Opendata, web and dolomites

MONROE project deliverables

The page lists 20 deliverables related to the research project "MONROE".

 List of Deliverables

MONROE: list of downloadable deliverables.
title and desprition type last update

Second year report

Second year report (M24): Report summarizing the status of the project up to this point in time.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Interim dissemination report

Interim dissemination report (M18): Report outlining the plans and current status for dissemination activities, guidelines and prioritizations with milestones.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Selection and design of the new node

Selection and design of the new node (M12): (Report) This deliverable provides a detailed description of hardware design including the selection and testing process. It describes the capabilities and limitations of the nodes.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

First year report

First year report (M12): Report summarizing the status of the project up to this point in time.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Management tools

Report on project management tools (M03): Report describing the internal online management and collaboration resources (wiki, repositories, etc.) and the procedures for effective usage of those (tracking work activities, sharing information, publication approval, collaborative editing of reports, etc.).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Maintenance Routines

Maintenance routines (M18): Report describing the maintenance goals and the maintenance procedures.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Robust node recovery method

Report on the robust node recovery method, specifically its design and implementation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Report on use cases

Report describing MONROE’s experiment use cases that are defined based on the analysis of the state of the art of MBB measurement and assessment techniques, and based on the system requirements identified in MONROE to tackle the performance assessment and monitoring of MBB networks and services built on top of MBB (both existing and innovative services).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Experimental SW as EaaS

Experimental SW as Eaas (M24): Software including experimental scripts and report describing selected experiments, instructions on how to use them and expected results.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-10-16

Data Management Plan

Data management plan (M06): Report on the data management plan for managing the OPEN DATA

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Open Research Data Pilot 2019-10-16

Node deployment

Node deployment (M15): Report on deployment process and list of node hosts.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Maintenance Activities

Maintenance activities (M36): Report documenting all maintenance activities including the node maintenance, backend maintenance and data maintenance.as well as describing how to address the problems.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Final Dissemination and open data exploitation report

Final Dissemination and open data exploitation report (M41): Reports documenting the dissemination and open data activities with quantified impact of different measures.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

External user\'s experiences

External user report (M41): Report documenting the final outcomes and experiences with the platform from the external users.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Report on experiments and results

Experiments and results (M41): Report describing the experiments that are run by the partners, analysis tools used and the results of the experimental.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Third year report

Third year and final report (M41): Report summarizing the status of the project up to this point in time, and final report.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Quarterly Reports

Quarterly Management Report for the X-th quarter: set of short periodic deliverables generated and submitted to the Commission every three months, containing basic facts and figures on a per-quarter basis, including brief updates on work progress and use of human resources (M3, M6, M9, M12, M15, M18, M21, M24, M27, M30, M33, M36, M41).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Exploitation on Sustainability

Report on Exploitation on Sustainability (M41): Report on the ongoing and planned exploitation by project partners and models for sustaining the MONROE platform.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

Final Implementation

Report describing the updates on the platform’s implementation with extensions and modification based on the feedback from users.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16

User manual and initial user\'s experiences

User manual and initial user experiences (M24): Report describing the user manual, the user selection process, first user workshop and the initial experiences with the platform from the external users.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-10-16