANKER – Clean Clinker by Calcium Looping Process for Low-CO2 Cement Production
published pages: , ISSN: , DOI:
14th Greenhouse Gas Control Technologies Conference Melbourne 21-26 October 2018 (GHGT-14) 2019-10-10
2018 Matteo Romano et. al.
WP5 Process modelling and integration
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 Giovanni Cinti, Matteo Romano
Calcium looping capture in the cement industry CLEANKER prototype engineering, CEMCAP conclusions
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 LEAP
CLEANKER by calcium looping
published pages: , ISSN: , DOI:
International Cement Review - ICR 2019-10-10
2018 Mai Uibu et. Al.
CO2 mineralization in cement sector: Lab scale experiments on burnt oil shale and concrete demolition wastes
published pages: , ISSN: , DOI:
BASRECCS – ENOS Workshop: September 26. 2018 2019-10-10
2019 Mai Uibu et. al.
Mineral Trapping of CO2 for Cement Industry De-Carbonization
published pages: , ISSN: , DOI:
14th Greenhouse Gas Control Technologies Conference Melbourne 21-26 October 2018 (GHGT-14) 2019-10-10
2019 Mónica Alonso, José Ramón Fernández, Juan Carlos Abanades
Kinetic Study of Belite Formation in Cement Raw Meals Used in the Calcium Looping CO 2 Capture Process
published pages: 5445-5454, ISSN: 0888-5885, DOI: 10.1021/acs.iecr.9b00813
Industrial & Engineering Chemistry Research 58/14 2019-10-10
2018 Joerg Hammerich et. al.
WP2 Engineering and design of the demonstrator plant
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10
2018 Usta, M. C.; Zuravljova, A.; Kuusik, R.; Trikkel, A.; Kallas, J.; Tamm, K.; Uibu, M
Integrated carbon mineralization and waste utilization for de-carbonization in cement industry
published pages: , ISSN: , DOI:
6th International Conference on CO2 Emission Control and Utilization, Hangzhou, China, June 15-18, 2018. Zhejiang University, 2019-10-10
2018 Karl Simmer, supervisor - Alla Shogenova
Estonian-Latvian Transboundary Carbon Dioxide Capture, Transport and Storage (CCS) Scenario for the Cement Industry
published pages: , ISSN: , DOI:
2019-10-10
2018 Martina Fantini
EU research project CLEANKER Technology, progress and project perspectives
published pages: , ISSN: , DOI:
ECRA/CEMCAP/CLEANKER workshop 2019-10-10

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CLEANKER" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "CLEANKER" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.2.)

IDEAS (2019)

Novel building Integration Designs for increased Efficiencies in Advanced Climatically Tunable Renewable Energy Systems

Read More  

ELEMENT (2019)

Effective Lifetime Extension in the Marine Environment for Tidal Energy

Read More  

ARBAHEAT (2018)

Cost-effective transformation of a Highly-Efficient, Advanced, Thermal Ultra-SuperCritical coal-fired power plant into a CHP by retrofitting and integrating an ARBAFLAME biomass upgrading process.

Read More