Opendata, web and dolomites

Envision project deliverables

The page lists 5 deliverables related to the research project "Envision".

 List of Deliverables

Envision: list of downloadable deliverables.
title and desprition type last update

Communication and Dissemination Plan

Communication and Dissemination Plan will be produced at the beginning of the project (M6). The deliverable will contain, the target groups, the target audiences, key messages, the communication channels, tools, the specific actions and timelines for ENVISION project. This to enable exploitation of project results. The plan will be updated on a yearly basis, and will include a report on activities performed as well as provide an overview of activities foreseen for the next period.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2020-02-13

Promo Material Description: Poster and Leaflet

Communication toolkit consisting of brochure, roll up poster, one page project description and project presentation in PowerPoint will be designed at the early stage (M6) of the project to support partners during dissemination events.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2020-02-13

Website and its Description

Setting up ENVISION website

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Other 2020-02-13

KPIs plan for the monitoring and assessment of the technologies at demo sites levels

Development of a methodology for the evaluation of the three demonstrators (UGT,VST,NSG), essential to foster transfer and replication in different European regions. A generic monitoring methodology will be developed applicable for both demonstrators to assess the performances (based on DAP expertise). The methodology will be based on measurements and monitoring protocols developed according to tailored Key Performance Indicators (KPI), clustered in four main categories: technical, economic, environmental and social indicators. To be comprehensive and effective, the methodology will include a list of generic KPIs, an analysis of the concept of each demonstrator, the identification of the baseline situation, the identification of a list of KPIs specific for the single demo as well as the definition of common conventions for calculation of specific KPIs.

This deliverable will include the demonstration in Delft - Vestia, in Genoa - UGT, and in Austria - NSG

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2020-02-13

Baseline reports of pre-renovation condition of demonstration case

Monitoring methodology and KPIs for the performance evaluation of the three demonstration sites will be specifically identified, according to local conditions, local specific pilot needs and current monitored data.

This deliverable will include the demonstration in Delft - Vestia, in Genoa - UGT, in Austria - NSG

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2020-02-13