The page lists 10 deliverables related to the research project "Domino".
title and desprition | type | last update |
---|---|---|
Adaptive case studies descriptionD3.3 contains the description of the adaptive case studies to be modelled in Domino. It will include the justification of the modifications carried out to the investigative case studies as a result of the analysis performed and the outcomes of the workshop with stakeholders (Task 6.3). Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2020-02-12 |
Database structureThis deliverable will detail the structure of the database, providing the information on the data sources. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Other | 2019-10-15 |
Investigative case studies resultsThe results of the investigative case studies will be compiled in this deliverable. It will include also a description of the version of the ABM model used to execute the case studies. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-10-15 |
Workshop results summaryContains the summary of the activities developed during the workshop and its results. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-08-16 |
Architecture definitionThis deliverable will include a description of the systems, subsystems and processes considered in Domino. For each of the mechanisms suggested to be modelled in the project, the deliverable will provide a set of possible operational concepts and uptake/scope to be deployed. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-05-31 |
Data management and sourcesThis deliverable presents the approach of Domino for the data management, and details the data sources considered. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-05-31 |
Investigative case studies descriptionD3.2 will present the case studies that have been created and selected to be modelled. These case studies will be the result of a consultation carried out with stakeholders (Task 6.2). Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-04-15 |
Initial model designThis deliverable will report on all the work done within Task 4.1. It will include the main assumptions made for the model and the main mechanisms to be implemented. It will include all the technical specifications of the model, including the tools used for development and an agenda for development. It will finally include relevant schemas for the implementation under the form of diagram flows or equivalent. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-04-15 |
Stakeholders consultation on system and investigative case studiesD6.2 will provide the consultation questionnaire and a summary of the consultation results. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-04-15 |
Metrics and analysis approachThis deliverable will report on the work performed in Task 5.1. It will include a developed version of the toy model and of the proposed network metrics. It will also contain first proposal for the inference of unobserved variables from simulations of the model. Programme: H2020-EU.3.4.7. - Topic(s): SESAR-ER3-06-2016 |
Documents, reports | 2019-03-22 |