Explore the words cloud of the CALITO project. It provides you a very rough idea of what is the project "CALITO" about.
The following table provides information about the project.
Coordinator |
SFS INTEC GMBH
Organization address contact info |
Coordinator Country | Germany [DE] |
Project website | https://www.projectacclaim.eu/ |
Total cost | 1˙546˙875 € |
EC max contribution | 850˙000 € (55%) |
Programme |
1. H2020-EU.3.4.5.1. (IADP Large Passenger Aircraft) |
Code Call | H2020-CS2-CFP03-2016-01 |
Funding Scheme | CS2-IA |
Starting year | 2017 |
Duration (year-month-day) | from 2017-02-01 to 2020-01-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | SFS INTEC GMBH | DE (OBERURSEL) | coordinator | 620˙000.00 |
2 | SOLVAY SPECIALTY POLYMERS BELGIUM | BE (BRUSSEL) | participant | 230˙000.00 |
It is our objective to redesign cabin and cargo lining parts and the connected mounting system to establish the basis for an automated installation e.g. by light weight parts or simplifying geometries. The interior parts and brackets will be designed to allow plain handling during installation. In respect to this, the alignment of neighboring parts will be based on a 'hidden gap'-concept. For most easy leveling of the robot, the mounting system will ensure consistent reference points throughout the bracket variants. As SFS intec GmbH has already designed the bracket logic concept for the A350 program, the hereby used clic and snap mounting system will be optimized e.g. by integrating the idea of separated load pathes to reduce bracket variants and equalize manufacturing tolerances of the structure. Multi layer panels (separation of functional and design features in different layers) and new materials with optimized CO2-Balance will be considered as well as brackets including different functions (connecting, damper, insulation…) within one or more ATA-Chapter (Mulit -ATA-Part, electric connection, mechanic connection). To minimize adaptation effort on the aircraft structure, mounting of connector brackets to the structure shall be included in the installation process of Cabin and Cargo lining. The first permanent fixation to the Aircraft structure parts takes place during installation. To disassembly the lining parts a clic and snap connection between the to parts of a bracket shall be dissolved.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "CALITO" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "CALITO" are provided by the European Opendata Portal: CORDIS opendata.