The page lists 10 deliverables related to the research project "GrInHy".
title and desprition | type | last update |
---|---|---|
Plan for dissemination activitiesBased on the proposed dissemination plan in the Grant Agreement Annex I – Part B, an updated version will be published. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Summary of dissemination of project resultsA summary of dissemination activities will be part of the final report. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Investigation of natural gas and industrial process gas processingReport on results of reforming experiments and dimensioning of the reformer. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Annual data reporting 3For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Other | 2019-09-02 |
Final report on 7,000 h operational resultsAfter 7.000 h operation the data collected by the SOC system and “ELEISA†will be analysed. The main topics will be system performance including power input/output and efficiencies as well as the hydrogen quality and the suitability of the predefined profiles. Also system degradation and its capability to operate at part load or over load conditions will be evaluated. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Annual data reporting 2For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Other | 2019-09-02 |
Report on the CO2 emission mitigation potentialShort study of CO2 emission mitigation potential in comparison to SoA hydrogen production. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Report on results of cell and stack testsThe report will contain a comparison of of performance and durability of SoA components (cells and stacks) with op-timised ones which are developed within the WP3. Long-term testing will include the measurement of voltage-current data, degradation rates, and cell/stack impedance, if available. Impedance spectroscopy allows the identification of the causes of degradation. This can orient the cell and stack developers for component improvements, in order to achieve 1 %/1000 h stack-voltage degradation. In addition, the influence of thermal management on stack degradation will be analysed by the tests results in a furnace done by EIFER and in a thermally self-sustaining environment done by SF. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Documents, reports | 2019-09-02 |
Launch of public websiteThe website will be used as a basic media tool for external communication. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Websites, patent fillings, videos etc. | 2019-09-02 |
Annual data reporting 1For technology monitoring and policy analysis purposes, the data generated by the FCH2 JU projects are collected in an internal database. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.4-2015 |
Other | 2019-09-02 |