The following table shows the list of Horizon 2020 projects developed by "ALE HEAVYLIFT (R&D) BV". Projects are ordered by starting date.
Click on table headers to rearrange data.
# | acronym | programme | role | EC contrib. | start | views |
---|---|---|---|---|---|---|
1 | TELWIND | H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. | participant | 200˙250.00 | 2015-12-01 | 958 |
2 | ELICAN | H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. | participant | 124˙279.00 | 2016-01-01 | 828 |
totale | 324˙529.00 |
This organization collaborated with partners in 3 countries.
Within the project TELWIND this organization got in touch with:
role | cy | shortname | name |
---|---|---|---|
participant | DE | DYWIDAG | DYWIDAG SYSTEMS INTERNATIONAL GMGH (PRC) |
coordinator | ES | ESTEYCO | ESTEYCO SA (PRC) |
participant | NL | Mecal WTD | MECAL WIND TURBINE DESIGN BV (PRC) |
participant | ES | COBRA | COBRA INSTALACIONES Y SERVICIOS S.A (PRC) |
participant | ES | CEDEX | CENTRO DE ESTUDIOS Y EXPERIMENTACION DE OBRAS PUBLICAS - CEDEX (REC) |
participant | ES | UNICAN (UC) | UNIVERSIDAD DE CANTABRIA (HES) |
participant | DE | TUM | TECHNISCHE UNIVERSITAET MUENCHEN (HES) |
Within the project ELICAN this organization got in touch with:
role | cy | shortname | name |
---|---|---|---|
participant | ES | ADWEN OFFSHORE | ADWEN OFFSHORE S.L. (PRC) |
coordinator | ES | ESTEYCO | ESTEYCO SA (PRC) |
participant | ES | ALE IBE | A.L.E. HEAVYLIFT IBERICA SA (PRC) |
participant | ES | PLOCAN | CONSORCIO PARA EL DISENO, CONSTRUCCION, EQUIPAMIENTO Y EXPLOTACION DE LA PLATAFORMA OCEANICA DE CANARIAS (PUB) |
participant | ES | GAMESA | SIEMENS GAMESA RENEWABLE ENERGY EOLICA SL (PRC) |
participant | DE | DEWI | UL INTERNATIONAL GMBH (PRC) |