The page lists 61 deliverables related to the research project "SESAME".
title and desprition | type | last update |
---|---|---|
Best Practise Guidelines for liquid metal flow simulationBest Practise Guidelines for liquid metal flow simulation Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Multi-scale complete core simulationsMulti-scale complete core simulations (with contribution from CEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CIRCE-HERO blind simulationsCIRCE-HERO blind simulations (with contribution from NRG) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D: CFD models and validationTALL-3D: CFD models and validation (with contribution from KTH) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Pragmatic CFD approach for wire wrapped rod bundlesValidation of pragmatic CFD approaches for simulation of wire wrapped rod bundles Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Code validation against TALL-3D solidification dataCode validation against TALL-3D solidification data Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
FIV scaling laws water vs. liquid metalReport on scaling laws for FIV considering water vs. liquid metal (with contribution from NRG) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
POD-ROM modellingPOD-ROM modelling of pool thermal hydraulics Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
PHENIX dissymmetric test simulation validation: summary reportPHENIX dissymmetric test simulation validation: summary report (with contributions from KIT, NRG, IRSN, ENEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Non-uniformly heated FPS experiments in the NACIE-UP facilityNon-uniformly heated FPS experiments in the NACIE-UP facility Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Inter-wrapper flow CFD approachValidation of a CFD approach to evaluate the influence of inter-wrapper flow Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
KALLA Inter-wrapper flow experimentsKALLA inter-wrapper flow experimental results Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Coarse-mesh modellingDevelopment and validation of coarse-mesh models Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CIRCE-HERO PLOFA experimentCIRCE-HERO PLOFA experiment Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
SESAME Newsletter 4SESAME Newsletter 4 Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
Uncertainty quantification for liquid metal flow simulationUncertainty quantification for liquid metal flow simulation Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
V&V methodologies for liquid metal flow simulationV&V methodologies for liquid metal flow simulation Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
NACIE_UP simulation validation: summary reportNACIE_UP simulation validation: summary report (with contributions from UROM and GRS) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D first series simulations: summary reportTALL-3D first series simulations: summary report (with contributions from GRS, TUM, and ENEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D STH / CFD simulationsTALL-3D STH / CFD simulations Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Multi-scale model development and validationMulti-scale model development and validation (with contribution from KIT) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CFD analyses for blocked and unblocked fuel assembliesValidation of CFD analyses for an unblocked and blocked grid spacer fuel assembly and upscaling to an ALFRED fuel assembly Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Solification modelling: summary reportSolification modelling: summary report Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CIRCE-HERO simulation validation: summary reportCIRCE-HERO simulation validation: summary report (with contribution from NRG) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Coarse-grid CFD for the MYRRHA coreCoarse-grid CFD application to the full MYRRHA core Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Solidification model developement and validationSolidification model developement and validation using Meliloo and TALL-3D data Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D simulation validation: summary reportTALL-3D simulation validation: summary report (with contributions from GRS, TUM, and ENEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Nuclear Liquid Metal Thermal Hydraulics TextbookNuclear Liquid Metal Thermal Hydraulics Textbook (based on lecture series material, best practise guidelines, V&V, uncertainty qualification) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
FLUENT solidification simulationsFLUENT simulations of Meliloo and TALL-3D facilities Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CFD analyses of BFPSCFD post-test analysis of the BFPS experiments in NACIE-UP and application to an ALFRED fuel assembly Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
FIV model development in FluentFIV model development in Fluent Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Meliloo: pre-test simulations and measurementsMeliloo: pre-test simulations and measurements Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Training material for CFD code trainingTraining material for CFD code training (TransAT) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CIRCE experiment: pre-test, data-set and analysisCIRCE experiment: pre-test, data-set and analysis (with contributions from NRG and CRS4) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
SESAME Lecture Series publicationSESAME Lecture Series publication Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Infinite wire wrapped rod bundleHigh fidelity numerical reference data for an infinite wire wrapped rod bundle Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D setup for second seriesTALL-3D setup for second series Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Solidification model performanceSolidification model performance Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
NACIE-UP data for PLOFANACIE-UP data for PLOFA Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D test setupTALL-3D experimental test setup description for both test series Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
SESAME Newsletter 3SESAME Newsletter 3 Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
SESAME Newsletter 2SESAME Newsletter 2 Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
TALL-3D solidification test setupDescription of the modified TALL-3D test facility and test matrix for solidification experiments Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Reference data for rod bundleHigh fidelity numerical reference data for flow and heat transfer in a rod bundle Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Local heat transfer modelLocal heat transfer model Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
BFPS experimentsExperimental results of flow blockage experiments in the BFPS test section of the NACIE-UP facility Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
NACIE_UP blind simulationsNACIE_UP blind simulations (with contributions from UROM and GRS) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
PHENIX blind simulationsPHENIX blind simulations (with contribution from KIT, NRG, IRSN, ENEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Wire wrap experimentResults of matched index of refraction wire wrap rod bundle experiments Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Entire core analysis in MATRAEntire core analysis in MATRA Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
CIRCE experiment: CFD model validationCIRCE experiment: CFD model validation (with contributions of NRG and ENEA) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Preliminary design of MIR facilityPreliminary design of a matched index of refraction facility for wire wrapped rod bundles Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Project visual identityProject visual identity (logo, graphical chart, reporting and presentation templates) Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
SESAME Newsletter 1SESAME Newsletter 1 Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
Meliloo setupDescription of the Meliloo test facility and test matrix Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
TALL-3D setup for first seriesTALL-3D setup for first series Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Project presentationProject presentation Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
CIRCE-HERO test setupCIRCE-HERO experimental setup and test matrix for PLOFA Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
Project public websiteProject public website Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Websites, patent fillings, videos etc. | 2020-02-26 |
NACIE-UP setup for PLOFANACIE-UP setup for PLOFA Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |
KALLA Inter-wrapper flow setupKALLA experimental setup and test matrix for inter-wrapper flow Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014 |
Documents, reports | 2020-02-26 |