The page lists 52 deliverables related to the research project "EBSF_2".
title and desprition | type | last update |
---|---|---|
Code of practice for efficient driver behaviour supportDescription of ‘best approach’ (algorithm vs. best driver) to defining target values for energy efficient driver behaviour adapted to a PT context. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Training material on driver assistance innovative applicationsOnline training module and corresponding training material for IT-driving assistance. The development of the training material will be based on deliverables D17.2 and D17.3. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Guidelines for including energy efficiency in procurement material processCombination of performance and financial analysis results to help procurement on how to address energy efficiency when tendering new vehicles or services, as well as how to assess and improve energy efficiency of the existing fleet (or operations). Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Dissemination and Networking activities ReportThis document will report on the dissemination activities performed by the EBSF_2 project during the entire project including the thematic workshops organised jointly to local demo events. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Barcelona: Demonstration ResultsCollected data, evaluation results and conclusions Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Paris Area: Demonstration ResultsThis deliverable will include local evaluation of demo results (interfaces implementation, AVMS installation and IP messages). Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Design Charter for innovative electric busesFinal Charter ready for distribution to manufacturers and other relevant stakeholders. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
MADT concept implementation rules & standard framework definitionThis deliverable is focused on MADT functional specification improvement. It includes standard rules and tools to support easy deployment of such integrated IT HMI. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Innovative Bus Systems VisionThis document, issued as leaflet / short brochure, show how the key domain experts that are members of the EBSF_2 Steering Board see the role of an innovative Bus Systems in the modern urban scenario Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Ravenna: Demonstration ResultsDemo results report and evaluation. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Madrid: Demonstration ResultsFinal report assessing the expected results and identifying the conditions in which they can be achieved. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Innovative Bus Systems Roadmap for researchFinal public issue which take into account the feedbacks received by the different consulted bodies. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
IT standard follow-up and roadmapThis deliverable describes the status of IT standardisation activities. It includes requirements for further standards evolution. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
EBSF_2 Study Tour Methodology and ReportEBSF_2 Study Tour Methodology and Report Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Final recommendation on targeted TransferabilityReport on results of the transferability exercise and recommendations in order to overcome possible barriers to the implementation process enabling the effective transfer of EBSF_2 solutions. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Innovative Bus Systems Exploitation PlanThis document includes the description of how the innovations tested and validated in EBSF_2 will be transformed into real final products, concepts and practices, and to what extent they contribute to the key strategies relevant for the bus sector. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Helsinki/Espoo: Demonstration ResultsA report describing and quantifying the results and the proof-of-concept for the demonstrated solution. A manifestation of the success rate of the technology/solution demonstrated. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Guideline for the use of adaptable busesDescription of the bus depot infrastructure as well as essential design features and operations that will influence the handling of the coupling/uncoupling processes. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Dresden: Demonstration ResultsIt will describe the data collection and will list local evaluation results. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Report on the Economic and financial analysis of the innovationsEconomic and financial analysis of the innovations tested individually and when introduced in the whole network, taking into account the LCC of the innovation and supported along CBA and CEA Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Bus-FMS requirements & evolution for IT networkThis deliverable is focused on Bus-FMS interface requirements. It includes requirements coming from EBSF_2 demos results to improve data description and functional specification of such interface with link to IT network Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Technical evaluation report of the innovationsAnalysis of the impacts of the different TIs implemented in the demo sites in terms of improvement of attractiveness for users, enhancement of the operation, and energy savings. The identification of influential factors and synergies will feed the recommendations to be settled within WP5. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Gothenburg: Demonstration ResultsResults from demonstration (field trial and simulations), evaluation of KPIs Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Final Event PackageThe Final Event is planned to be performed at the very end of the project. This report will include a description of the event and all the event media coverage. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Other | 2020-02-07 |
EBSF_2 User Group Methodology and ReportThis document aims at defining and describing the set of practices, rules, procedures and working methods for the set-up, organisation and activities of the EBSF_2 User Group. It will also report on the creation and on the activities of the EBSF_2 User Group composed of public transport operators and public transport authorities Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Code of practices for new design options of the exterior and interior design and layout of buses and its interface with the platformThis deliverable include the lesson learned by applying the e BPST to the specific purposes of the project Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
