Opendata, web and dolomites

EURO 5G project deliverables

The page lists 27 deliverables related to the research project "EURO 5G".

 List of Deliverables

EURO 5G: list of downloadable deliverables.
title and desprition type last update

Final report on support to the working groups

this deliverable will report on the work involved with the creation and operation of the community working groups at the 5G-PPP level in cooperation with the 5G Infrastructure Association and the NetWorld2020 ETP.

The Work group approach will be flexible to allow uptake of other ideas, as identified by 5G community and other 5G initiatives, and support new working groups as needed.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

5G standardisation requirements

Report from the 5G PPP working group on pre-standardisation, this deliverable will identify relevant standardisation and regulatory bodies to align with (such as ETSI, 3GPP, IEEE, ITU-R (incl. WPs) and WRC (including e.g. ECC PT1).

The deliverable will present a roadmap of relevant standardization and regulatory topics for 5G, evaluate existing roadmaps at international level, and propose own roadmap for 5G being aligned at international level.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final report on programme progress and KPIs

this deliverable will report on the programme progress against the programme level Key Performance Indicators for phase one of the 5G-PPP.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Analysis of project portfolio

This deliverable will organise the project portfolio according to technical perspectives (e.g. technical domains and components) and architectural perspectives (e.g. E2E and functional architectures) and build the overall PPP phase 1 portfolio analysis.

It will also analyse the potential gaps in the phase 1 projects portfolio and encourage possible interactions with other projects potentially addressing complementary research and innovation themes outside of the PPP phase 1, e.g. in other EC strategic objectives, Eureka Cluster and national programmes.

it may also propose a phase 2 Pre-structuring Model to highlight the vital aspects that need to be considered in phase 2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

5G innovation potential and SME participation

This deliverable will present the innovation potential based on the 5G infrastructure and possible roles of SMEs.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on programme progress and KPIs

this deliverable will report on the programme progress against the programme level Key Performance Indicators and propose corrective activities if needed.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final liaison report

Final liaison report on European and global 5G initiatives and established contacts will summarise the outcome of workshops and European positions as well as the discussions with non-European initiatives based on the results of facilitated workshops and information exchange. The focus will be on the 5G system concept, pre-standardisation and frequency spectrum allocation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final report on 5G programme governance and operation, including event support and recommendations for phase 2

this deliverable will report on the work of the main 5G-PPP bodies; Steering and Technology Boards, ensuring efficient collaboration among the 5G projects and their effectiveness in the second year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final 5G vision, and roadmap for 2017/18

Final Version of the 5G Infrastructure Association Working Group “ 5G Vision”. This vision will include results from the 5G-PPP Projects, the NETWORLD2020 Communty, FP7 projects related to 5G and 5G Infrastructure Association members’ documents.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final report on communication and public relations activities

This deliverable will summarise all communication and public relations activities during the second project year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final management report

The management reports will include management information as required by the guidelines of H2020.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Interim Spectrum requirements for beyond 2020

The 5G-PPP working group on 5G spectrum will produce this deliverable containing the following discussions:
• New spectrum at millimetre wavelengths for 5G services addressing potential utilisation of frequencies above about 30 GHz for access to 5G services. Clearly, this depends on a number of technical and business assumptions. Furthermore, as similar work is undertaken by other bodies (e.g. ITU-R), the studies in Euro-5g will be in support of these activities and of supplementary nature.
• Spectrum management
o Importance of exclusive licensing - Address the importance of licensing to guarantee QoS and for the investments in building mobile networks.
o New spectrum sharing methods - Address schemes for sharing and new commons, presumably along with spectrum micro trading and cognitive radio technologies.

• Spectrum for backhaul - Address the importance of wireless backhaul for the expected high density future small cell scenario.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final report on community building and support

This deliverable will report on the community building and stakeholders’ engagement activities performed and how the individual project activities have achieved synergy in the second year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Final report on support for Advisory Group

This deliverable will report on the work done to capture the industrial views on the strategic direction and commercial relevance of the ongoing 5G-PPP work and the 5G Infrastructure Association from high level representatives of participating companies and how this information was shared with the Partnership Board and to the Steering Board of the 5G-PPP programme in the second year of the 5G-PPP.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate liaison report

Intermediate liaison report on European and global 5G initiatives and established contacts will summarise the identified 5G initiatives and programs in Europe and beyond and the established contacts. In addition the outcome of workshops and European positions as well as the discussions with non-European initiatives will be described based on the results of facilitated workshops and information exchange. The focus will be on the 5G vision and requirements.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on support to the working groups

this deliverable will report on the work involved with the creation and operation of the community working groups at the 5G-PPP level in cooperation with the 5G Infrastructure Association and the NetWorld2020 ETP.

The Work group approach will be flexible to allow uptake of other ideas, as identified by 5G community and other 5G initiatives, and support new working groups as needed.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Initial analysis of project portfolio and programme KPIs

This deliverable will provide initial findings from the analysis of the newly selected 5G-PPP projects and the major outcomes from the key EC FP7 projects related to 5G onthe coverage of the 5G challenges and KPIs.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Promotion strategy

This Deliverable will detail the promotion strategy of the project

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on communication and public relations activities, including promotion strategy update

This deliverable will summarise all communication and public relations activities during the period and will provide an updated communication and public relations plan for the second project year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

5G PPP collaboration agreement and its implementation

This deliverable will report on the implementation of the collaboration agreement among the 5G PPP projects as concluded within the programme Steering Board and particular measures taken for its implementation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on support for Advisory Group

This deliverable will report on the work done to capture the industrial views on the strategic direction and commercial relevance of the ongoing 5G-PPP work and the 5G Infrastructure Association from high level representatives of participating companies and how this information was shared with the Partnership Board and to the Steering Board of the 5G-PPP programme in the first year of the 5G-PPP.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

International, National and peer Initiatives Strategy and Plan

This document will lay down the core strategy, objectives and operational aspects that will be pursued by WP4 to establish a comprehensive plan of action to reach and create liaisons to 5G players and initiatives in Europe and beyond.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Communication Hub

This deliverable will provide a description of the web site content and further web channels. It will also detail the maintenance of information flow which will be maintained in Task 3.1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate 5G vision and roadmap

Version 1 of the 5G Infrastructure Association Working Group “ 5G Vision”. This vision will include results from the 5G-PPP Projects, the NETWORLD2020 Communty, FP7 projects related to 5G and 5G Infrastructure Association members’ documents.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate management report

The management reports will include management information as required by the guidelines of H2020.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on community building and support

This deliverable will report on the community building and stakeholders’ engagement activities performed and how the individual project activities have achieved synergy in the first year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate report on 5G programme governance and operation including event support

this deliverable will report on the work of the main 5G-PPP bodies; Steering and Technology Boards, ensuring efficient collaboration among the 5G projects and their effectiveness in the first year.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-14-2014

download deliverable 

Documents, reports 2019-05-30