The page lists 53 deliverables related to the research project "NeTIRail-INFRA".
title and desprition | type | last update |
---|---|---|
Balancing societal effects and cost-benefit of different infrastructure decisions.Report on the output of Task 5.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Cost effective transition zone design tailored to line type and trafficReport on output of Task 2.6.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Cost-benefit and societal analysis report illustrated by case study line dataReport on the output of Task 6.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Application of lean and automotive industry techniques to produce a step change in railway S&C life and costsReporting output of Task 2.3.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
GIS-based web applicationAchievement, problems, mitigation action, and any deviations in creation of the GIS-based web application in Task 6.2. Sample of application to be appended. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Tailored decision support for track and vehicle maintenance through conversion of data to information.Report on output of Task 4.5 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Data on system damage for different combinations of wire tension, pantograph collector strip material and upload force.Report on the output of Task 3.5 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Tailoring track to avoid corrugations: Traffic dependant selection of rail cross-section, clips and pads to avoid or delay corrugationReporting output of Task 2.4.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Decision support tools for implementation of technologiesAchievement, problems, mitigation action, and any deviations in creation of the decision support tools in Task 6.3. Sample of tool to be appended. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Final business case synthesis final reportReporting output of Task 1.6 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Interface definition for input of GNSS (or ground-based train odometry) location data to monitoring technology.Report on output of Task 4.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Status report on current design & maintenance criteria relative to needs, static illustration for case study linesReport on the output of Task 6.5 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
NeTIRail-INFRA Final brochureProject communications and publicity Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2019-03-06 |
Track and ride quality monitoring technology based on train-borne measurements in standard vehicles.Report on output of Task 4.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Tailoring lubrication to duty and climate: Safe, effective and eco-friendly avoidance of track wear and damageReporting output of Task 2.5.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Case study line data scenarios playable in the web applicationReport on output of Task 6.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Overview of technical developments and innovation with direct or possible future expected impact on existing guidelines.Reporting output of Task 7.5 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Incentives final reportReporting output of Task 1.5 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Cost and User benefit reportReporting output of Task 1.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Overview of project related recommended future development needs.Reporting output of Task 7.6 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Data report on network-related technical and operational dataReport on the output of Task 6.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Validated monitoring equipment produced by testing of instrumentation in the real environment.Report on output of Task 4.6 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Harmonised interface to transmit on-board monitoring data to the traffic control centre.Report on output of Task 4.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Development status of smartphone technology for track and ride quality monitoring.Report on progress in Task 4.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Analysis of “big dataâ€: geospatial analysis of costs, drivers of failure and life of track infrastructure.Reporting output of Task 2.1. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Wider economic benefits final report.Reporting output of Task 1.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Perception of different service options: User study and data analysisReport on the output of Task 5.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Project Quality PlanGenerated in work package 8 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Database of economic data on case study lines, with accompanying meta-data description to document structureAchievement, problems, mitigation action, and any deviations in creation of the database of economic data. Sample data to be appended. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Project Website (public and private)Achievement, problems, mitigation action, and any deviations in creation of the project website. Sample of website to be appended. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Functional, operational and technical specification for simplified interlocking of user autonomous switches in low density lines.Report on achievement, problems, mitigation action, and any deviations from expectations in demonstration of equipment designed in Task 4.4. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Preliminary transition zone model and detailed modelling planReporting output of Task 2.6.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Lubrication systems and data available, with estimates of costs and benefitsReporting output of Task 2.5.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Societal and legal effects of transport decision: Stakeholder analysis.Report on the output of Task 5.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Confidentiality policy and agreementsSupporting agreements to enable Task 6.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Power supply technologies and practices of low and high-density railways, identifying learning points and future opportunities.Report on output of Task 3.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Corrugation reduction strategies for NeTIRail-INFRA track types, with estimates of costs and benefitsReporting output of Task 2.4.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Wider economic benefits intermediate reportReporting output of Task 1.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Model to support increasing the resilience of power supply infrastructure to changing climate.Report on the output of Task 3.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Cost model development reportReporting output of Task 1.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Development of technology for track and ride quality monitoringReport on progress in Task 4.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Low cost track based monitoring modules for plain line and S&C.Report on the output of Task 4.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Modular packages of component grades and design specifications for new installations of power infrastructure tailored to traffic and operational needs.Report on the output of Task 3.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Project FlyerProject communications and publicity Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2019-03-06 |
Project Management Plan.Generated in work package 8 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-05-30 |
Low cost smartphone based track and ride quality monitoring technology.Report on output of Task 4.3 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Analysis of “big dataâ€: tailoring overhead line infrastructure specification and needs through geospatial analysis of duty and life of equipment.Report on the output of Task 3.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Practices and track technology tailored to particular lines.Reporting the output of Task 2.2 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Tailored combinations of wire tension, pantograph collector strip material and upload force for optimum performance.Report on the output of Task 3.4 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Report on selection of case studiesReport on selection of case studies, generated by T1.1. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
Cost/benefit data and application methodology for lean in railway S&CReporting output of Task 2.3.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |
NeTIRail-INFRA Newsletters (3 issues)Project communications and publicity. Three issues: Month 12, 24, 36. Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Data collection equipment in the laboratory environment, and plan for field trialsReport on the output of Task 4.1 Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014 |
Documents, reports | 2019-03-06 |