The page lists 29 deliverables related to the research project "WeLive".
title and desprition | type | last update |
---|---|---|
WeLive framework requirements and architecture v2A second version of the specification of the functional and non-functional requirements of WeLive’s stakeholders. In addition, the overall architecture of WeLive infrastructure will be re-defined together with its main components including component interfaces, technologies, external APIs and the different sources of data that will be used for feeding the framework. The second version of this deliverable will include a set of requirements to ensure a wider acceptability of the solution, e.g. usability, accountability and ethical aspects. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Collaboration and Clustering Activities Report v2A second version of a detailed report with the collaboration plan and a summary of collaboration activities to be updated at the end of each reporting period. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Guidelines for the integration and population of the WeLive environment v1This document will include technical, methodological guidelines and best practices for the initial population of the WeLive environment. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Collaboration and Clustering Activities Report v1A detailed report with the collaboration plan and a summary of collaboration activities to be updated at the end of each reporting period. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Website, communication assets and dissemination material v3The main assets required to create an identity for the project will be created early in the project. The materials and in particular project’s website will be constantly updated including information about dissemination activities to be carried out by the consortium and public deliverables. Also it is expected to include a summary presenting the advances attained by the project in the different stages of the project. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Websites, patent fillings, videos etc. | 2018-10-31 |
WeLive Evaluation Report v2This report includes an evaluation plan describing methods for collecting user feedback, and analysing the data for the second stage of the pilot. Further the document describes the actual main findings of the evaluation in respect to predefined KPIs. Citizen insights will be elaborated in order to showcase success and failure points in the system. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
WeLive Ethics Assessment and Data ProtectionThis deliverable will contain all the Ethics aspects that should be taken into account during the project lifespan and the data protection policy and measures applied in each member of WeLive consortium. This document will be also submitted to the REA on M3 of the project just right after the relevant WPs start and before its submission it requires the approval from the Ethics Committee. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Methodologies to involve and encourage stakeholder participationThe methodologies and process to achieve high involvement and participation from stakeholders will be defined. This deliverable will pay special attention to the methodologies and criteria to be used for the research participants recruitment including the informed-consent templates. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Trento, Bilbao, Finish Region and Novi Sad environment v1This document reports the WeLive environment setup in Trento, Bilbao, Novi Sad and the Finish region by integrating the WeLive components into the their respective SmartCity platforms. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Report on the Open Services Layer v1This deliverable represents the first version of Open Service Framework, including the design and implementation of the Building Blocks concepts and the Visual Composer application to be supplied for pilot activities Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Trento, Bilbao, Finish Region and Novi Sad environment v2This document reports the WeLive environment setup in Trento, Bilbao, Novi Sad and the Finish region by integrating the WeLive components into the their respective SmartCity platforms. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Website, communication assets and dissemination material v1The main assets required to create an identity for the project will be created early in the project. The materials and in particular project’s website will be constantly updated including information about dissemination activities to be carried out by the consortium and public deliverables. Also it is expected to include a summary presenting the advances attained by the project in the different stages of the project. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Websites, patent fillings, videos etc. | 2018-10-31 |
Second Phase Pilots Execution and MonitoringReport on problems and solutions faced during the second stage of the trial. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
WeLive Communication & Dissemination Plan v1This report will contain the initial plan and report of the communication and dissemination strategy and activities of the WeLive Project results among different communities. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
WeLive Ethics Assessment and Data Protection v2A second version of this document will be submitted to the European Commission right before the starting of pilot phase II (M26) including a status report on the ethical monitoring from the External Ethics Committee. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
First Phase Pilots Execution and MonitoringReport on problems and solutions faced during the first stage of the trial Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Citizens´ & Stakeholder\'s Engagement & Cooperation Plan v1Engagement plans for the users in all the cities including details about the Ideas and Apps contests to be organized. There will be two versions, one before the first phase of the pilots and another one afterwards. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Definition of the WeLive Service Co-creation and Innovation approachThe theoretical basis upon which service co-creation and innovation will be tackled in WeLive will be defined. Furthermore, a specification of the technical support to put in practice the service co-creation and innovation viewpoint will be made. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
WeLive framework requirements and architecture v1This document will include a specification of the functional and non-functional requirements of WeLive’s stakeholders. In addition, the overall architecture of WeLive infrastructure will be defined together with its main components including component interfaces, technologies, external APIs and the different sources of data that will be used for feeding the framework. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
WeLive Evaluation Report v1This report includes an evaluation plan describing methods for collecting user feedback, and analysing the data. Further the document describes the actual main findings of the evaluation in respect to predefined KPIs. Citizen insights will be elaborated in order to showcase success and failure points in the system. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Social, economic and transparency analysis and recommendations v1Assesses the impact of WeLive from social, economic, and transparency point of view. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Guidelines for the integration and population of the WeLive environment v2This second version will include guidelines and best practices for the integration and population of the WeLive environment by new municipalities outside the project. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Website, communication assets and dissemination material v2The main assets required to create an identity for the project will be created early in the project. The materials and in particular project’s website will be constantly updated including information about dissemination activities to be carried out by the consortium and public deliverables. Also it is expected to include a summary presenting the advances attained by the project in the different stages of the project. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Websites, patent fillings, videos etc. | 2018-10-31 |
Data Management PlanData Management Plan for Open research data pilot. It is released as part of D8.6 Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Open Research Data Pilot | 2018-10-31 |
WeLive Communication & Dissemination Plan v2This report will contain the initial plan and report of the communication and dissemination strategy and activities of the WeLive Project results among different communities. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Data Management Plan final versionData Management Plan for Open research data pilot. Final version Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Open Research Data Pilot | 2018-10-31 |
Citizens´ & Stakeholder\'s Engagement & Cooperation Plan v2Engagement plans for the users in all the cities including details about the Ideas and Apps contests to be organized. There will be two versions, one before the first phase of the pilots and another one afterwards. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Social, economic and transparency analysis and recommendations v2Assesses the impact of WeLive from social, economic, and transparency point of view after the second stage of the pilot. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |
Documents, reports | 2018-10-31 |
Report on the Open Services Layer v2This deliverable represents the second version of Open Service Framework, including the design and implementation of the Building Blocks concepts and the Visual Composer application to be supplied for pilot activities, created including all the corrections and improvements identified during the first phase of pilots execution. Programme: H2020-EU.3.6. - Topic(s): INSO-1-2014 |