The page lists 10 deliverables related to the research project "INCOVER".
title and desprition | type | last update |
---|---|---|
INCOVER case-study 1Demonstrator of INCOVER Case-Study 1 validated at TRL 7-8 (output of WP1, WP2 and WP3) Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |
Hydrothermal carbonisation process for bio-solids beneficial useRequirements of design, specifications of the implementation and description of operation strategies during steady state performance of HTC process at case-study 3 (TRL 8) (output of T3.4). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Documents, reports | 2020-04-23 |
Project Website and communication materialProject website with public and private areas to collaborate among partners and to disseminate the public results of the project. The contents will be updated every 3 months (output of T5.5). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Websites, patent fillings, videos etc. | 2020-04-23 |
Report on the contribution to the standardizationDescription of the interactions developed with the standardization Technical Committees and contributions to the ongoing and future standardization developments (output of T4.4). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Documents, reports | 2020-04-23 |
DSS and ICT tool: guidelines on use and operationTool design. Guidelines regarding the use and operation of DSS and ICT tool to be used by INCOVER stakeholders (output of T4.3). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |
Communication and Dissemination planDissemination and communication plan with the actions to be taken for maximum visibility of the project results, upon completion of the project (output of T5.5). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Documents, reports | 2020-04-23 |
INCOVER case-study 2Demonstrator of INCOVER Case-Study 2 validated at TRL 7-8 (output of WP1, WP2 and WP3). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |
Communication and Dissemination MaterialAll dissemination and communication activities developed during the project will be describedplan, with the actions to be taken for maximum visibility of the project results, upon completion of the project. All leaflets, brochures, and other communication/promotion materials produced will be attached to this report (output of T5.5 and T5.7). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Documents, reports | 2020-04-23 |
INCOVER case-study 3Demonstrator of INCOVER Case-Study 3 validated at TRL 7-8 (output of WP1, WP2 and WP3). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |
Smart irrigation systems at demo scaleDemonstrator of smart irrigation system validated at case-study 1 and 2 (TRL 8) (output of T3.3). Programme: H2020-EU.3.5.4. - Topic(s): WATER-1b-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |