The page lists 16 deliverables related to the research project "DOMINOES".
title and desprition | type | last update |
---|---|---|
Overview of the validation frameworkReport covering the setup of the three validation sites, their tools, components, resources and systems including the integration with the local market architecture. The framework preparation will go through an internal review and acceptance process to guarantee feasibility. The deliverable is part of task T4.1. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Design and implementation of a data security frameworkThis deliverable reports the architecture and design of the data security framework created in the DOMINOES project. It shows the development technologies used in the design and the simulation conducted in different dynamic environments. The deliverable is part of task 2.5. The data security framework will be reviewed and accepted by the project partners. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Scalable local energy market architecture (second release)The report will introduce the second release of a transparent local market design and a final implementation to be used in WP3 and WP4. The architecture is verified/considered ready if all the project partners approve the feasibility of the architecture and the dependencies to other WPs have been analysed. The deliverable is part of task 2.2. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Information exchange processes and solutions to integrate local and centralized energy marketsThe deliverable provides a description of the sources and types of information that will be shared in local markets. An overview of system components that can establish a connection from energy communities to centralized markets. The deliverable is part of task 2.3. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Tools for local energy market and end-user interactionThis deliverable will specify tools that will enable end-user engagement with the local market processes. The tools include functionalities for consumers/prosumers and interfaces towards the local market architecture. The deliverable is part of task 2.4. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Use cases and application scenarios requirementsThis deliverable will describe the complete set of use cases and application scenarios requirements conveying all value chain perspectives. The use cases will take into account stakeholders like DSO, TSO, Energy Provider, Aggregator and Local Community. This deliverable is part of task 1.2. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Standardization proposals Year 1The deliverable lists all standardization activities of all project partners for the first year. The deliverable\'s focus is on the status of new standards. The report will be part of task 6.2. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Implementation plan for the validation environmentThe implementation plan will summarize descriptions of the validation environments, requirements for their implementation and equipment & systems specifications, following the works of tasks 1.1 and 1.2 (D1.1, D1.2 and D1.3). Furthermore, main KPIs for validation of key project results will be defined. Preliminary KPIs were set out in the Grant Agreement, which will be revised in this deliverable to ensure they correspond with the defined use cases. This deliverable is part of task 1.3. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Scalable local energy market architecture (first release)This report will introduce the first release of a transparent local market design including first implementation version and instructions for market structures, transactions, interfaces and responsibilities. The architecture is verified/considered ready if all the project partners approve the feasibility of the architecture. The deliverable is part of task 2.2. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Enabling technology for transparent local p2p energy marketsThis deliverable provides a review covering the technologies required to set up a local market architecture. The report will focus on analysing technology related to local trading, information exchange towards markets and transactive control of resources. This deliverable is part of task 2.1. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Dissemination Activity Report Year 1The report, as part of task 6.1, lists all dissemination activities of all project partners from the first year. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Formulation of alternative local market place enabled business modelsThe review will deliver a definition of alternative DSO business models, including a specification of the frameworks formulating relationship environment between the local market and its stakeholders, and related strategic use of contracts. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Local market reference architecture and business requirementsThis deliverable will present the requirements of DSOs, prosumers/consumers, aggregators, BRPs and retailers for the local markets. Based on the business requirements a reference architecture will be delivered that will serve as a baseline for WP2. As means of verification, the architecture is available to other tasks and the requirements have been accepted by the partners. The deliverable is part of task 1.1. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
ICT platform and connected energy network reference architecture designThis deliverable, as part of task 1.1, will describe the reference architecture design from the ICT connected energy network technology perspective. The report will define how the main network components will be organised and will communicate meeting interoperability, reliability and data protection requirements. The deliverable will be completed after iterations with local market reference architecture and business requirements and validation environment definition. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Project guidelinesThe deliverable includes a description of the guidelines related to the project internal processes. Items included in the deliverable will include at least a) submission and review of deliverables; b) quality management procedures; c) risk management; d) meeting principles. The guidelines will be verified with the acceptance from all project partners. Guidelines preparation is part of the project coordination task 7.1. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-04-16 |
Project website onlinePublic website, which will include a list of DOMINOES publications, events, news, etc. The deliverable is verified ready once the website is open for public access. The deliverable is part of task 6.1. Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Websites, patent fillings, videos etc. | 2020-04-16 |