Opendata, web and dolomites

nextBioPharmDSP project deliverables

The page lists 14 deliverables related to the research project "nextBioPharmDSP".

 List of Deliverables

nextBioPharmDSP: list of downloadable deliverables.
title and desprition type last update

Layman report

A description of the overall completed project , the procees optimised and the benefits that it will provide will be organised in a magazin-like document, explained in a non technical langauge, and spread among the regulatory agencies, stakeholder and media.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Report about the involvement in the international initiatives

As part of dissemination plan we have included the participation to two main international initiatives: 1: MIT-Novartis continuous manufacturing consortium; 2.Continuous Manufacturing and Crystallisation [CMAC]. Before the end of the project we will deliver a report with the results connected to these initiative and the project benefits derived from this involvement.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

SWOT for final process

Assessment of next-generation DSP process (SWOT analysis, Cost & environmental impact assessment (COG, CAPEX, OPEX), LCA). Evaluation of further possible improvements.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Project’s end meeting with related agreements and final project’s conference in Ljubljana

In order to conclude the consortium Agreement, many different legal documents will be signed during the last consortium meeting. All the documents will be collected and stored for 5 years by LEK.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Newsletters and press release

Preparing and sending newsletters (different contents for each type of stakeholder) about the specific developments of the project. due date every 6 months

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Stakeholder board completed and ready to receive updates (mailing list created)

A detailed list of stakeholder (related to the project innovation and to all connected results) will be created, and a communication strategy will be implemented. These organisation will receive our updates on a regualar basis (please refer to the deliverable 8.7). Of utmost importance are the National Regulatory Agencies, the European Medicine Agency and the Food and Drug Administration)

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-17

Project Website updating

The Project website is updated with the project developments on a regular basis (once per month after the website is available).

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-17

Workshops

A report of the presentation at specialised wotrkshops (that have been identified by each partner in the DoA) will be gathered in one report that will be part of the progress (and financial report).Months, 18 - 36 - 48

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-17

Conferences (link on the website – event and paper presented)

A report of the presentation at specialised conferences (that have been identified by each partner in the DoA) will be gathered in one report that will be part of the progress (and financial report).Months, 18 - 36 - 48

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-17

P&ID (flow diagram)

P&ID (flow diagram) for continuous chromatography disposable equipment.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Other 2019-10-17

Scientific publications (link on the website after pre-review and possible embargo time)

The scientific papers connected to the project activities will be made available (after the innovation manager review and magazine pre-review and possible embargo time) through a a direct link that will be pubblished on the project web-site.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Definition of requirements for AAT

Detailed definition and description of requirements (detailed definition of requirements, evaluation of available tools).

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17

Gender Language Control

A report about the gender mitigation measures undertaken by the consortium in every phase of the dissemination and management will be edited and delivered to the EC in the Progress and financial reports. Due date: 18-38 - 48

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-10-17

Single-use flowpath definition and fit test on equipment

Definition of single-use assemblies, assemblies drawings and fit test on equipment.

Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014

download deliverable 

Documents, reports 2019-10-17