The page lists 23 deliverables related to the research project "DORA".
title and desprition | type | last update |
---|---|---|
Initial specification of DORA ArchitectureD3.1 will include initial description of the DORA architecture for overall project discussion, particularly within WP2 and WP6, and to launch tasks 3.2 and 3.3 as well as WP4 Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Usability Assessment reportD6.3 will summarize the results from the Usability pre-tests (test of conceptual variants / first prototype test / pre-test before trial phase). It will be a summary of the three intermediate short reports containing information on the identified usability problems and recommendations for improvements that will be provided to the developers of the system during the development phase Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Use cases manualDefinition of use cases for different scenarios of DORA system deployment. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Dissemination plan and database of dissemination activities - Update 2Report on DORA dissemination on a detailed level including a database of all dissemination activities and events attended. The deliverable will also include an operational level plan that identifies activities, events and targets for the upcoming period. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Technical and legal requirementsReport on the technical and legal issues to take into account for the development and integration of the components of DORA information system – outcome of tasks 2.4, 2.5. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Database of dissemination activitiesReport on DORA dissemination on a detailed level including a database of all dissemination activities and events attended. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Pilot showcase at TXL and PMIThe deliverable D7.5 will report on the public Pilot showcase demonstrations organized at both pilot sites. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Websites, patent fillings, videos etc. | 2019-10-16 |
Technical Evaluation and Assessment reportD6.2 will summarize the results from the technical pre-tests (Validation of functionality / Performance assessment / Troubleshooting tests / Platform test). It will further describe alternative and/or backup approaches for proper and uninterrupted service provisioning. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Final evaluation reportD6.4 will summarize the findings resulting from the impact, usability and process evaluation. It will be the central document to demonstrate to which degree the objectives of the project were achieved and how they were achieved (process evaluation). It will lead into a description of aspects and recommendations that have to be taken under consideration for other cities that wish to implement the system in their cities (transferability). Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
DORA Service SpecificationD3.3 will include site specific service specifications in the terminal (Indoor Location and Navigation, Waiting Time Detection) and landside transport (Multimodal Router) Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Integration reportD4.6 will include report on the component integration, including corresponding tests, into the complete DORA solution. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Report on pilot executionReport on pilot results for both sites Berlin and Palma de Mallorca. It will include all implementation details and technical experience. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Pilot implementation planReport on readiness to pilot including technical set-up, organizational and operational aspects as result of activities carried out in tasks 5.1 and 5.2. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Intermediate Pilot implementation planReport on readiness to pilot including technical set-up, organizational and operational aspects as result of activities carried out in tasks 5.1 and 5.2. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Users groups and mobility profilesDefinition of DORA´s users groups including for each one a description of specific mobility needs and patterns and traffic behaviour. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Evaluation planD6.1 will serve as a reference document for all project partners concerning all evaluation activities to achieve within the project. Further it will summarize the evaluation approach based on three pillars, and describe in detail how and when evaluation activities will be carried out and who will accomplish them (indicators / methods for data gathering / time-plan / partners involved). Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Awareness and dissemination strategyThe deliverable D7.1 will establish a guideline and strategy for project communication, outline the dissemination plan and the approach taken in regard to various stakeholder groups and objectives. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Market analysis reportDocument with the main results of the state of the art review and the market analysis carried out. Relevant findings will be structured in three main parts: Demand analysis Supply analysis and integrated SWOT Analysis. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Specification of DORA ApplicationsD3.4 will include specifications of the Operation Centre as well as user and web applications, to be developed in WP4 Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Dissemination plan and database of dissemination activities - Update 1Report on DORA dissemination on a detailed level including a database of all dissemination activities and events attended. The deliverable will also include an operational level plan that identifies activities, events and targets for the upcoming period. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Analysis of Suitable Cooperation and Business modelsReport on analysis of the DORA business requirements as well as potential benefits and costs, and definition of potential business and cooperation models for the DORA concept Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |
Project websiteEstablishment of fully operational project website, which will be maintained and continuously restructured in accordance with the project needs. Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Websites, patent fillings, videos etc. | 2019-10-16 |
DORA ArchitectureD3.2 will include full specification of the DORA architecture, the required data exchange models, and necessary interfaces among various DORA components and for external communications Programme: H2020-EU.3.4. - Topic(s): MG-1.3-2014 |
Documents, reports | 2019-10-16 |