Opendata, web and dolomites

FIThydro project deliverables

The page lists 25 deliverables related to the research project "FIThydro".

 List of Deliverables

FIThydro: list of downloadable deliverables.
title and desprition type last update

Stakeholder event for dissemination

This event is meant to infom the stakeholder about the projects contents and progress. It will also support Subtask 5.2b to get feedback on the public acceptance.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-03-24

Project Management Plan Second Revision

Based on the WBS and Gantt chart developed in D7.1 the revision will check consistency and stage and quality of the implementation of the actions during the second period. If necessary some things will be adapted.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Public acceptance of alternative hydropower solutions

Report on the results of the social acceptance analysis aiming to identify the perceptions and preferences of the wider public vis-à-vis the construction or conversion of hydropower plants in the four case study regions.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Functional application matrix for identification of potential combinations of improvements measures

A decision matrix for assessing alternative mitigation measures for each identified bottleneck will be developed and included in the guidance handbook of D4.1

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Plan for dissemination and exploitation of the project\'s results

Based on the first results of the intermediate exploitation plan (D6.4) this deliverable will finalise the tasks to prepare the common annotated template for the exploitation plans, and complete one template for each innovative solution developed beyond TRL6 within FIThydro as described in D6.4.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Stakeholder feedback on tools and products of FIThydro

Report on the conclusions of the 4 regional workshops where stakeholders will be consulted on the planning, implementation and use of technological options for ecologically compatible hydropower production in Year 1. Another report will be produced on the conclusions of the European workshop with stakeholders to take place in Year 3.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Guidelines for mortality modelling

The concept of the Modelling Software Program BioPA will be adapted to European standards and fish species. This will be done mainly with Voith, which is highly involved in this issue.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Fish Population Hazard Index

This deliverable develops a referenced, index-based assessment scheme for fish hazards at hydropower including an application guideline

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-03-24

Working basis of solutions, models, tools and devices and identification of their application range on a regional and overall level to attain self-sustained fish populations

Report of solutions based on the analysis of the present solutions and the potential solutions.
Definition of tools and devices which could be test in the WP3 in collaboration with the providers of the different regions.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Intermediate Exploitation plan documents

This deliverable refers to (1) the preparation of a common annotated draft for a template for the exploitation plans, and (2) the draft of one template for each innovative solution developed beyond TRL6 within FIThydro. WP5 partners will prepare the common template and the product developers (i.e. FIThydro partners developing the innovative solutions) will fill it in for their individual solutions with guidance from WP5.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-23

First phase progress report

This deliverable will be an internal report on the progress of the project during the first period.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-23

A List of solutions, models, tools and devices, their application range on a regional and overall level, the identified knowledge gaps and the recommendations to fill these

Report and compilation of the test cases issued from the different regions. Identification of the missing data and gaps. Definitions of recommendations region by region.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-23

Risk classification of European lampreys and fish species

Report and compilation of construction- and operation-related impacts from hydropower on fish populations

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-23

A classification system for methods, tools and measures for improvements measures

Guidance in the format of a handbook describing methods, tools and measures from WP1-3 will be developed

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-23

Communication & Dissemination Strategy

In strong interaction with D6.4 a strategy will be developed concerning the different ways of communication. This means the communication of the projects aims and results in the best and most effective ways but also intervals to communicate.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Project Management Plan

This deliverable develops a detailed Gantt chart for the whole project as well as a Work Breakdown Structure (WBS) which includes a schedule for each task, the responsible partners related to each subtasks, related deliverables, and dependencies on other tasks. This includes also planning and organization of the different board meetings.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Set-up of a data and file sharing platform

The data and file sharing platform will be used first for the internal exchange between the partners. Later on the data will be made available to the public, following the OA strategy of EU.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Communication Strategy among the partners

A strategy is defined and implemented how to communicate in the most effective way among the partners to ensure a detailed exchange of information but avoid spreading too many information which are useless for special groups of partners. The strategy needs to be implemented for communication between Management, WP Leaders and Partners as well as between the partners directly.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Planning and organization of the different board meetings

The different meetings for GA, SC and CSMB have to be organized following the schedule given in chapter 3.2.
Each year one GA meeting is taking part in one of the regions, where the region leader will be the main organizer with strong support of the PO.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Website

This deliverable fullfills two functions, the internal and the external. It will be used as an internal platform to inform about the very actual status which can not yet be seen as a result on its own. For the external use it will be a platform to spread information about any kind of event related to the project, new publications of the project and general ongoing activities.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-07-18

Development of a Corporate identity

This task aims to the development of a corporate identity for the project to strengthen the identification of all partners with the group and the aims of the project. On the other hand it shall make the project more visible and therefore support the dissemination and exploitation activities.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-07-18

Metadata overview on fish response to hydropower

Report and compilation of life history traits of European lampreys and fishes relevant to hydropower / hydropower environments. Based on that a referenced table will be developed classifying European fishes and lampreys according to their autecological threats

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-18

Review of policy requirements & financing instruments

Report on the key legal requirements for environmental improvements to existing and new hydropower projects (based on EU and national policies for selected research test cases). The report will also review financing instruments and subsidies to fund ecologically compatible hydropower production in selected research test cases.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-18

Press release for dissemination

A press release will inform the public on the progress and actual state of research and results of the project. This aims mainly at the general public.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-18

Project Management Plan First Revision

Based on the WBS and Gantt chart developed in D7.1 the revision will check consistency and stage and quality of the implementation of the actions during the first period. If necessary some things will be adapted.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-07-18