The page lists 18 deliverables related to the research project "INNOWAG".
title and desprition | type | last update |
---|---|---|
Dissemination toolsPreparation and continuous delivery (as/when required) of all dissemination tools included in the dissemination plan (newsletters, stencil, materials for website, final conference, etc.) Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Websites, patent fillings, videos etc. | 2020-03-13 |
Models for reliability, statistical information, real time health status of the rolling stock, prognostic analysis, and economic dataA report illustrating the predictive analytical models developed for different types of damage relevant to the freight wagon. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Modelling and analyses of novel lightweight design solutionsDeliverable report including the simulation results and analyses in relation with the structural strength and vehicle dynamics. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Wizard tool for maintenance policy optimisationA report describing the Wizard tool for maintenance policy optimisation, i.e. a guided procedure for the operators to define the optimal maintenance policy based on reliability model of the system, the condition monitoring information available and cost data. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Exploitation ReportAn exploitation report about market uptake / standardisation & regulation potential will be delivered at the end of the project. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Freight vehicle lightweight concept designDeliverable report presenting the novel lightweighting concepts to be integrated into a functional wagon design. In addition to the concept design of INNOWAG lightweight freight vehicle, the report will include the analysis and selection of materials. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Report on the use of the results by Shift2RailThis report will describe the level of use and acceptance of the results in the S2R-CFM-IP5-01-2015: Development of functional requirements for sustainable and attractive European rail freight, and more in general in relevant Shift2Rail IPs and CCAs. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2020-03-13 |
Integration of cargo monitoring and predictive maintenance solutions on the lightweight wagon conceptDeliverable report providing recommendations and technical solutions for the integration of the project outcomes in a single intelligent wagon concept. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-11-08 |
Energy concept for cargo condition monitoringDeliverable report presenting the required setup to enable the powering of the cargo condition monitoring system (potentially using a combination of vibration-based and RF-based energy harvesting technologies). Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-11-08 |
Wireless data communication concept for cargo condition monitoring systemDeliverable report presenting elaborated concept for wireless data communication to ensure secure, regular and reliable transfer of information from the condition monitoring system to the respective recipients. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-11-08 |
Benchmark and market drivers for an integrated intelligent and lightweight wagon solutionDeliverable report presenting the benchmark results in all three areas/work streams, with respect to the identified market drivers and aspects related to the integration of novel technologies and solutions into a single concept. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-31 |
Set up an exploitation plan for the projectAn exploitation plan for INNOWAG main results will be delivered at the beginning of the work package. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |
Overall measurement concept for cargo condition monitoring systemDeliverable report presenting sensing system configuration, and details on installation, components for monitoring goods in both a container and a tank wagon. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |
Dissemination and communication planSummary report describing the communication and dissemination tools planned to be developed and employed within the project. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |
Project websiteDevelopment of functional project website. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Websites, patent fillings, videos etc. | 2019-05-14 |
Project management and quality planDeliverable report including guidelines, Gantt, Deliverable and Milestone tables, document and presentation templates, deliverable peer review process, risk register, etc. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |
Specifications and requirements for INNOWAG technologies and solutionsDeliverable report summarising the requirements and technical specifications for the innovative technologies and solutions envisaged by INNOWAG’s work streams, including considerations on aspects related to a fully integrated system. This report validates milestone MS2 (agreement on specifications for further innovations). Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |
Cost-driven and reliability driven analysis of wagon condition dataA report summarising the selection of condition-related and maintenance data and the analyses performed on the data in a cost driven and reliability driven way. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-03-2015 |
Documents, reports | 2019-05-14 |