The page lists 39 deliverables related to the research project "DESTINATIONS".
title and desprition | type | last update |
---|---|---|
Results of SULP definitionBased on regional logistics context analysis, Sustainable Urban Logistic Plan for each pilot city (Madeira, Las Palmas, Rethymno, Elba, Limassol and Malta) will be produced including the identification of measures and priorities, ICT supporting tools, implementation plan and short/medium-term timelines, result indicators, budget plan, enforcement methods. SULP will be carried out as integrated part of the whole SUMP (WP2). The report will detail the results of SULP definition for all the sites as an output of T5.3. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-12 |
Implementation report on measures for safety and accessible public spacesThe report will detail the results of site preparation and planned demo activities, technology development and implementation of supporting actions for all the WP3 demo measures in each site as outputs of T3.2 and T3.3 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-12 |
User needs, requirements, ex-ante evaluation and design specifications for increasing safety and accessible public spacesThe report will detail the results of the users’ needs analysis for cycling, walking, attractive and accessible public space for the selected lab areas, and safe routes to school. It will also outline the details of the design specifications for increasing safety and accessible public spaces for all the WP3 demo measures in each site as outputs of Task3.2 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-12 |
Results from SUMP feasibility analysis (V2)The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
DESTINATIONS business model catalogueThis deliverable provides an overview about the most promising business models developed during the project. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Project Data Management Plan (V3)Updated version of the Project Data Management Plan Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Implementation report on PT enhancementThe report will detail the results of demo setup, implementation activities, ITS deployment and supporting actions for all the sites as outputs of T7.3 and T7.8 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Implementation report on shared mobility, e-infrastructures and supporting technologiesThe report will detail the results of site preparation and planned demo activities, ITS deployment and implementation of supporting actions for all the WP4 demo measures in each site as outputs of T4.3 and T4.8 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Guidelines on the mobility and urbanization needs for Chinese tourists in EuropeA short report that will help the 6 DESTINATIONS ‘ sites and other EU cities: to understand China tourists’ needs, and to design the appropriate strategies and implement the appropriate measures to attract middle to high income Chinese tourists. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Local Data Management Plan (V3)Updated version of the Local Data Management Plan Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Measure and Evaluation of technical ‘system performances indicatorsThe report will identify the main indicators for evaluating the ITS performances at site level during the demonstration of local measures respect to the specific target value. In this context the report will detail also the procedures for data collection in order to calculate the real system performances value during the operation of local measures. The report will summarise the outputs of T8.3.4 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Implementation report for measures targeted to mobility demand management and increased awareness for sustainable mobilityThe report will detail results of demo setup, implementation activities, ITS deployment and supporting actions for all the sites as outputs of T6.3. It will capture how each site has engaged key stakeholders, set up commercial agreements and marketing strategies, derive common success factors and challenges faced, allowing for transfer and adaptation of approaches ahead of measure demonstrations. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Technical workshops and training plan (V2)Updated version of the Technical workshops and training plan (D10.1) Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
Results from SUMP feasibility analysis (V3)The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2020-02-07 |
SUMP BaselineThe baseline report will illustrate the analysis of the mobility context (key players and actors in the study area) and the structure of mobility patterns at a baseline year for all 6 sites, as a result of Task 2.2 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Draft Evaluation PlanDraft plan for the evaluation of measures based on a common framework to be applied across the 6 sites, based on existing guidelines (e.g. MAESTRO & POINTER) and adapted to the DESTINATIONS focus on tourism related mobility. It will include also specific sections for the environmental, health and security assessment of the measures. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Project NewslettersStarting in M9 and every six months thereafter (M9, 15, 21, 27, 33, 39 and 45), the project will publish and distribute a Newsletter with the view to inform the widest possible public and stakeholders, as well as similar CIVITAS project participants on all project development aspects, future events and activities at local, national and European levels in the areas of sustainable transport and sustainable tourism. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Local Data Management Plan (V2)updated version of the Local Data Management Plan Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Ethics Compliance reportThe baseline approval and compliance for the rest of the project on Ethics requirements. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
