The page lists 4 deliverables related to the research project "RemovAL".
title and desprition | type | last update |
---|---|---|
Data Management PlanData Management Plan (DMP) The first version of the DMP will be provided at M4 of the project. Since DMPs are expected to mature during the project, a more developed version of the plan will be included as additional deliverable at M30. This new version will include improvements based on lessons learned during the first half of the project. Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017 |
Open Research Data Pilot | 2020-03-06 |
RemovAL Project Identity, including website and logoLaunching of site and maintenance. First site version and logo delivered by M3 Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017 |
Other | 2020-03-06 |
Definition of Slag properties for stone wool productionne wool productionThe definition includes the required range (wt.-%) of main components, a negative list (not accepted by ROCKWOOL) and a specification of required physical properties (e.g. grain size). Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017 |
Documents, reports | 2020-03-06 |
Laboratory tests on alkali recovery and red mud de-alkalization for different BRThis report will include the results of the testing of different BR at lab scale (at least one publication or conference presentation is expected from this work). Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017 |
Documents, reports | 2020-03-06 |