The page lists 25 deliverables related to the research project "SUITCEYES".
title and desprition | type | last update |
---|---|---|
Deliver the detailed dissemination planDeliver the detailed dissemination plan (M4, and continues updates) - LDQR, HARPO, HSO Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2020-02-12 |
Data Management PlanData Management Plan. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2020-02-12 |
Initial exploitation plan and report on IPR issuesInitial exploitation plan and report on IPR issues. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2020-02-12 |
Project publicity materialCreation of initial project publicity material to achieve early project awareness consisting of the posters, leaflet and factsheet, as well as the project’s social media accounts (i.e. Twitter, LinkedIn and Facebook) which will be active and constantly updated during the projects life-time. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Websites, patent fillings, videos etc. | 2019-11-14 |
Prototypes for psychophysical studies with one touch dimensions IIBased on Task 5.3 prototypes for T6.1 will be delivered having one significant touch, heat or olfactory dimension. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
Refined recommendationsRefined recommendations for gamified solutions and social interaction based on group-specific variables and preferences. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Impact Measurement MethodologyDevelop and report on an Impact Measurement Methodology Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Define the project Identity IDefine the project identity: Delivery of templates to be used by team members and an information package that will be delivered to all partners, which will be updated every 6 months including latest results and news (M3, M9, M15, M21, M27, M33) - LDQR Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Websites, patent fillings, videos etc. | 2019-11-14 |
Prototypes for psychophysical studies with two touch dimensionsBased on Task 5.4 prototypes for T6.2 will be delivered having two significant touch, heat or olfactory dimension. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
Driving and control units for the textile IIIBased on work in T6.1 electromechanical driving, actuating and control units will be done in iterations generating more mature technical solutions along while the project is proceeding. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
Personas, environments and use scenariosThis will provide a tool to guide the technical aspects of the project during its development, to provide a practical context for assessing impact on users without the need for placing constant demands on their time. It will also be made more widely available at the end of the project, to support inclusive design for deafblind people in other projects. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Dissemination activities report IDissemination activities report (M12, 24, 36) – HSO, LDQR, HARPO Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
RecommendationsA set of recommendations for gamified solutions and social interaction based on the state of the art. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Report on technologies used for existing (hard) solutions for haptic communicationBased on work in T5.1 and T6.1 the other tasks in WP5 will be informed on the Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Driving and control units for the textile IBased on work in T6.1 electromechanical driving, actuating and control units will be done in iterations generating more mature technical solutions along while the project is proceeding. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
Requirements for HIPIThis will formalise the goals and constraints for the HIPI, specifying both functions that it should perform and constraints its design should obey to be acceptable to its intended users. These requirements will be prioritised, identifying those that are critical (and must be satisfied), and those that are desirable (and should be satisfied, but not necessarily). This will serve both as a guide for technical development in WP5, and as the basis for evaluating the final device in WP6. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Documentation of agreed conceptsDocumentation of agreed concepts. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Prototypes for psychophysical studies with one touch dimension IBased on Task 5.3 prototypes for T6.1 will be delivered having one significant touch, heat or olfactory dimension. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
Driving and control units for the textile IIBased on work in T6.1 electromechanical driving, actuating and control units will be done in iterations generating more mature technical solutions along while the project is proceeding. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Demonstrators, pilots, prototypes | 2019-11-14 |
1st version of face and object recognition algorithms, dimensionality reduction algorithms, ontologies and semantic reasoningThis deliverable will report on: (a) The basic version of face and object recognition algorithms evaluated in benchmark datasets; (b) v1 of the algorithms that achieve discrete low dimensional representations for different high dimensional concepts evaluated in benchmark datasets; (c) Preliminary report on the semantic models for the mapping of communication’s conceptualisations on ontology-related constructs. In addition, it will describe the functionality of the first version of interpretation and reasoning techniques. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Define the project identity IIDefine the project identity: Delivery of templates to be used by team members and an information package that will be delivered to all partners, which will be updated every 6 months including latest results and news (M3, M9, M15, M21, M27, M33) - LDQR Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Websites, patent fillings, videos etc. | 2019-11-14 |
Report on initial psychophysical experiments IIReport on psychophysical experiments with sighted and hearing human participants on the usefulness of specific haptic signals. Evaluation of first prototypes. This will provide input to T5.1, T5.3 and T5.4. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Best practice recommendations for engaging deafblind participants in researchThis will summarise the key findings of the literature review carried out in T2.1., and a summary of the experiences of conducting the interviews in T2.2 to provide advice for future researchers on conducting research with deafblind participants. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Report on initial psychophysical experiments IReport on psychophysical experiments with sighted and hearing human participants on the usefulness of specific haptic signals. Evaluation of first prototypes. This will provide input to T5.1, T5.3 and T5.4. Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Documents, reports | 2019-11-14 |
Define the project identity IIIDefine the project identity: Delivery of templates to be used by team members and an information package that will be delivered to all partners, which will be updated every 6 months including latest results and news (M3, M9, M15, M21, M27, M33) - LDQR Programme: H2020-EU.2.1.1. - Topic(s): ICT-23-2017 |
Websites, patent fillings, videos etc. | 2019-11-14 |