The page lists 8 deliverables related to the research project "SEERS".
title and desprition | type | last update |
---|---|---|
Demonstration of the SEERS system for tunnel controlPublic report that shows the performance of SEERS system applied to tunnel control. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Documents, reports | 2019-05-30 |
SEERS prototypePrototype TRL 7. Public system prototype demonstrated in operational environments. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
SEERS dataset for benchmarkingPublic dataset with data, measurements and routings for benchmarking purposes. Dataset does not include any personal data recorded. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Other | 2019-05-30 |
Communication material and record reportsIncluding: Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Demonstration of the SEERS system for coastal surveillancePublic report that shows the performance of SEERS system applied to coastal surveillance. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Documents, reports | 2019-05-30 |
Reference datasetsCollection of videos and reference metadata for algorithm training and testing, both from the tunnel and coastal scenarios. Video collection datasets used for public dissemination do not include any personal data recorded. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Open Research Data Pilot | 2019-05-30 |
Open spectral datasetsPublication of datasets related with gas levels, temperature, oil spills, etc. obtained with the spectral laboratory prototype during the task 1.3. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Other | 2019-05-30 |
Project WebsiteThe project website will be a public domain to disseminate the public results of the project, nevertheless a private area will be set up for facillitating internal collaboration among the partners . The Website will be placed on a .EU domain and the contents will be updated every 3 months. Programme: H2020-EU.2.1.1.6. - Topic(s): ICT-26-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |