The page lists 14 deliverables related to the research project "PROTEUS".
title and desprition | type | last update |
---|---|---|
Mid project report on dissemination and exploitationThis report will present a break-down of the dissemination and exploitation activities carried out during the first half of the project, and any updates to the data management plan. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Field Test final reportReport with a complete description of the field test program and detailed compilation of obtained experimental data. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Use case descriptionDescription of use cases scenarios/high level requirements and of the validation plan Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Final version of smart system co-designThis report will include the final design specifications of the whole system as outcome of all WP2 tasks for the second design phase Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Report on 1st phase validation, including energy, sensing, reliability, model deploymentThis report includes the first validation results based on lab and model deployment Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
End project report on dissemination and exploitationThis report will present a break-down of the dissemination and exploitation activities carried out during the second half of the project, and any updates to the data management plan. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Project websitePublic website operational. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Other | 2019-04-15 |
Report on 2nd phase validation, including energy, sensing, reliability, model deploymentThis report includes the second validation results based on lab and model deployment Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Requirements analysisList of requirements coming from tasks 1.2-1.3, applying to the PROTEUS smart-system Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Requirements and Exploitation StrategyTogether with the overall requirements, this deliverable will contain the initial exploitation strategy with a particular focus on European and worldwide consultation meetings. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Data management planThis report will present in detail which data is available to the public, as part of the open data pilot. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Open Research Data Pilot | 2019-04-15 |
Manufacturability planFirst version of manufacturability analysis (plan)for PROTEUS smart-system Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
First version of smart system co-designThis report will include the design specifications of the whole system as outcome of all WP2 tasks for the first design phase Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |
Technology Transfer DirectoryThis report will detail the technology transfer plan. Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014 |
Documents, reports | 2019-04-15 |