The page lists 27 deliverables related to the research project "SWITCH".
title and desprition | type | last update |
---|---|---|
Technical report for software testing, validation and release of the SWITCH environmentTechnical report for software testing, validation and release of the SWITCH environment (M36): summary of results of the pilot use cases and guide-lines for the continued use of SWITCH and its application to new use cases. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Learning strategies for self-adaptive control mechanism for time critical Cloud applicationsLearning strategies for self-adaptive control mechanism for time critical Cloud applications (M24): Detailed description of how the learning strategies for self-adaptation will work. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Technical documentation of the elastic early warning system using SWITCHTechnical documentation of the elastic early warning system using SWITCH (M36) Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Software test, validation and release plansSoftware test, validation and release plans (M12): documentation describing the procedures which will be followed for software test, validation and release of the core SWITCH software and of the pilot use cases. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Technical requirements and the state of the art review for time critical and self-adaptive applications in CloudTechnical requirements and the state of the art review for time critical and self-adaptive applications in Cloud (M6): this will include a survey of the requirements of time-critical self-adaptive Cloud applications, informed in part by the pilot use cases, and will assess the applicability of the current state-of-the-art in relevant disciplines. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Semantic linking model for the SWITCH environment V1Semantic linking model for the SWITCH environment V1 (M9): a draft proposal, based on analysis of requirements and the anticipated architecture of the SWITCH environment. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-03-11 |
Design specification of the ASAP subsystemDesign specification of the ASAP subsystem (M18): a detailed specification of the ASAP system to be built, including how it will interpret plans generated by DRIP in order to deploy and adapt applications and infrastructure. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical and functional specifications for the Cloud virtual studio for directing and broadcasting live eventsTechnical and functional specifications (M24) -for the Cloud virtual studio for directing and broadcasting live events Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
SWITCH data management planSWITCH data management plan (M6): an initial version of the data management plan, identifying the areas which need to be covered by the plan and proposing how they should be managed. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Concept description for application-infrastructure co-programmingConcept description for application-infrastructure co-programming (M18): a proposal for modelling the key concepts needed within SWITCH and a language which can express constraints and requirements against this vocabulary. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Design specification for the infrastructure planning serviceDesign specification for the infrastructure planning service (M18): a detailed specification of the DRIP system to be built. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical and functional specifications for the collaborative real-time business communication platformTechnical and functional specifications (M24) -for the collaborative real-time business communication platform Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Report on dissemination, communication, collaboration, exploitation and standardization V3Report on dissemination, communication, collaboration, exploitation and standardizationV3 (M36) Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Report on dissemination, communication, collaboration, exploitation and standardization V1Report on dissemination, communication, collaboration, exploitation and standardization V1 (M12): A series of reports will be produced as the project proceeds, each reporting on activities up to the point at which the report is delivered and reporting future plans. Draft plans for post-project sustainability will be included in the M12 and M24 reports, with final plans in the M36 report. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical documentation of the Cloud virtual studio for directing and broadcasting live events using SWITCHTechnical documentation of the Cloud virtual studio for directing and broadcasting live events using SWITCH (M36) Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Plans for support actionsPlans for support actions (M 6): A report that describes the plans for dissemination, collaboration and communications within the SWITCH project. It will also include a market analysis, a list of SWITCH assets and their expected positioning in the market. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Prototype runtime monitoring systemPrototype runtime monitoring system (M12): design documentation and experimental prototype for collecting runtime performance and Quality of Service data. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Quality Assurance PlanQuality Assurance Plan (M3): To manage and support the project Quality Control, a documented Quality Assurance Plan will be set up and maintained to monitor all deliverables before finalising them. The deliverable also contains a detailed risk analysis and contingency planning. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical description of the DRIP subsystemTechnical description of the DRIP subsystem (M30): documentation of the final design of DRIP, its API, and algorithms used for planning and manipulating the semantic knowledge underpinning SWITCH. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Architecture design of the SWITCH environmentArchitecture design of the SWITCH environment (M12): an architecture for the entire SWITCH environment (SIDE, DRIP, ASAP and characteristics of the infrastructure on which these components will be deployed). Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Semantic linking model for the SWITCH environment V2Semantic linking model for the SWITCH environment V2 (M24): complementing the integrated SWITCH prototype, this will present a revised version of D3-1, incorporating the results of reflection on the practical experience of implementing SWITCH. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Report on dissemination, communication, collaboration, exploitation and standardization V2Report on dissemination, communication, collaboration, exploitation and standardizationV2 (M24) Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical documentation of the collaborative real-time business communication platform using SWITCHTechnical documentation of the collaborative real-time business communication platform using SWITCH (M36) Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Project HandbookProject Handbook (M3): To ensure a consistent implementation of the management of the project, UvA will produce a project procedure handbook that will be easily accessible to all the partners. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical description of the SIDE subsystemTechnical description of the SIDE subsystem (M30): documentation of the final architecture of the SIDE subsystem and its individual components. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical documentation of the ASAP subsystemTechnical documentation of the ASAP subsystem (M30): documentation of the final design of ASAP, its API, algorithms used for monitoring, learning and adapting applications and infrastructure to maintain required Quality of Service within SWITCH. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |
Technical and functional specifications for the elastic early warning systemTechnical and functional specifications (M24) -for the elastic early warning system Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-02-26 |