Opendata, web and dolomites

TRINITY SIGNED

TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "TRINITY" data sheet

The following table provides information about the project.

Coordinator
ETRA INVESTIGACION Y DESARROLLO SA 

Organization address
address: CALLE TRES FORQUES 147
city: VALENCIA
postcode: 46014
website: www.grupoetra.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Total cost 13˙151˙140 €
 EC max contribution 9˙854˙253 € (75%)
 Programme 1. H2020-EU.3.3.4. (A single, smart European electricity grid)
 Code Call H2020-LC-SC3-2019-ES-SCC
 Funding Scheme IA
 Starting year 2019
 Duration (year-month-day) from 2019-10-01   to  2023-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    ETRA INVESTIGACION Y DESARROLLO SA ES (VALENCIA) coordinator 1˙392˙293.00
2    RTE INTERNATIONAL FR (COURBEVOIE) participant 1˙342˙366.00
3    SEEPEX JOINT STOCK COMPANY BELGRADE RS (BELGRADE) participant 1˙197˙940.00
4    ELEKTROENERGETSKI KOORDINACIONI CENTAR DOO RS (BEOGRAD) participant 972˙735.00
5    INSTITUT MIHAJLO PUPIN RS (BEOGRAD) participant 840˙845.00
6    CENTAR ZA KOORDINACIJU SIGURNOSTI SCC DOO BEOGRAD-VOZDOVAC RS (BEOGRAD) participant 597˙205.00
7    CENTRUL ROMAN AL ENERGIEI - CRE RO (BUCURESTI) participant 508˙836.00
8    INSTITUTE OF COMMUNICATION AND COMPUTER SYSTEMS EL (ATHINA) participant 388˙750.00
9    ELEKTROENERGIEN SISTEMEN OPERATOR EAD BG (SOFIA) participant 376˙826.00
10    NEZAVISNI OPERATOR SISTEMA U BOSNII HERZEGOVINI BA (SARAJEVO) participant 320˙850.00
11    HUPX MAGYAR SZERVEZETT VILLAMOSENERGIA-PIAC ZARTKORUEN MUKODO RESZVENYTARSASAG HU (BUDAPEST) participant 284˙856.00
12    BULGARSKA NEZAVISIMA ENERGIJNA BORSA EAD BG (SOFIA) participant 282˙004.00
13    CRNOGORSKI ELEKTROPRENOSNI SISTEM AD PODGORICA ME (PODGORICA) participant 276˙368.00
14    JOINT STOCK COMPANY ELEKTROMREZA SRBIJE BELGRADE RS (BEOGRAD) participant 262˙449.00
15    TERNA ENERGY AE EL (ATHINA) participant 240˙625.00
16    KONCAR - INZENJERING ZA ENERGETIKUI TRANSPORT DD HR (ZAGREB) participant 199˙302.00
17    BERZA ELEKTRICNE ENERGIJE DOO PODGORICA ME (PODGORICA) participant 182˙955.00
18    UNIVERSITY ST KLIMENT OHRIDSKI BITOLA MK (BITOLA) participant 102˙236.00
19    OPERATOR NA ELEKTROPRENOSNIOT SISTEM NA MAKEDONIJA AKCIONERSKO DRUSHTVO ZA PRENOS NA ELEKTRICHNA ENERGIJAI UPRAVUVANJE SO ELEKTROENERGETSKI MK (SKOPJE) participant 84˙805.00

Map

 Project objective

Nowadays, the adoption of a single and unified electricity market [1] is one of the main challenges faced by Europe. Although the Western and Northern regions of Europe have been working for several years towards reaching such objective, the South-Eastern region of Europe has not followed the same roadmap and it not as advanced in this field as Western Europe.

TRINITY will address this challenge in order to improve the current situation and facilitate the interconnection of South-Eastern electricity markets - among them and also within the current Multi Regional Coupling area (MRC).

TRINITY will develop a set of solutions to enhance cooperation among the transmission system operators of SEE in order to support the integration of the electricity markets in the region, whilst promoting higher penetration of clean energies.

This strategic goal will be driven by end-users (8 TSOs, 4 NEMOS and 1 RCC) and will be achieved through the deployment in the region of four independent, but complementary, products: T-Market Coupling Framework; T-Sentinel Toolset; T-RES Control Center and T-Coordination Platform.

 Deliverables

List of deliverables.
Project Management Plan (v1) Documents, reports 2020-02-12 17:16:26
Plan for Exploitation and dissemination of results (PEDR) (v1) Documents, reports 2020-02-12 17:16:39

Take a look to the deliverables list in detail:  detailed list of TRINITY deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TRINITY" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "TRINITY" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.4.)

TRINITY (2019)

TRansmission system enhancement of regIoNal borders by means of IntellIgenT market technologY

Read More  

Smart4RES (2019)

Next Generation Modelling and Forecasting of Variable Renewable Generation for Large-scale Integration in Energy Systems and Markets

Read More  

CompBat (2020)

Computer aided desing for next generation flow batteries

Read More