NIPSE project deliverables

The page lists 20 deliverables related to the research project "NIPSE".

 List of Deliverables

NIPSE: list of downloadable deliverables.
title and desprition type last update

Position Paper

This public document will explain from the participants point of view the impacts in terms of aircraft and engine performance, reliability and ease of maintenance, weight saving, etc. and their translation in economic performances – cost saving and competitiveness advantages.

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Exploitation and development plans

This report will describe the plans of the participants to move the technology forward including next steps, key milestones and the corresponding investments vs. business perspectives

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Knowledge portfolio

List of relevant background and foreground from NIPSE. Updated and maintained all along the project life

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Final workshop report

Technical workshop to present the main project results to the aeronautics industry, supply chain, stakeholders and academia

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Validation analysis and conclusions report for the DEVELOPMENT OF HOR

Linked to task 4.2

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Detailed technical notes of selected solutions in M21

Linked to task 4.3

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Optimisation method development and application

Description of the developed optimisation methodology, and of the subsequent optimisation runs that are performed. Specifications and motivations of algorithms considered, approach followed, objectives and constraints taken into account, and of the different evolutions of the considered equipment.

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Solutions applicability, maturity and benefits matrix in the frame of IPPS. Selection of most relevant solutions.

Linked to task 4.3

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Test Results for Cooling Technology Demonstrator

Linked to task 2.5

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Cooling Technology Selection for NIPSE Demonstrator

Linked to task 2.2

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Ceramic development and results

Linked to task 4.5

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Progress Report – First period reporting

This report will strictly follow the EC requirements for periodic reporting process. It will include activity (at WP and partner level) financial reporting as well as WP and project risk’s monitoring of the period M1-M18

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Requirements

Definition of IPPS detailed specification and high level aircraft specification, together with a guideline for the evaluation criteria.

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Innovative cooling technologies and options for NIPSE

Linked to task 2.1

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

NIPSE public web site

Public website describing the project and presenting results (regularly updated throughout the project life)

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Dissemination plan

Dissemination plan including the global dissemination strategy, first actions and a project indicator to measure the dissemination actions being performed (to be then updated every 6 months)

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Conceptual design of Optimized HOR system

Linked to task 4.2

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Cooling Technology Demonstrator requirements

Linked to task 2.3

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Project Management Plan, Handbook on Management Procedures

This deliverable will encompass the methods, means and tools for the NIPSE consortium management It will complements other related documents (EC Grant Agreement and its annexes, the Consortium Agreement and the various EC guidelines), which, in case of conflict or uncertainty will prevail.

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22

Assessment of emerging technologies for use in harsh environment applications

Linked to task 4.1

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2014

download deliverable 

Documents, reports 2019-07-22