The page lists 14 deliverables related to the research project "MinWaterCSP".

 List of Deliverables

MinWaterCSP: list of downloadable deliverables.
title and desprition type last update

Delivery test facility

Delivery of manufactured components to test site, installation and commission of test facility. This will involve the successful construction of the full scale hybrid cooling unit. The installation of all measuring and data logging equipment will also be completed together with a strategy for data capturing and analysis.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-04

Full-scale CSP cooling fan

Full-scale CSP cooling fan manufactured and installed for testing. The full-scale CSP cooling fan will be installed in the full-scale test facility near SUN together with all measurement apparatus and data logging equipment.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-04

3D modelling hybrid cooling system

3D modelling of the hybrid cooling system for demonstration / marketing purposes as well constructability reviews and results. The model will be created in a typical commercial software CAD package and stored in electronic files.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-10-04

Scale model of CSP cooling system fan

Scale model of CSP cooling system fan manufactured and installed in wind-tunnel for testing. The deliverable will be a manufactured, scaled model.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-04

Communication / Dissemination actions at events – part 2

One report covering event participation and contributions (external and own events) – update for period since D10.4.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Dissemination actions: print/digital tools – part 3

One report covering press-releases, articles, eNewsletters and social media activity – update for period since D10.6.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Dissemination actions: Print/digital tools – part 2

One report covering press-releases, articles, eNewsletters and social media activity – update for period since D10.3.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Communication / Dissemination actions at events – part 3

One report covering event participation and contributions (external and own events) update for period since D10.7.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Communication and dissemination materials – part 1

One report covering project website, communication and dissemination materials.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Deluge test bundle constructed

Deluge test bundle constructed and commissioned at the relevant industrial site. This would involve the successful installation of the test bundle at the test site in Morocco, complete with all the measuring and data logging equipment. A visual inspection and data analysis strategy will also be in place.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-04

Dissemination actions: Print/digital tools – part 1

One report covering press-releases, articles, eNewsletters and social media activity.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Communication and dissemination materials – part 2

One report covering project website, communication and dissemination materials – update for period since D10.2.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

Communication / Dissemination actions at events – part 1

One report covering event participation and contributions (external and own events) for the past / future period.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Documents, reports 2019-10-04

30ft reference fan complete

30 ft reference fan manufactured and installed for testing. This fan will be delivered and installed in the existing air-cooled condenser of Matimba power station, RSA.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-02-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-04