Opendata, web and dolomites

X2RAIL-2 project deliverables

The page lists 6 deliverables related to the research project "X2RAIL-2".

 List of Deliverables

X2RAIL-2: list of downloadable deliverables.
title and desprition type last update

System Architecture Specification and System Functional Hazard Analysis of the Fail-Safe Train Positioning subsystem

Output of Task 3.2, This deliverable provides the architecture specification of the Fail-Safe Train Positioning Functional Block and the related System Functional Hazard Analysis

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Documents, reports 2019-11-22

System Requirement Specification of the Fail-Safe Train Positioning Functional Block

Output of Task 3.2, This deliverable provides the requirement specification of the Fail-Safe Train Positioning Functional Block and its integration into ERTMS

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Documents, reports 2019-11-22

Train Integrity Concept and Functional Requirements Specifications

Output of Task 4.1 and Task 4.2 - Document describing the existing Train Integrity technologies & related products. For each product or technology, the document shall contain the technical suitability analysis for train interruption detection and train completeness monitoring. It also shall describe the functional requirements for a Train Integrity Management System.

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Documents, reports 2019-11-22

Selection of standard interface(s)

Output of Task 5.3.1, deliverable with proposed approach to standard interfaces and interface(s) selection. The updated version will evaluate the interfaces defined in X2Rail-2 and, if possible, will select some of these interfaces where formal methods can be applied.

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Documents, reports 2019-11-20

Project website

Output of Task 7.1 - Setting up and going live of the X2Rail-2 contents of the public website. It will be regularly updated with news and public deliverables.

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-11-20

Formal Methods (taxonomy and survey), Proposed Methods and Applications

Output of Task 5.2.1 and Task 5.2.2, This deliverable describes the principle of the classification, provides the results of the survey, the proposed methods and their possible application.

Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-CFM-IP2-01-2017

download deliverable 

Documents, reports 2019-11-20