title and desprition type last update

A report into the environmental impact of the project

The environmental impact of the project will be assessed. The report will include the calculation of the energy balance of the H2 production and transport, followed by a detailed Life Cycle Assessment according to ISO 14040 and ISO 14044.

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Documents, reports 2020-02-12

Hold first workshop in Scotland to encourage local interest in the project

Hold first workshop in Scotland to encourage local interest in the project

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-02-12

Hold a press day

Hold a press day after the first year of the project with the execution stage of the project almost finished

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-02-12

A report into the societal impact of the project

Societal impact analysis will be conducted using Social Life Cycle Assessment (S-LCA) methodology and will consider the impact categories: human capital, cultural heritage and human well-being. Five main stakeholder categories are defined: workers, local community, society (national and global), consumers, and value chain actors. Of special interest are indicators as the number of jobs created and the attitudes towards hydrogen within the local population. The latter will take the form of a survey of the public and stakeholders to note improvement using a suitable tool such as SurveyMonkey. This first report will be written after year 1.

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Documents, reports 2020-02-12

Exploitation and dissemination plan

The Draft Dissemination and Exploitation Plan is presented in this Deliverable 6.1. This gives details of the how the impact of the project will be maximised through dissemination activities with key stakeholder. The dissemination will emphasise the benefits from wider replication and further deployments of renewable energy with fuel cell & hydrogen (FCH) technology in isolated or constrained territories.

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Documents, reports 2020-01-22

A report of the business models to be disseminated to OHT and follower territories

At the start of the project (Year 1) a financial analysis will be undertaken considering several scenarios. This will include consideration of capital and operational costs and the generation of cash flow projections.

An analysis in HOMER (or similar tool) of possible business models and hydrogen integration in the follower territory and other possible territories included in the Hydrogen Territories Platform will be included in the report.

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Documents, reports 2020-01-22

Hold a public awareness meetings in Kirkwall, Eday and Shapinsay to inform the public of BIG HIT plans

Hold a public awareness meetings in Kirkwall, Eday and Shapinsay to inform the public of BIG HIT plans

Programme: H2020-EU.3.3.3.2. - Topic(s): FCH-03.2-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-01-22