The page lists 14 deliverables related to the research project "nextBioPharmDSP".
title and desprition | type | last update |
---|---|---|
Layman reportA description of the overall completed project , the procees optimised and the benefits that it will provide will be organised in a magazin-like document, explained in a non technical langauge, and spread among the regulatory agencies, stakeholder and media. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Report about the involvement in the international initiativesAs part of dissemination plan we have included the participation to two main international initiatives: 1: MIT-Novartis continuous manufacturing consortium; 2.Continuous Manufacturing and Crystallisation [CMAC]. Before the end of the project we will deliver a report with the results connected to these initiative and the project benefits derived from this involvement. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
SWOT for final processAssessment of next-generation DSP process (SWOT analysis, Cost & environmental impact assessment (COG, CAPEX, OPEX), LCA). Evaluation of further possible improvements. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Project’s end meeting with related agreements and final project’s conference in LjubljanaIn order to conclude the consortium Agreement, many different legal documents will be signed during the last consortium meeting. All the documents will be collected and stored for 5 years by LEK. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Newsletters and press releasePreparing and sending newsletters (different contents for each type of stakeholder) about the specific developments of the project. due date every 6 months Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Stakeholder board completed and ready to receive updates (mailing list created)A detailed list of stakeholder (related to the project innovation and to all connected results) will be created, and a communication strategy will be implemented. These organisation will receive our updates on a regualar basis (please refer to the deliverable 8.7). Of utmost importance are the National Regulatory Agencies, the European Medicine Agency and the Food and Drug Administration) Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Websites, patent fillings, videos etc. | 2019-10-17 |
Project Website updatingThe Project website is updated with the project developments on a regular basis (once per month after the website is available). Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Websites, patent fillings, videos etc. | 2019-10-17 |
WorkshopsA report of the presentation at specialised wotrkshops (that have been identified by each partner in the DoA) will be gathered in one report that will be part of the progress (and financial report).Months, 18 - 36 - 48 Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Websites, patent fillings, videos etc. | 2019-10-17 |
Conferences (link on the website – event and paper presented)A report of the presentation at specialised conferences (that have been identified by each partner in the DoA) will be gathered in one report that will be part of the progress (and financial report).Months, 18 - 36 - 48 Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Websites, patent fillings, videos etc. | 2019-10-17 |
P&ID (flow diagram)P&ID (flow diagram) for continuous chromatography disposable equipment. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Other | 2019-10-17 |
Scientific publications (link on the website after pre-review and possible embargo time)The scientific papers connected to the project activities will be made available (after the innovation manager review and magazine pre-review and possible embargo time) through a a direct link that will be pubblished on the project web-site. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Definition of requirements for AATDetailed definition and description of requirements (detailed definition of requirements, evaluation of available tools). Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |
Gender Language ControlA report about the gender mitigation measures undertaken by the consortium in every phase of the dissemination and management will be edited and delivered to the EC in the Progress and financial reports. Due date: 18-38 - 48 Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Websites, patent fillings, videos etc. | 2019-10-17 |
Single-use flowpath definition and fit test on equipmentDefinition of single-use assemblies, assemblies drawings and fit test on equipment. Programme: H2020-EU.2.1.4. - Topic(s): BIOTEC-4-2014 |
Documents, reports | 2019-10-17 |