Opendata, web and dolomites

DESTINATIONS project deliverables

The page lists 39 deliverables related to the research project "DESTINATIONS".

 List of Deliverables

DESTINATIONS: list of downloadable deliverables.
title and desprition type last update

Results of SULP definition

Based on regional logistics context analysis, Sustainable Urban Logistic Plan for each pilot city (Madeira, Las Palmas, Rethymno, Elba, Limassol and Malta) will be produced including the identification of measures and priorities, ICT supporting tools, implementation plan and short/medium-term timelines, result indicators, budget plan, enforcement methods. SULP will be carried out as integrated part of the whole SUMP (WP2). The report will detail the results of SULP definition for all the sites as an output of T5.3.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-12

Implementation report on measures for safety and accessible public spaces

The report will detail the results of site preparation and planned demo activities, technology development and implementation of supporting actions for all the WP3 demo measures in each site as outputs of T3.2 and T3.3

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-12

User needs, requirements, ex-ante evaluation and design specifications for increasing safety and accessible public spaces

The report will detail the results of the users’ needs analysis for cycling, walking, attractive and accessible public space for the selected lab areas, and safe routes to school. It will also outline the details of the design specifications for increasing safety and accessible public spaces for all the WP3 demo measures in each site as outputs of Task3.2

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-12

Results from SUMP feasibility analysis (V2)

The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

DESTINATIONS business model catalogue

This deliverable provides an overview about the most promising business models developed during the project.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Project Data Management Plan (V3)

Updated version of the Project Data Management Plan

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Implementation report on PT enhancement

The report will detail the results of demo setup, implementation activities, ITS deployment and supporting actions for all the sites as outputs of T7.3 and T7.8

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Implementation report on shared mobility, e-infrastructures and supporting technologies

The report will detail the results of site preparation and planned demo activities, ITS deployment and implementation of supporting actions for all the WP4 demo measures in each site as outputs of T4.3 and T4.8

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Guidelines on the mobility and urbanization needs for Chinese tourists in Europe

A short report that will help the 6 DESTINATIONS ‘ sites and other EU cities: to understand China tourists’ needs, and to design the appropriate strategies and implement the appropriate measures to attract middle to high income Chinese tourists.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Local Data Management Plan (V3)

Updated version of the Local Data Management Plan

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Measure and Evaluation of technical ‘system performances indicators

The report will identify the main indicators for evaluating the ITS performances at site level during the demonstration of local measures respect to the specific target value. In this context the report will detail also the procedures for data collection in order to calculate the real system performances value during the operation of local measures. The report will summarise the outputs of T8.3.4

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Implementation report for measures targeted to mobility demand management and increased awareness for sustainable mobility

The report will detail results of demo setup, implementation activities, ITS deployment and supporting actions for all the sites as outputs of T6.3. It will capture how each site has engaged key stakeholders, set up commercial agreements and marketing strategies, derive common success factors and challenges faced, allowing for transfer and adaptation of approaches ahead of measure demonstrations.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Technical workshops and training plan (V2)

Updated version of the Technical workshops and training plan (D10.1)

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

Results from SUMP feasibility analysis (V3)

The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2020-02-07

SUMP Baseline

The baseline report will illustrate the analysis of the mobility context (key players and actors in the study area) and the structure of mobility patterns at a baseline year for all 6 sites, as a result of Task 2.2

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Draft Evaluation Plan

Draft plan for the evaluation of measures based on a common framework to be applied across the 6 sites, based on existing guidelines (e.g. MAESTRO & POINTER) and adapted to the DESTINATIONS focus on tourism related mobility. It will include also specific sections for the environmental, health and security assessment of the measures.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Project Newsletters

Starting in M9 and every six months thereafter (M9, 15, 21, 27, 33, 39 and 45), the project will publish and distribute a Newsletter with the view to inform the widest possible public and stakeholders, as well as similar CIVITAS project participants on all project development aspects, future events and activities at local, national and European levels in the areas of sustainable transport and sustainable tourism.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-12-03

Local Data Management Plan (V2)

updated version of the Local Data Management Plan

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Ethics Compliance report

The baseline approval and compliance for the rest of the project on Ethics requirements.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

