The page lists 7 deliverables related to the research project "HYPERBIOCOAT".
title and desprition | type | last update |
---|---|---|
Project communication plan M36 updateThe plan will be finally checked on their indicators and a final summary of their results will be included Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2020-03-06 |
Biodegradable packaging for food applicationBionatic will report on the performance of their specific materials that will be produced in the WP3 and WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2020-03-06 |
Biodegradable packaging for cosmetic applicationStefanski will study the performance of their materials that will be produced in the WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2020-03-06 |
Biodegradable packaging for medical device applicationCOSMETIC will study the performance of their materials that will be produced in the WP4 in the manufacturing of packaging prototypes and the major parameters of the end packaging unit. Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2020-03-06 |
Project communication plan M18 updateThe first plan D7.1 will be checked on their indicators and modified if considered necessary Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2019-10-28 |
Project dissemination actions M18This plan, in connection with the exploitation plan will be developed in order to establish and update a strategy for the actions and review past / future activities to achieve a proper dissemination and use of the foreground developed during the project. On this stage will be centred in the plans for dissemination during the last 18months of the project, where the results of the project start to appear. Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2019-10-28 |
Project communication planThis plan will be proposed for validation by General Assembly, and will detail the strategy adopted (audience, type and hierarchy of actions, responsible persons) and planning for the project duration. Several performance indicators will be proposed to assess the level of visibility and efficiency of actions. The main goal of the communication task will be to propose activities to inform a wide audience: public, media but also closer stakeholders Programme: H2020-EU.3.2.6. - Topic(s): BBI.VC1.R3-2015 |
Documents, reports | 2019-10-28 |