Opendata, web and dolomites

GrInHy project deliverables

The page lists 10 deliverables related to the research project "GrInHy".

 List of Deliverables

GrInHy: list of downloadable deliverables.
title and desprition type last update

Plan for dissemination activities

Based on the proposed dissemination plan in the Grant Agreement Annex I – Part B, an updated version will be published.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Summary of dissemination of project results

A summary of dissemination activities will be part of the final report.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Investigation of natural gas and industrial process gas processing

Report on results of reforming experiments and dimensioning of the reformer.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Annual data reporting 3

For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Other 2019-09-02

Final report on 7,000 h operational results

After 7.000 h operation the data collected by the SOC system and “ELEISA” will be analysed. The main topics will be system performance including power input/output and efficiencies as well as the hydrogen quality and the suitability of the predefined profiles. Also system degradation and its capability to operate at part load or over load conditions will be evaluated.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Annual data reporting 2

For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Other 2019-09-02

Report on the CO2 emission mitigation potential

Short study of CO2 emission mitigation potential in comparison to SoA hydrogen production.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Report on results of cell and stack tests

The report will contain a comparison of of performance and durability of SoA components (cells and stacks) with op-timised ones which are developed within the WP3. Long-term testing will include the measurement of voltage-current data, degradation rates, and cell/stack impedance, if available. Impedance spectroscopy allows the identification of the causes of degradation. This can orient the cell and stack developers for component improvements, in order to achieve 1 %/1000 h stack-voltage degradation. In addition, the influence of thermal management on stack degradation will be analysed by the tests results in a furnace done by EIFER and in a thermally self-sustaining environment done by SF.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Documents, reports 2019-09-02

Launch of public website

The website will be used as a basic media tool for external communication.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-09-02

Annual data reporting 1

For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database.

Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015

download deliverable 

Other 2019-09-02