User-needs and requirements, ex-ante evaluation, service design and ITS specifications for PT enhancement

The report will detail the results of the user-needs analysis, the definition of service requirements and the details of service and ITS specifications for all the sites as output of Task T7.2

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Results from SUMP feasibility analysis (V1)

The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Definition of sign off checklist for services operation

The report will detail the list of technical and functional verification tests to be carried out at site level in order to certify the technological effectiveness of ITS supporting the launch of demo measures. The report will summarise the outputs of T8.3.3

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Stakeholders\' maps and initiatives/tools for boosting the role of public and private stakeholders

A set of guidelines supporting partners in the involvement of and collaboration with local stakeholders for their specific activities at site level.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Project Data Management Plan

The report describes type of data that will be collected, processed or generated during the project and the methodology and standards that will be used to maintain and preserve this data during and after the completion of the project itself. The report will summarise the outputs of T1.6

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Project page on website

The project webpage, integrated within the main CIVITAS website, will present continuous updates of all facets of the project development, output, tools, news and media events

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-12-03

User-needs and requirements, ex-ante evaluation, service design and ITS specifications for measures targeted to mobility demand management and increasing awareness for sustainable mobility

The report, outlining the outputs of task 6.2, will summarise the findings of the users’ needs and requirements analysis, the ex-ante evaluation, including appropriate specifications for ITS and the design of solutions concerning the measures targeted to mobility demand management and increased awareness.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Local Data Management Plan for each site

The report describes for each site the data that will be collected, processed or generated during the project and the methodology and standards that will be used to maintain and preserve this data during and after the completion of the project itself. The report will summarise the outputs of T1.6

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Project Data Management Plan (V2)

Updated version of the Project Data Management Plan

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Communication & Dissemination Strategy

The strategy document will elaborate the internal and external dissemination & communication plans & actions at local, regional, national and supra-national level with the objective to reaching the widest possible audience with the DESTINATIONS achievements.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Evaluation Plan

Final plan for cross-site evaluation cross-checked with the impact and process evaluation requirements asked for all CIVITAS projects by the Support Action for Evaluation and Monitoring (CIVITAS SATELLITE).

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Compilation of SULP Baseline

Compilation of SULP baseline, user needs and requirements, ex-ante evaluation of logistics context analysis. Based on SULP baseline and user needs analyses, service models, operational schemes and specifications will be detailed in terms of collection/delivery procedures, involved actors, fleet management operations, access control, monitoring of parking lots and control enhancement, ICT tools. This report will include, for all the sites, the outputs from T5.2 and T5.4.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Stakeholder maps and guidelines for boosting the role of public and private stakeholders (PART2)

second part of the deliverable D8.1

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Social Media accounts in Facebook & Twitter set up

Facebook and twitter accounts will be established and regularly monitored and updated with the view to reinforce dissemination activities and support the platform of following cities and regions.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-12-03

Guidelines for the management of bid procedures and contracting

The report will provide guidelines to Site Managers and local involved actors how to define and manage the tendering and contracting process taking into account EU and GA rules. The guidelines will outline also the evaluation criteria for selecting the most effective bid on the basis of the technical specifications and the economic value. Finally a specific contract base structure complying with the EU indications will be drafted. The report will summarise the outputs of T8.3.2

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

User-needs and requirements, ex-ante evaluation, service design and ITS specifications for shared mobility and e-infrastructures

The report will detail the results of the users needs analysis, the definition of service requirements and the details of service and ITS specifications for all the WP4 demo measures in each site as outputs of Task T4.2

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Initial project leaflet

A DESTINATIONS leaflet will be published and diffused in order to present the main objectives and expected outputs of the project.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-12-03

Technical workshops and training plan

Short report with a planning of training and technical workshops (calendar and contents) according to implementations foreseen within the work packages, the knowledge of each site and the will and need for all to learn.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Guidelines for the design of ITS solutions supporting project measures

The report will provide the methodology and related guidelines supporting the Site Managers ITS design on the basis of the sites objectives, users requirements and service targets. The report will summarise the outputs of T8.3.1

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03

Results of Kick-Off-Method Training in the sites

Report gathering results of Kick Off Training organised in each site.

Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015

download deliverable 

Documents, reports 2019-12-03