The page lists 33 deliverables related to the research project "CLARUS".
title and desprition | type | last update |
---|---|---|
Legal assessment and recommendationsThis deliverable will describe the active collaboration between the legal and technical partners for the implementation of the legal requirements that are identified in WP2 and documented in D2.1. It will carry out the legal assessment of the CLARUS system and result in a specific and tailor made recommendations for Europe and European service providers on how to get the privacy and data protection principles built in cloud computing systems and services, thereby realising in practice the ‘privacy-by-design’ model. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
The CLARUS interfaceThis deliverable will document the platform interface specification and implementation. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Definition of application casesDefinition of the application cases that will inform all further development and will be tested and validated within WP6. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Standardisation assessmentThis deliverable presents the assessment of the standardisation guidelines and requirements identified in WP2 and documented in D2.5. It will result in a set of recommendations for Europe and European CSPs concerning standardisation issues, drawing also on related work at project/research level. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
The CLARUS platform V1This document will specify the design of CLARUS platform as well as a user manual. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Architecture V1This deliverable will provide the architecture design of the CLARUS system, including the functional components, data location, data flows and protocols. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Adapted monitoring tool for the cloud V2This software package (including a user manual) will enable the supervision of client operations. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Demonstrators, pilots, prototypes | 2020-02-26 |
First progress report, financial statement and reviewProgress according to the plan will be described in terms of technical activities, record of activities related to undertaken dissemination and exploitation activities, and use of resources (financial and personnel) at the end of the first year. Any deviations from the plan will be described, together with an assessment of the possible consequences and proposals for any necessary re-planning. The document will contain the completed project deliverables, a report of scientific production, and a summary of the periodic reports submitted by the partners to the coordinator. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Adapted monitoring tool for the cloud V1This software package (including a user manual) will enable the supervision of client operations. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Characterisation of enabling technologiesAs a result of Task 3.1, a characterisation of privacypreserving and security-enabling techniques will be provided in this report. The document will analyse available techniques and methods from different perspectives, by identifying their main advantages and limitations with regard to clouds. The document will be an input for research in Task 3.2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
An attack-tolerant framework for the cloud V2This report will specify the framework provided by CLARUS to cope and preserve cloud services. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
The CLARUS modules V2This document will specify the detailed design of the CLARUS solution Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Demonstrators, pilots, prototypes | 2020-02-26 |
Standardisation requirementsThis deliverable will report on the necessary requirement results and implementation roadmap, effort and analysis, considering the EU and global landscape. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Architecture V2This deliverable will provide the architecture design of the CLARUS system, including the functional components, data location, data flows and protocols. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Dissemination and standards report V3An initial dissemination plan will be produced after 6 months, and revised versions that also cover standardisation efforts will be produced at 12-month intervals. Results of standards monitoring, analysis and dissemination activities will be included in this report. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Standardisation and interoperabilityThis deliverable will provide the main results concerning standardisation and interoperability issues. It will focus more on outcomes and impact in the EU & global context. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
CLARUS websiteCLARUS website Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
Report on Validation ResultsThe deliverable will focus on the evaluation and assessment of CLARUS Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Security as a service for CLARUSThis deliverable describes the security services incorporated in the CLARUS archiecture, which include identity and access management and key and risk management Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Quality assurance plan (including the Project Handbook)This deliverable will include information about timescales, reporting information, and finance information. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Requirements Specification V2As a delta document with regard to V1, this document will refine requirements specifications for the final version of the CLARUS platform. In particular it will take into consideration intermediate results of the project achieved in WP5 and WP6. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Requirements specification V1It will include a set of CLARUS requirements (functional and nonfunctional, technical and social) with priorities and definition of possible limitations and constraints Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Data management planIn this deliverable we will Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Open Research Data Pilot | 2020-02-26 |
CLARUS benchmarking test suiteThis deliverable will describe the benchmarking test suite to be applied to the CLARUS platform Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Demonstrators, pilots, prototypes | 2020-02-26 |
The CLARUS platform V2This document will specify the design of CLARUS platform as well as a user manual. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Demonstrators, pilots, prototypes | 2020-02-26 |
Legal and ethical requirementsThis deliverable Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Final progress report, financial statement and reviewAs in D1.3, for the second year. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
The CLARUS modules V1This document will specify the detailed design of the CLARUS solution Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
CLARUS brochureCLARUS brochure Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
Dissemination and standards report V1An initial dissemination plan will be produced after 6 months, and revised versions that also cover standardisation efforts will be produced at 12-month intervals. Results of standards monitoring, analysis and dissemination activities will be included in this report. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
Dissemination and standards report V2An initial dissemination plan will be produced after 6 months, and revised versions that also cover standardisation efforts will be produced at 12-month intervals. Results of standards monitoring, analysis and dissemination activities will be included in this report. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
An attack-tolerant framework for the cloud V1This report will specify the framework provided by CLARUS to cope and preserve cloud services. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |
New security techniquesAs a result of the work in Task 3.2, a report will be produced describing the original research contribution given by the new or improved privacy-preserving techniques that will be obtained from the study on the limitations of current state-of-the-art methods and techniques. In particular, the report will describe original research contribution to the problem of secure cloud storage in cloud computing. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-07-2014 |
Documents, reports | 2020-02-26 |