The page lists 15 deliverables related to the research project "X2Rail-1".
title and desprition | type | last update |
---|---|---|
Moving Block Operational and Engineering RulesThis deliverable from Task 5.2 will define the areas where Infrastructure Managers and Railway Undertakings will be required to have Operational Rules, in order to enable Moving Block operation. In particular, this is expected to cover failure scenarios, and also transitions into and out of Moving Block signalling areas. This deliverable will also define Engineering Rules required to realise a Moving Block signalling system. It is likely to cover for example the use of bi-directional signalling, and requirements regarding the boundaries of Moving Block signalling areas. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-03-06 |
Moving Block System SpecificationsThis deliverable from Tasks 5.3 will define the application and interfaces for the application of Moving Block signalling for application of Moving Block signalling across the different market segments. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-03-06 |
Moving Block Application ReportThis deliverable from Task 5.6 will define extra Operational and Engineering Rules, and extra system functions, required for the following type of railway application: Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-03-06 |
Moving Block Preliminary Safety AnalysisThis deliverable from Task 5.5 will contain the results of preliminary safety and security analysis. This is expected to contain analysis regarding the operation of a railway without trackside train detection, including in failure conditions. This deliverable is expected to contain recommendations regarding the implementation of a Moving Block signalling system in a safe and secure manner. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-03-06 |
Definition of protection profilesThis deliverable from Task 8.7 will provide the standard protection profiles for generic railway sub-systems. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-02-12 |
Specification of the communication system and Guideline for choice of TechnologyThis deliverable from Task 3.4 will define draft technical specification of the communication system including overall architecture, definition of interfaces with user applications, addressing, QoS requirements, security, specification of end-to-end protocols and interfaces between sub-systems and of the principles for operation and supervision of the communication system as well as dimensioning rules using traffic models. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-01-14 |
Reference Architecture(s)Documentation of a coherent S2R high level system architecture based on inputs and deliverables from relevant technical work packages for the signaling and automation system. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2020-01-14 |
Analysis of existing lines and economic modelsThis deliverable from Task 7.2 will contain the results of analysis of the existing lines and economics models. The analysis will include the state of the art of communication techniques as well as technical possibilities within power supply area Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
Railway requirements and Standards application conditionsThis deliverable from Task 7.3 will contain the results of analysis of the railway requirements together with the analysis of existing lines. Specifically this deliverable will include the analysis of the railway requirements with regard to safety, security and performance issues. Beside object controller and networks this task will figure out requirements on local power supply /energy harvesting. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
Current test condition and Benchmarking reportThis deliverable will highlight the current on and off site test approaches, proposing improvement actions and it will also describe best practices from other industries outside the railway sector, including a list of potential improvement ideas. This deliverable will be the output of Task 6.2. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
User RequirementsThis deliverable from Task 3.2 will define the User Requirements that the communication system shall satisfy. In particular, this is expected to cover requirements for signalling and voice as well as requirements identified by other WPs. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
ATO over ETCS GoA2 SpecificationThis deliverable from Task 4.2 will define the ATO System Requirement Specification (including Interface Specification) which is requested to guarantee the interoperability of ATO over ETCS. The output from Ten-T 3rd call and NGTC will be considered to start this delivery. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
Selection of the “security-by-design†standardThis deliverable from Task 8.6 will provide a report describing the rationale for the selection of the “security-by-design†standard and its conclusion. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
Terminology for the future Signaling and Automation SystemHarmonized glossary for the terminology used in X2Rail-1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Documents, reports | 2019-11-20 |
Project websiteSetting up and going live of a public website for the project. It will be regularly updated with news and public deliverables and it contains restricted areas for shared content with key stakeholders (e.g. ERA, standardisation organisations, representative bodies and collaborating projects external to Shift2Rail). Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2015 |
Websites, patent fillings, videos etc. | 2019-11-20 |