The page lists 20 deliverables related to the research project "NIPSE".
title and desprition | type | last update |
---|---|---|
Position PaperThis public document will explain from the participants point of view the impacts in terms of aircraft and engine performance, reliability and ease of maintenance, weight saving, etc. and their translation in economic performances – cost saving and competitiveness advantages. Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Exploitation and development plansThis report will describe the plans of the participants to move the technology forward including next steps, key milestones and the corresponding investments vs. business perspectives Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Knowledge portfolioList of relevant background and foreground from NIPSE. Updated and maintained all along the project life Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Final workshop reportTechnical workshop to present the main project results to the aeronautics industry, supply chain, stakeholders and academia Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Validation analysis and conclusions report for the DEVELOPMENT OF HORLinked to task 4.2 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Detailed technical notes of selected solutions in M21Linked to task 4.3 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Optimisation method development and applicationDescription of the developed optimisation methodology, and of the subsequent optimisation runs that are performed. Specifications and motivations of algorithms considered, approach followed, objectives and constraints taken into account, and of the different evolutions of the considered equipment. Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Solutions applicability, maturity and benefits matrix in the frame of IPPS. Selection of most relevant solutions.Linked to task 4.3 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Test Results for Cooling Technology DemonstratorLinked to task 2.5 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Cooling Technology Selection for NIPSE DemonstratorLinked to task 2.2 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Ceramic development and resultsLinked to task 4.5 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Progress Report – First period reportingThis report will strictly follow the EC requirements for periodic reporting process. It will include activity (at WP and partner level) financial reporting as well as WP and project risk’s monitoring of the period M1-M18 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
RequirementsDefinition of IPPS detailed specification and high level aircraft specification, together with a guideline for the evaluation criteria. Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Innovative cooling technologies and options for NIPSELinked to task 2.1 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
NIPSE public web sitePublic website describing the project and presenting results (regularly updated throughout the project life) Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Dissemination planDissemination plan including the global dissemination strategy, first actions and a project indicator to measure the dissemination actions being performed (to be then updated every 6 months) Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Conceptual design of Optimized HOR systemLinked to task 4.2 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Cooling Technology Demonstrator requirementsLinked to task 2.3 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Project Management Plan, Handbook on Management ProceduresThis deliverable will encompass the methods, means and tools for the NIPSE consortium management It will complements other related documents (EC Grant Agreement and its annexes, the Consortium Agreement and the various EC guidelines), which, in case of conflict or uncertainty will prevail. Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |
Assessment of emerging technologies for use in harsh environment applicationsLinked to task 4.1 Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014 |
Documents, reports | 2019-07-22 |