The page lists 11 deliverables related to the research project "ARGO".
title and desprition | type | last update |
---|---|---|
Detailed project plan including team set-upA detailed project plan including team set-up will be prepared by the Coordinator. The Coordinator will keep the plan updated constantly during the overall project life, including modifications that can arise during the project development. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2020-03-11 |
ARGO 1.0 F.M. assessed performance through on ground qualification testsDescription and results of testing through on ground facilities, for ARGO 1.0 assessment at TRL8 (Task 6.1) Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2020-03-09 |
ARGO 1.0 Flight Model DemonstratorFlight Model Demonstrator to be used to assess the innovative product performance by tests carried out by night sky test campaign (Task 6.1) and final dedicated IOD Mission (Task 6.4). Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Demonstrators, pilots, prototypes | 2020-03-09 |
User manual of ARGO 1.0 Flight ModelThe user manual will describe the attitude measuring system output data together with the allowed working conditions and relative performance. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2020-03-09 |
ARGO 1.0 E.M. assessed performance through night sky testPerformed assessment tests and results achieved both in laboratory and with the night sky test campaign performed in Task 4.2. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2019-07-18 |
Communication actions and updated dissemination material - release 1Communication actions performed within the project & Dissemination Material prepared within Task 7.1. to be added to Periodic Reports. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2019-07-18 |
ARGO 1.0 E.M. DemonstratorDemonstrator to assess the innovative product performance by tests carried out by night sky test campaign (Task 4.2) and early shared IOD or balloon (WP 5). Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Demonstrators, pilots, prototypes | 2019-07-18 |
Hardware Components User ManualThe User manual of ARGO 1.0 hardware components will be provided, suitable for ARGO 1.0 integration. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2019-07-18 |
Dissemination materialDissemination Material prepared within Task 7.1 to facilitate since the project beginning the communication actions towards end-users and relevant stakeholders. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Websites, patent fillings, videos etc. | 2019-07-18 |
Requirement Specification and Test PlanARGO 1.0 performance specifications and test plan for assessing the prototype expected performance from TRL6 to TRL9 Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2019-07-18 |
Performance assessed by tests performed in simulated environmentThe report will describe the test performed within Task 2.2 and the obtained results. Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017 |
Documents, reports | 2019-07-18 |