Opendata, web and dolomites

INSPUR project deliverables

The page lists 10 deliverables related to the research project "INSPUR".

 List of Deliverables

INSPUR: list of downloadable deliverables.
title and desprition type last update

Report on general performances of INSPUR made products and quality controls

This deliverable will produce a quality report about INSPUR coated products, with focus on the compliance assessment of 1 Mt sample about aesthetics, technical, safety and performance parameters.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Documents, reports 2019-05-31

Videos concerning project advancements

(Month 6, Month 12, Month 18)

Realization of six-monthly videos related to INSPUR project updating and results, uploaded on the project website and on INSPUR social media pages.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

E-Newsletters and press releases

(Month 6, Month 12, Month 18)

Realization and publication of six-monthly newsletters about the project updating and outcomes, to be sent through mailing service and to be released by national and international press.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Dissemination materials (leaflets, brochures, etc.)

(Month 12, Month 18)

Development and printing of specific dissemination material about the INSPUR project results, including the realization of multi-language leaflets and postcards on project outcomes and dedicated social media pages.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Dissemination and exploitation plans, periodical updates

(Month 3, Month 12, Month 18)

Four-monthly updating reports about dissemination and exploitation plan, with evidence on the changes compared to the first version (D6.1) and a validation of forecasted budget for these activities.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Customers validation after product release

This report will include the results of the customers feedbacks collection about washing resistance, waterproofing, flexibility, visual performances, and end-users needs compliance, also through a survey about users acceptance.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Report on INSPUR testing methodologies and performance database

(Month12 first draft, Month18)

This report will include the coating tests procedures (through direct rolling and transfer) to validate the new INSPUR formulations, according to the different combination of substrates, materials, dyes and additives, firstly considering A4-sized samples and, for the second phase, small-scale coating line. Furthermore, in the document will be summarized (and updated) the results from feedbacks about the preliminary industrialization activities, including INSPUR manufacturing performances, QC responses, and final products performances measures.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Documents, reports 2019-05-31

Project Website, logo, coordinated graphic

The deliverable will provide the creation of INSPUR dedicated website, of INSPUR logo for project related items and for future commercial applications, and “INSPUR made” trademark coordinated image.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

INSPUR utilization guidelines for operators

This deliverable will be validated by the development of a manual with guidelines for INSPUR utilization (a tool for the training program for machine operators), including a protocol to store and manage INSPUR raw materials, a Safety-Health-Environmental profile, the personal protection requirements for machine operators, and a plant installation, setup and utilization report.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Other 2019-05-30

Quality control protocols

Development of a document about the specific control protocols for a reliable and stable quality of INSPUR bi-components resins, with a focus on the validation of the features of INSPUR components, considering humidity, OH/-NCO ratio, and final viscosity.

Programme: H2020-EU.2.3.1.;H2020-EU.2.1.2. - Topic(s): NMP-25-2015

download deliverable 

Documents, reports 2019-05-30