The page lists 34 deliverables related to the research project "CAxMan".
title and desprition | type | last update |
---|---|---|
D5.6 Metrology workflow for AM workpieces, including WP6 task integrated into sub workflows targeting the different use casesIntegration of the metrological aspects in the in the workflow including the design phase. (TRIMEK; SINTEF) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.9 Presentation and reports at FoF-related events and Industrial organisations and user communitiesPresentation and reports at FoF-related events and Industrial organisations and user communities (SINTEF; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D4.5 Validation strategy for residual stress evaluation induced by the MD processValidation strategy for residual stress evaluation induced by the MD process (CIMNE) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D1.8 Final requirements to Cloud InfrastructureD1.8 Final requirements to Cloud Infrastructure (DFKI) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.5 Report on Standardization – Year 2D9.5 Report on Standardization – Year 2 (JOTNE; CNR-IMATI) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D2.7 Interactive design and design workflows for AMInteractive design and design workflows for AM (SINTEF; FRAUNHOFER; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.6 Outreach plan for Year 3Outreach plan for Year 3 (FRAUNHOFER; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D2.4 Shape representation for AMShape representation for AM (SINTEF; FRAUNHOFER, All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
CAxMan Cloud demonstratorA demonstrator based on one or more workflows that demonstrates the feasibility of the CAxMan cloud services to potential users of CAxMan in the cloud. Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Demonstrators, pilots, prototypes | 2019-11-11 |
D1.7 Interoperability year 2The revised set up of the PLM-database is described with data formats and standards used, and further adaptations described (JOTNE; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D6.6 NC workflow for AM workpieces, including WP6 task integrated into sub workflows targeting the different use casesNC workflow for AM workpieces, including WP6 task integrated into sub workflows targeting the different use cases (MISSLER) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D3.4 AM process plan assessmentProcess plan assessment based on design and virtual prototypes (MISSLER; Trimek, CNR-IMATI) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D2.5 Analysis tools for AM, non-linear setting non-linear settingAnalysis tools for AM, non-linear setting (CNR-IMATI; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D4.7 Manufacturing ChainManufacturing Chain (CIMNE) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D1.10 Interoperability year 3The final set up of the PLM-database described with data formats and standards used. Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.7 Report on Standardization – Year 3Report on Standardization – Year 3 (JOTNE; CNR-IMATI) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.8 Three short video filmsThree short video films (ARCTUR; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D4.1 Specifications for thermal and stress analysisSpecifications for thermal and stress analysis (STAM) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D3.1 Requirements: Process planning for AMRequirements: Process planning for AM (STAM; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D2.2 IGA based shape representation, initial versionImport of CAD and a first version of the 3-variate volumetric structure addressing IGA and AM (SINTEF; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D8.1 The Innovation Shop PortalThe innovation shop portal is a continuously evolving shop portal that starts in Month 12, when sufficient results are available, and will continue to be improved until the end of the project (BOC; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D9.1 Project Logo and graphic identityProject Logo and graphic identity (ARCTUR; SINTEF, FRAUNHOFER) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D6.1 Requirements: NC in Additive ManufacturingNC in Additive Manufacturing (STAM) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D2.3 Analysis tools for AM, linear settingAnalysis tools for AM, linear setting (CNR-IMATI; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D2.1 Requirements: Design for Additive ManufacturingRequirements: Design for Additive Manufacturing (FRAUNHOFER; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D1.5 Intermediate requirements to Cloud InfrastructureIntermediate requirements to Cloud Infrastructure (SINTEF; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.2 Project Web Site and Project PresentationProject Web Site and Project Presentation (ARCTUR; SINTEF, FRAUNHOFER) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D1.2 Initial requirements to revision Cloud InfrastructureInitial requirements to revision Cloud Infrastructure (SINTEF; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D1.4 Interoperability year 1The initial set up of the PLM-database is described with data formats and standards used, and further adaptations described (JOTNE, All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D9.4 Outreach plan for Year 2Outreach plan for Year 2 (FRAUNHOFER; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D8.2 The Business Model InfrastructureThe business model infrastructure is a collaborative business model canvas infrastructure, which is provided to interested stakeholders (BOC; All) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Other | 2019-11-11 |
D9.3 Report on Standardization – Year 1Report on Standardization – Year 1 (JOTNE; CNR-IMATI) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D4.3 Validation strategy for thermal analysis of MD processValidation strategy for thermal analysis of MD process (CIMNE) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |
D3.2 AM process planning workflowsSpecification of process planning workflows for the AM technologies selected in CAxMan workflows (SINTEF; STAM, MISSLER, CNR-IMATI, TRONRUD, NOVATRA) Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-08-2015 |
Documents, reports | 2019-11-11 |