User-needs and requirements, ex-ante evaluation, service design and ITS specifications for PT enhancementThe report will detail the results of the user-needs analysis, the definition of service requirements and the details of service and ITS specifications for all the sites as output of Task T7.2 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Results from SUMP feasibility analysis (V1)The feasibility report will illustrate SUMP objectives, priorities and scenarios for implementation, describing the feasibility of the measures included in the SUMP and the actions/timelines planned for their implementation for all 6 sites. The report will be the result of task 2.3 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Definition of sign off checklist for services operationThe report will detail the list of technical and functional verification tests to be carried out at site level in order to certify the technological effectiveness of ITS supporting the launch of demo measures. The report will summarise the outputs of T8.3.3 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Stakeholders\' maps and initiatives/tools for boosting the role of public and private stakeholdersA set of guidelines supporting partners in the involvement of and collaboration with local stakeholders for their specific activities at site level. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Project Data Management PlanThe report describes type of data that will be collected, processed or generated during the project and the methodology and standards that will be used to maintain and preserve this data during and after the completion of the project itself. The report will summarise the outputs of T1.6 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Project page on websiteThe project webpage, integrated within the main CIVITAS website, will present continuous updates of all facets of the project development, output, tools, news and media events Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
User-needs and requirements, ex-ante evaluation, service design and ITS specifications for measures targeted to mobility demand management and increasing awareness for sustainable mobilityThe report, outlining the outputs of task 6.2, will summarise the findings of the users’ needs and requirements analysis, the ex-ante evaluation, including appropriate specifications for ITS and the design of solutions concerning the measures targeted to mobility demand management and increased awareness. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Local Data Management Plan for each siteThe report describes for each site the data that will be collected, processed or generated during the project and the methodology and standards that will be used to maintain and preserve this data during and after the completion of the project itself. The report will summarise the outputs of T1.6 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Project Data Management Plan (V2)Updated version of the Project Data Management Plan Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Communication & Dissemination StrategyThe strategy document will elaborate the internal and external dissemination & communication plans & actions at local, regional, national and supra-national level with the objective to reaching the widest possible audience with the DESTINATIONS achievements. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Evaluation PlanFinal plan for cross-site evaluation cross-checked with the impact and process evaluation requirements asked for all CIVITAS projects by the Support Action for Evaluation and Monitoring (CIVITAS SATELLITE). Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Compilation of SULP BaselineCompilation of SULP baseline, user needs and requirements, ex-ante evaluation of logistics context analysis. Based on SULP baseline and user needs analyses, service models, operational schemes and specifications will be detailed in terms of collection/delivery procedures, involved actors, fleet management operations, access control, monitoring of parking lots and control enhancement, ICT tools. This report will include, for all the sites, the outputs from T5.2 and T5.4. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Stakeholder maps and guidelines for boosting the role of public and private stakeholders (PART2)second part of the deliverable D8.1 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Social Media accounts in Facebook & Twitter set upFacebook and twitter accounts will be established and regularly monitored and updated with the view to reinforce dissemination activities and support the platform of following cities and regions. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Guidelines for the management of bid procedures and contractingThe report will provide guidelines to Site Managers and local involved actors how to define and manage the tendering and contracting process taking into account EU and GA rules. The guidelines will outline also the evaluation criteria for selecting the most effective bid on the basis of the technical specifications and the economic value. Finally a specific contract base structure complying with the EU indications will be drafted. The report will summarise the outputs of T8.3.2 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
User-needs and requirements, ex-ante evaluation, service design and ITS specifications for shared mobility and e-infrastructuresThe report will detail the results of the users needs analysis, the definition of service requirements and the details of service and ITS specifications for all the WP4 demo measures in each site as outputs of Task T4.2 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Initial project leafletA DESTINATIONS leaflet will be published and diffused in order to present the main objectives and expected outputs of the project. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Technical workshops and training planShort report with a planning of training and technical workshops (calendar and contents) according to implementations foreseen within the work packages, the knowledge of each site and the will and need for all to learn. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Guidelines for the design of ITS solutions supporting project measuresThe report will provide the methodology and related guidelines supporting the Site Managers ITS design on the basis of the sites objectives, users requirements and service targets. The report will summarise the outputs of T8.3.1 Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |
Results of Kick-Off-Method Training in the sitesReport gathering results of Kick Off Training organised in each site. Programme: H2020-EU.3.4. - Topic(s): MG-5.5a-2015 |
Documents, reports | 2019-12-03 |