The page lists 25 deliverables related to the research project "Bio-HyPP".
title and desprition | type | last update |
---|---|---|
Final summary project reportLinked to task T6.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-03-06 |
Technology demonstrator having operated for continuous 100 hoursD4.6 “Technology demonstrator having operated for continuous 100 hours†will be influenced by the delay of D4.2 and D4.3 as well because the data/characteristics from the separate test rigs is necessary to verify the concept of the technology demonstrator 12/19 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-03-06 |
Operation of technology demonstrator of hybrid power plant of MGT and SOFCD4.5 “Well tested technology demonstrator of hybrid power plant of MGT and SOFC†will be influenced by the delay of D4.2 and D4.3 as well because the data/characteristics from the separate test rigs is necessary to verify the concept of the technology demonstrator 12/19 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Characteristics of the hybrid power plant with emulated SOFCD4.3 “Characteristics of the hybrid power plant with emulated SOFC†can’t be accomplished before 04/19 3 due to delayed D4.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-03-06 |
System performance and dynamic models validationlinked to task T1.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-12 |
Technology demonstrator of the top-economic layout SOFC readyLinked to task T4.5 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-02-12 |
Compressor surge study under large variable volumesLinked to task T3.3 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-12 |
LCA and LCC analysis of the Hybrid Power PlantLinked to task T1.5 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Guidelines for health and safety, standardization and certificationLinked to task T1.6 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Control system implementation and validationLinked to task T3.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Hybrid system emulation resultsLinked to task T3.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Optimised Electrical driveLinked to task T2.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Second Stakeholders’ vision documentLinked to task T5.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Innovative Business ModelLinked to task T1.4 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
SOFC stack characterization and optimisationLinked to task T2.3 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
SOFC auxiliary component characterisationLinked to task T2.3 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Real time dynamic modelsLinked to task T1.3 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Leaflet and poster on the projectLinked to Task T5.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Combustor prototype manufacturedLinked to task T2.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Upgraded hybrid system emulation rigsLinked to task T3.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Public website set-upLinked to Task 5.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Websites, patent fillings, videos etc. | 2020-02-07 |
First Stakeholders’ vision documentLinked to task T5.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Static thermodynamic system modelsLinked to task T1.2 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Other | 2020-02-07 |
Analysis of market opportunities and legislative assessmentLinked to Task T1.1 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Documents, reports | 2020-02-07 |
Hybrid Power Plant emulator (real MGT with SOFC emulator) with optimised componentsD4.2 “Hybrid Power Plant emulator _real MGT with SOFC emulator_ with optimised components†(delivery delay from May 2018 to November 2018 has been reported already) can probably not be accomplished before 03/19 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2014 |
Demonstrators, pilots, prototypes | 2020-02-07 |