The page lists 22 deliverables related to the research project "HERCULES".
title and desprition | type | last update |
---|---|---|
Final Periodic reportFinal report of the project. It will include an overview of all outcomes of HERCULES, and it will refer to single final deliverables of all work-packages for details. It includes Data Management Report. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Project management planProvides detailed guidelines and project management plan. It includes the initial Data Management Plan. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Specification of Hardware PlatformsReport detailing the results from the platform evaluation and selection for each application (domain). Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Application RequirementsThis deliverable will list the application requirements and meaningful performance metrics of each application, taking into account the specific application domain (avionics and automotive). Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Detailed Characterization of PlatformsA detailed characterization / model of the performance and energy consumption of the chosen platforms that can be used in the development and evaluation of the schedulers in WP5. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Programming Model(s) analysis and selectionSpecification of the chosen programming model(s), including a survey on existing support on the platforms. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Open source strategy planThis deliverable will be a first draft of the exploitation strategy for the open source software: e.g., how it will be made available, under which license, and possible dissemination activities (presentations, tutorials) for it. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Year 1 Periodic reportPeriodic report after year1. It includes Data Management Report. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Collaboration and Communication ToolsA report describing all the tools set up to promote and support cooperation among partners. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Websites, patent fillings, videos etc. | 2020-01-28 |
Final BoardThe final board: one for the automotive (integrating application-specific hardware), one for the avionic application. Proper exploitation of potential FPGA modules and accelerators available on the boards. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Power-Aware Scheduling Algorithm for HostSpecification of a real-time scheduling algorithm for execution on the host that considers CPU scheduling as well as accesses to shared resources, such as memories, with the objective of minimizing power under real-time constraints. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Integrated Schedulability AnalysisSchedulability analysis that considers the combination of the proposed scheduling algorithm executing on the host and on the accelerators. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Optimized support for predictability in the accelerator programing environmentThe final prototype and a report describing the enhancements implemented for supporting predictability in the target programming model. Support for specification of real-time constraints and interface to RT-analysis tools and environment will be detailed. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Final dissemination reportA final summary of the dissemination activities performed in the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Multi-OS integration and VirtualizationThis deliverable resulting from Task 4.3 is a package containing the additional software components for the concurrent execution of Linux and ERIKA Enterprise on the same SoC, and for the synchronization and communication between the two OSs. The deliverable also contains a technical user manual explaining how to install and use the provided package. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Optimized runtime for parallel heterogeneous platformsThe final prototype of the heterogeneous runtime system, plus a report describing the architecture, design principle, main features and results obtained on a first set of benchmarks, in comparison with state-of-the art solutions. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Open source resultsThis deliverable will show the final plan for open source exploitation of the software produced in the project, together with a description of the dissemination activities performed to promote it. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Scheduling Algorithm for Parallel AcceleratorsSpecification of a scheduling algorithm for execution on accelerators that optimizes accelerator performance and minimizes energy consumption, subject to real-time constraints. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Lightweight RTOS - finalThis deliverable is a software package containing the final version of the lightweight RTOS for the reference many-core platform, developed in Tasks 4.2. The deliverable also contains a technical user manual explaining how to install and use the provided package. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Validation ReportA report of all validation activities on the reference applications running on the specific target architectures, describing the set of experiments performed to validate the use cases under each metric (e.g., energy consumption, performance/cost, predictability), and the improvements achieved with respect to the state-of-the-art and to the initial analysis performed in T1.1, and described in D1.1. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |
Real-time Linux - finalThis deliverable is a software package containing the final version of the real-time Linux OS for the reference many-core platform, developed in Tasks 4.1. The deliverable also contains a technical user manual explaining how to install and use the provided package. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Demonstrators, pilots, prototypes | 2020-01-28 |
Final exploitation planThis deliverable will contain the final market analysis for the domains targeted by the project, and will show the results achieved, that is, how the outcomes of HERCULES were/will be pushed in the target market areas. It will also contain the specific exploitation plans by all partners. Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015 |
Documents, reports | 2020-01-28 |