Opendata, web and dolomites

iCIRRUS project deliverables

The page lists 20 deliverables related to the research project "iCIRRUS".

 List of Deliverables

iCIRRUS: list of downloadable deliverables.
title and desprition type last update

User equipment UE offloading & MDC definition for 60 GHz networking

UE parameters will be defined with reference made to results arising from WP2 and WP3 for MDC requirements in terms of latency and throughput specifications

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Verification of Ethernet as a transport protocol for fronthaul/midhaul

Explores the impact of mapping fronthaul(and midhaul) over Ethernet, and the possibility of mapping Ethernet over fronthaul. Verifies Ethernet as a suitable transport for iCIRRUS architectures including analysis of emerging paradigms and compression functions.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

2nd year Dissemination, Communication, Standardisation and Exploitation: Plan and Report of Activities

This deliverable comprises a report of the plan and the activities carried out during the 2nd year of the project with regard to WP6. A summary version will contribute to the annual report

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Data Management Plan

iCIRRUS will participate in the Open Research Data pilot and a Data Management Plan (DMP) will be produced.Progress updates to the DMP and the requests for use of the open data will be reported annually

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Open Research Data Pilot 2019-05-30

1st year Dissemination, Communication, Standardisation and Exploitation: Plan and Report of Activities

This deliverable comprises a report of the plan and the activities carried out during the first year of the project with regard to WP6. A summary version will contribute to the annual report.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Mobile cloud networking and virtual mobile

This will use a virtual machines and mobile device/clone simulation to produce an optimal architecture design

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Methods, materials and platforms for testing of high bandwidth mobile wireless solutions

Describes preplanning of test cases, and implementation of validation facilities of tested control, data, mobile cloud planes.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Website created

The project website will be created with a “.eu” domain name targeted. The public part of the website will be the responsibility of WP6. Here, the internal, consortium area of the website will be setup.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Updated low-cost, energy-efficient Fronthaul Architecture

Taking input on high speed requirements from Task 3.4, the SON concept from T3.3 and the preliminary architecture. Lessons learnt during the project in other WPs (2, 4 and 5), the architecture is updated, refreshed and used for dissemination purposes.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

iCIRRUS techno-economic analysis and business case

A techno-economic analysis for the iCIRRUS architecture deployment will be undertaken. It will take inputs from D2.1 and D2.2, and from the continued validation tests in WP5 up until almost the end of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2019-05-30

Preliminary Fronthaul Architecture Proposal

Defines an iCIRRUS Ethernet Transport Network Architecture. Based on inputs from T3.1 and findings from WP2 and 4.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Final Dissemination, Communication, Standardisation and Exploitation: Plan and Report of Activities

This deliverable comprises a report of the plan and the activities carried out during the final year of the project with regard to WP6. A summary version will contribute to the project final report.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Joint resource management & cooperative allocation

Exploiting technical outputs from WP2 and WP3 and feeding forward into WP5 and WP6, a study using envelope optimization will be performed. A range of scenarios produced under varying constraints will be reported.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Validation test results and analysis evaluation

Provides the compound results analysis of test runs and conclusion of validation against predefined KPI

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

iCIRRUS UE D2D & D2I interfacing

Interacting with WP2 and WP3, simulation models will be run to check interoperability, throughput and buffer requirements. Envelopes for satisfactory operation will be defined.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Tools, scenarios and results analysis methods for validation test

Describes test definition, infrastructures required and expected results for each of test cases.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

iCIRRUS intelligent C-RAN architecture

Using and referring to the selected METIS scenarios, an architecture definition with initial performance specifications will be made. This will be used to feed into the activities of WP3 and WP4, and initial planning for the validation setups in WP5.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Validation test setup and execution report

Describes test runs of control, data, mobile cloud planes test cases.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

SLA and SON Concept for iCIRRUS

A concept for how to enable a service level agreement and how to optimise the fronthaul/midhaul network using SON concepts, will be captured. Indicating the optimal locations of monitoring and intelligent functions the deliverable feeds into T3.4 to support the updates architecture.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18

Refined iCIRRUS architecture definitions and specifications

Taking new knowledge gained from WP3, WP4 and WP5, a refined architecture with specifications will be developed.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-06-2014

download deliverable 

Documents, reports 2018-12-18