The page lists 9 deliverables related to the research project "XCYCLE".
title and desprition | type | last update |
---|---|---|
Cycle Safety Evaluation PlanThis deliverable describes themethods and procedures to be applied the Willingness-to-pay study (T6.2), the on-site studies (T6.3) and the cost-benefit analysis (T6.4). It will also include an outline of the variables that are to be collected, the performance indicators to be derived from them and the envisioned analyses. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Final plan for dissemination and exploitationFinal plan for dissemination containing results of actions carried out during project and prospective results for the remaining period of project. Exploitation of results in terms of ITS applications and HMI design for safer traffic management, with respect to major targets and stakeholders. Business plan for penetration of the market. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Report on user behaviour control algorithmsReport on user behaviour control algorithms. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Evaluation of modules at an overall levelThe evaluation process is completed successfully and documented as a report, holding all relevant information of the single test procedures. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Communication materialsCommunication and promotion materials will be available. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Present state of affairsPresent state of affairs: common accidents and prototype warning systems and systems on the market Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Initial plan for dissemination and exploitationInitial plan for dissemination and exploitation of knowledge and foreground, focused on means and material for dissemination and exploitation, on target groups and on success criteria. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |
Project websiteProject website will be online. Layout of newsletters and script of project videos will be prepared. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Websites, patent fillings, videos etc. | 2019-11-08 |
Cycle Safety Evaluation ResultsThis deliverable includes the results from the Willingness-to-pay study (T6.2), the on-site studies (T6.3) and the cost-benefit analysis (T6.4). It also includes a section that links the results of the three tasks with each other. The methods used and the results obtained will be discussed critically and related to other existing research. Programme: H2020-EU.3.4. - Topic(s): MG-3.4-2014 |
Documents, reports | 2019-11-08 |