The page lists 27 deliverables related to the research project "ConnectinGEO".
title and desprition | type | last update |
---|---|---|
Feedback system description and results reportReport on the description and results of the publicly sign-on accessible feedback system, based on a catalogue integrating the observation inventory. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
ConnectinGEO methodologyReport describing the ConnectinGEO methodology to be developed and tested during the project and to be promoted beyond the end of the project. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Mid term revision of the data management planThe Data Management Plan (DMP) will be reviewed as requested in http://ec.europa.eu/research/participants/data/ref/h2020/grants_manual/hi/oa_pilot/h2020-hi-oa-data-mgt_en.pdf. The review will be conducted in collaboration with WP1 and WP5. The deliverable will include the outcome of task 3.3. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Proposal of EVs for selected themesReport on the first proposal of EVs for selected themes. It will include description and justification of inclusion. It will collect drafts of SBA-specific EVs for Carbon (CMCC), Health and Pollution (CNR-IIA), Ecosystems (CNR-ISAC), Biodiversity (CNR- ISSIA), Energy (ARMINES), Disasters (TIWAH) and Oceans (CSIC). It will also include a report on the Co-located Essential Variables Workshop on M7. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
EVs current status in different communities and way to move forwardReport on the Essential Variables current status in the scientific community and the strategy to push them forward. This report will collect the results of an internal project meeting about the current status of the EVs and determine how to make progress. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Project Advisory Board composition and communication channelsReport on the Project Advisory Board (PAB) composition and the communication channels between the PAB and the ConnectinGEO consortium and signed MoUs Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Other | 2019-06-05 |
Strategic view for the sustainability of ENEON after the end of the projectReport on the strategic view for the sustainability of ENEON after the end of the project, including the activities undertaken during the project. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Gap analysis draft reportGap analysis draft report to focus EO networks on the provision of timely observations based on the Discovery and Access Broker (DAB) and GEOSS Common Infrastructure (GCI) content. It will aslo include a report on the Co-located Gap Analysis Workshop on M16 (WS6). Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
ENEON methodology for management and coordination and first plenary Workshop minutesThe report on the ENEON plenary Workshop (WS2) will gather the minutes and all the information regarding the plenary. The workshops will also be used to build a collection of frameworks and best practices across domains and stakeholders that will be collected in this deliverable. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
ConnectinGEO dissemination and exploitation planDescription of the ConnectinGEO dissemination and exploitation plan based elaborated during the project. This will be done both as outreach and in a collaborative feedback environment. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Scientific publication compendiumReport describing the scientific publication achieved during the project. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Common criteria in the project stakeholder and industry challengesReport gathering the common challenges criteria to be applied in the project through the stakeholder and industry challenges pilot cases. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Data Management Plan (DMP)Report on the Data Management Plan (DMP) elaboration and execution, in which will be specified what data will be open in ConnectinGEO as the project is participating in the Open Research Data Pilot. The document will outline how research data will be handled during a research project, and after it is completed and will follow the template in Annex 1 for the EC DMP guidelines document http://ec.europa.eu/research/participants/data/ref/h2020/grants_manual/hi/oa_pilot/h2020-hi-oa-data-mgt_en.pdf. It will be done in collaboration with WP1 and WP5 Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Report on observations, measurements and gaps in observation systems reported by the communitiesReport on the list of observations, measurements, gaps, sensors, procedures, and practices used currently or expected in the future in observation systems reported by the communities. It will also includes the Citizen science workshop report (WS4). It will be a kind of a row list of classified feedback. D6.2 will be more elaborated material based on D3.4 and the other methodologies of the project. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Observation inventory description and results reportDraft report on the inventory. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
SDG workshop reportThe report on the SDG (Sustainable Development Goals) Workshop will gather the minutes and all the information regarding the workshop. The workshops will also be used to build a collection of frameworks and best practices across domains and stakeholders that will be collected in this deliverable Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Connecting Earth Observation Networks in Europe Book\"A open book (with ISBN; both on paper and in PDF) with the provisional title of \"\"Connecting Earth Observation Networks in Europe\"\" that will collect the results of the results in collecting the current networks, that gap analysis the priorities and the recommendations for fixing those. It will also cover the formation and sustainability of a permanent integrated network of EO networks. This book has to be done in the context of GEO and presented as a EU contribution to GEO. We will look for a formula to promote the book in a GEO Plenary.\" Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Observation networks tutorials and portfolio of best practicesReport on the collection of best practices and tools for observation networks and data exchange. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Websites, patent fillings, videos etc. | 2019-06-05 |
Observation inventory requirements, database schema and queryable fieldsReport on the observation inventory requirements, database schema and queryable fields to be adopted during the project. The observation inventory will be based on GCI Information, DAB, and Copernicus services catalogues. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Media presence compendiumReport describing the media presence achieved during the project. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Websites, patent fillings, videos etc. | 2019-06-05 |
Gap analysis final report including prioritizationGap analysis final report to focus EO networks on the provision of timely observations based on the Discovery and Access Broker (DAB) and GEOSS Common Infrastructure (GCI) content, including prioritization of these gaps. It will also include a report on the Plenary reviewing Workshop on M22 (WS7). Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Results of the Data Management Plan (DMP) and Report on the participation in the Pilot on Open Research Data in Horizon 2020Revision and description of the results of the Data Management Plan (DMP) and participation in the Pilot on Open Research Data in Horizon 2020. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Observation inventoryContains the Observation inventory database based on GCI Information, DAB, and Copernicus services catalogues that will allow to assess the coherency, continuity, accuracy and accessibility of the information available. It will provide an assessment of the availability and accessibility of data required to derive the information (e.g. EV) or to run the models that generate the forecasts and projections, and it will support a prioritization of the gaps that need to be addressed. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Other | 2019-06-05 |
Observation inventory database description and results reportThe revised version of the 4.2 report, also including a revision of the database schema if needed Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Plan for disseminating and communication of the project’s resultsThe Dissemination and Communication Plan will set out the details of the different types of dissemination activities to be undertaken during the project lifetime. In addition to the dissemination approach that will be applied, this deliverable also provides the necessary guidance for an efficient dissemination strategy. The Plan identifies communicating objectives and goals, the target audience, the message, medium and means and the timeline for communicating actions. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Cooperation with other relevant project and initiatives reportReport describing the activities of cooperation with other relevant project and initiatives undertaken during ConnectinGEO with particular attention to the ERA-NET GEO. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |
Report on stakeholders and industry challengesReport describing the stakeholders and industry challenges used during the project. It will also include a report on the Co-located Industry challenge Workshop on M14 WS5. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18a-2014 |
Documents, reports | 2019-06-05 |