Opendata, web and dolomites

PJ05 Remote Tower project deliverables

The page lists 3 deliverables related to the research project "PJ05 Remote Tower".

 List of Deliverables

PJ05 Remote Tower: list of downloadable deliverables.
title and desprition type last update

Solution PJ.05-02: V2 Data Pack

Development and update of V2 OSED/SPR/INTEROP for solution 02 at V2 maturity for SDM-0208. This activity will consist on the development of operational, safety, performance and interoperability requirements. Initial versions of OSED/SPR/INTEROP will be prepared as input to the validation plan (VALP) and an initial set of technical requirements (TS).

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-08-2015

download deliverable 

Documents, reports 2020-01-22

Solution PJ.05-05: TRL4 Data Pack

D5.1 Solution PJ.05-05: TRL4 Data Pack
incl.:
D5.1.002 TS PJ05-05 TRL4 final
D5.1.004 TVALP PJ05-05 TRL4 final
D5.1.006 AN EXE-05.05-TRL4-5.1-LPS final
D5.1.005 TVALR PJ05-05 TRL4 final
D5.1.007 PJ.05-05: CBA (TRL4)
D5.1.008 TVALP PJ05-05 TRL6 interim

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-08-2015

download deliverable 

Documents, reports 2020-01-22

Solution PJ.05-03: V2 Data Pack

Development and update of V2 OSED/SPR/INTEROP for solution 03 at V2 maturity for SDM-0209 and SDM-0210. This activity will consist of the development of operational, safety, performance and interoperability requirements. Initial versions of OSED/SPR/INTEROP will be prepared as input to the validation plan (VALP) and an initial set of technical requirements (TS).

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-08-2015

download deliverable 

Documents, reports 2020-01-14