The page lists 23 deliverables related to the research project "P2P-SmarTest".
title and desprition | type | last update |
---|---|---|
Integration Demand Side Management and DER for P2P Energy TradingThis deliverable will provide final solutions for the integration of demand side management and DER using P2P energy trading mechanisms including the specifications of standard products and detailed scenarios for Test Cases for WP6. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Alternative P2P based control paradigm of distribution networks and technical requirements on the associated ICT infrastructureThis deliverable will develop alternative P2P control paradigm of distribution networks and investigate the technical requirements on the associated ICT infrastructure (i.e. communication techniques, information exchange and state estimation techniques). Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Dissemination planThis deliverable will report the expected dissemination activities within P2P-SmarTest project Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Benchmark report of the performance of DSOs’, Retailers’, TSOs’, Suppliers’, Service providers’ and Aggregators’ current business modelsThis deliverable will report the performance and content of current P2P ecosystem players’ business models. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
ICT solutions for P2P communication in smart gridsThis deliverable will provide final ICT solutions for P2P energy trading networks. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Description of the implemented real test bedsThis deliverable will provide a detailed description of the real test beds implemented in this work package Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Report of Regulatory, Business, and Technological enablers, limiting factors/barriers and challenges of P2P energy transferThis deliverable will analyse and report the regulatory, business, and technological factors – classified as enablers, limiting factors/barriers, and challenges – influencing P2P energy transfer currently and in the future. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
P2P Energy Trading: Market design and optimizationThis deliverable will provide innovative market arrangements and advanced optimization techniques for P2P energy trading Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
P2P-based Probabilistic and Predictive Control FunctionsThis deliverable will report the probabilistic and predictive control functions that are integrated to enable and facilitate the P2P based energy trading and better network operation under extremely dynamic and uncertain conditions. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Internal and external websiteAn internal collaborative web-based platform will be operational from M2, in order to facilitate the communication and information exchange among the partners. External website is also operational. Maintenance handled in WP7 Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Specification of test bedThis deliverable will provide information on the test bed architectures to be developed during this work package. A detailed specification of the hardware and software components will be provided. The set of tests to be performed will also be included. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Key performance Indicators for P2P energy trading communicationsThis deliverable will provide initial KPIs for tasks T3.2 and T3.3 to use in benchmarking of feasibility. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Website and updatesThis deliverable will disseminate the public information on project activities on a project web site Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Qualitative and quantitative models for a more resilience P2P operation of distribution networksThis deliverable will report the fault-error-failure models for the three coupled infrastructures (power, telecom, and control), qualitative and quantitative models for fault propagation, and solutions for less interdependent and more robust applications: fault tolerance and self-healing. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Report of Alternative business opportunities and business models for DSOs, Retailers, ESCOs, Service providers, Aggregators, and Consumers to facilitate P2P energy exchangeReport of Alternative business opportunities and business models for DSOs, Retailers, ESCOs, Service providers, Aggregators, and Consumers to facilitate P2P energy exchange Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Analysis of existing telecom networks and requirements for P2P smart gridsThis Deliverable will analyse existing telecom networks and identify requirements and scenarios needed in WP3. P2P-SmarTest business models from WP2 and technical requirements from WP4 will be taken into consideration. The output will be fed back to WP2 and WP4 for revision of models. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Quantify the benefits from introducing P2P energy exchange at the local, community and regional levels from the perspective of the stakeholders involved in P2P energy exchangeThis deliverable will quantify the benefits of P2P energy exchange for the different stakeholders at different levels (local, community, regional levels) Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Midterm workshopThis deliverable will evaluate and disseminate the information on project activities and exploitation plans to its stakeholders, partly in cooperation with other LCE6-10 projects. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Conclusions and recommendationsThis deliverable will provide the conclusions and recommendation drawn from the tests performed during task 6.4. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Final WorkshopThis deliverable will evaluate and disseminate the information on project activities and exploitation plans to its stakeholders, partly in cooperation with other LCE6-10 projects. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Exploitation planThis deliverable will evaluate and disseminate the information on project activities with respect to exploitation of the achieved results of P2P-SmarTest project Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Certification Mechanisms to measure the confidence and reliability of the energy transactions.This deliverable will provide Certification KPIs and Monitoring Requirements for WP3 and WP6. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Device-to-device and hybrid sensor – telecom infrastructure specifications for smart energy gridsThis deliverable will provide D2D and hybrid sensor network – telecommunications infrastructure specifications with interim results for P2P energy trading. The output will be fed back to WP2 for revision of business models and WP4 for technical model revision Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |