Opendata, web and dolomites

Matrix Charging SIGNED

Matrix Charging: Novel, automated charging infrastructure for electric vehicles

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Matrix Charging project word cloud

Explore the words cloud of the Matrix Charging project. It provides you a very rough idea of what is the project "Matrix Charging" about.

vehicle    fold    max    400    attractive    revolutionize    leadership    density    surge    urbanisation    giving    times    competitive    24m    mobility    matrix    return    2018    additional    quality    valid    innovations    anxiety    hours    direct    electro    charging    efficient    tend    slowing    forecasts    920    public    15    2022    moving    road    competitor    impacts    though    semi    living    disadvantages    transmission    electrification    112    over    reduce    few    decarbonised    delivering    sales    500    power    technologies    yr1    grow    2010    yr5    automated    99    reg    energy    gross    continuing    conductive    performance    life    roi    stations    refuelling    cs    adverse    batteries    q2    parts    projected    whilst    efficiency       transport    bmw    investment    demand    people    period    30    arguments    primarily    cagr    nearest    autonomous       lower    driving    profit    electric    resistance    traffic    ev    vehicles    innovation    first    km    inclusive    cities    global    solution    outside    points    9m    world    market    sustainable    million    44m    disruptive    sprawl    validated    met    8bn    charge    individual    evs    29   

Project "Matrix Charging" data sheet

The following table provides information about the project.

Coordinator
EASE-LINK GMBH 

Organization address
address: MUNZGRABENSTRASSE 94
city: GRAZ
postcode: 8010
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Austria [AT]
 Project website https://easelink.com/
 Total cost 2˙934˙062 €
 EC max contribution 2˙053˙843 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-2
 Funding Scheme SME-2
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2020-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EASE-LINK GMBH AT (GRAZ) coordinator 2˙053˙843.00

Map

 Project objective

Over the next 15 years continuing growth of urbanisation & sprawl will increase the demand for individual mobility & the increase of traffic density will produce many adverse impacts that have direct effects on the quality of life for people living in cities. To lead Europe into a sustainable & competitive future, novel innovations are essential to increase transport efficiency. Vehicle electrification & autonomous driving are two promising new technologies that have disruptive potential for individual mobility whilst giving support “Towards an energy-efficient, decarbonised transport sector”. Sales of Electric Vehicles (EV) tend to be met with high resistance primarily due to range anxiety (max. 100-400 km), variable power costs & long refuelling times (5-8 hours to charge) thus slowing down leadership in electro-mobility. Though these arguments may be valid now, future batteries and charging stations (CS) will reduce these disadvantages. The EV market is projected to grow at a CAGR of 29% & 20 million EVs are going to be on the road by 2022. In 2010, public charging points for EVs were few. Today, there are 112,500 public or semi-public charging points in Europe and is expected to surge at CAGR of 29.8% and reach €10.8Bn global market by 2022.As EV’s become more autonomous there will be greater importance on automated charging. With Matrix Charging® we will have the potential to revolutionize automated EV charging by being the world’s first fully automated conductive charging technology that has no moving parts outside the vehicle. The key innovation is delivering the solution with 99% transmission efficiency, at 30% lower cost than nearest competitor and a 6-fold higher performance with 9% additional efficiency, as we validated with BMW. With a phase 2 cost of €2.9M in early Q2 2018 Matrix Charging® forecasts a €24M gross profit in Yr5 (€44M gross profit Yr1 to Yr5 inclusive period), with a return on investment (ROI) is a very attractive 920% (9.2).

 Deliverables

List of deliverables.
website area www.easelink.com Websites, patent fillings, videos etc. 2020-02-07 15:50:29

Take a look to the deliverables list in detail:  detailed list of Matrix Charging deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "MATRIX CHARGING" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "MATRIX CHARGING" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

COPI (2020)

Carbon Offset Plug-in

Read More  

EPICA (2019)

Improved Credentialess and Secure Cloud Access

Read More  

MACCO (2019)

Bring social robots into reality with the first real world leading bartender (MACCO)

Read More