London: Demonstration ResultsThis deliverable will include local evaluation of demo results (pre-preparation, IP messages). This final report will also include TfL’s assessment of the extent to which TfL could base its procurement of next generation of AVL systems on CEN standards and on what work remains to be done. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
New design and decision-making methodologies for public transport infrastructureThis document gather the guidelines for the adoption of the new defined process for proposing and discussing new design for urban public transport infrastructure with relevant and potential stakeholders Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Paris City: Demonstration ResultsFinal demonstration report (technical and economic analysis). Analysis of the enhanced bus terminal concept adequacy. Analysis of the design management process and the simulation tool efficiency Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
San Sebastian: Demonstration ResultsCollected data, evaluation results and conclusions. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Lyon: Demonstration ResultsCollected data, Local evaluation report, ITxPT compliance specification. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Stuttgart: Demonstration Results\"This document contains the results of demo (phase #1 and phase #2) including the KPI assessed and the evaluation methods.\" Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
IT modules & architecture certification Description and Implementation PlanIT modules & architecture certification Description and Implementation Plan Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Draft innovative bus systems roadmapDraft innovative bus systems roadmap Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
IP IT architecture monitoring specificationsThis deliverables is focused on IT architecture monitoring. It includes standard rules to supervise IT network and to diagnostic connected IT modules. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Guidelines for ergonomic design of driver assistance systems interface (HMI)Summary of guidelines for design of user interfaces for driver assistance systems taking into account information content and interaction modality. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Lyon: Demo Description and Implementation PlanPlanning of activities, functional specifications, lines description Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Paris City: Demo Description and Implementation PlanThe deliverable will contain a detailed implementation plan including: System functional and technical specifications] as well as economic analysis for intelligent garage, energy consumption IT services description, benchmarking report about good bus terminals, including the management and organization aspects, functional specifications of an ideal bus terminal. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Barcelona: Demo Description and Implementation PlanDetailed description of the demo and implementation Plan including KPIs and strategies to characterize the standard vehicles before implementing the innovative solutions. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
London: Demo Description and Implementation PlanThis deliverable will include the work-plan and responsibilities of each partner; design specification (majoring on interfaces and data) and evaluation criteria. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Kick off PackageThe Kick-off meeting is planned to be performed at the very beginning of the project. This report will include a description of the event and all the event media coverage. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Other | 2020-02-07 |
Report on updated definition for “innovative bus systemThe deliverable will summarise the updated requirements for the systems vehicle, infrastructure and operation according to the needs of the stakeholders Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Helsinki/Espoo: Demo Description and Implementation PlanDetailed description of the demonstrated technology/solution and how it will be implemented in the demonstration Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
EBSF_2 Dissemination and Networking StrategyThis document will describe the strategy for the dissemination of the EBSF_2 activities and results. It will identify the key interests of the different stakeholders’ categories, define audience categories and associate them with the most suitable dissemination tools to be used to produce the highest awareness of the project Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Madrid: Demo Description and Implementation PlanDetailed description of the demonstration, implementation plan, objectives and evaluation methodology Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Gothenburg: Demo Description and Implementation PlanDescription of plans for implementation, plans for demonstration (field trial and simulations), relevant KPIs including definitions and data to be collected. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Stuttgart: Demo Description and Implementation PlanDescription of the demonstration as well as the KPIs selected in the correspondent task. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Paris Area: Demo Description and Implementation PlanThis deliverable will include the work-plan and responsibilities of each partner; design specification (majoring on interfaces and data) and evaluation criteria. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
San Sebastian: Demo Description and Implementation PlanDetailed description of the demo and implementation Plan including KPIs and strategies to characterize the standard vehicles before implementing the innovative solutions. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Design brief for innovative electric busesThe deliverable includes the synthesis of the previous functional and design studies about new buses, and characterise the areas to be included in the design charter in terms of stakes, needs, constraints and objectives. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Dresden: Demo Description and Implementation PlanIt will describe the TI to be tested and how they will be implemented, and the list of KPI for local evaluation Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |
Ravenna: Demo Description and Implementation PlanA detailed implementation plan including technical specification, functional and non-functional requirements, planning of activities. Programme: H2020-EU.3.4. - Topic(s): MG-3.2-2014 |
Documents, reports | 2020-02-07 |