Opendata, web and dolomites

BESIIICGEM project deliverables

The page lists 10 deliverables related to the research project "BESIIICGEM".

 List of Deliverables

BESIIICGEM: list of downloadable deliverables.
title and desprition type last update

Cloud bursting tools

custom cloud bursting tools optimised for BESIII

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06

CGEM-IT

fully operational and commissioned BESIII CGEM-IT

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06

Public Wiki Page

a Wiki page, public, maximising the outreach of the project; the public Wiki page has to be established within month 12 and constantly updated. The Wiki page should keep track of new appointments of the personnel (students of temporary researchers) that left the Member Institutions to join other Academic Institutions or Industries, stressing the contribution to their careers coming from the activities performed and the skills acquired within the framework of the project

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Construction tools

tooling needed for construction of CGEM-IT

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-05-30

Assembled CGEM-IT no FEE

assembled CGEM-IT with no FEE

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06

Anode design

final design of the anode for the last two layers of the CGEM-IT

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-05-30

Installation tools

tooling needed for the installation of CGEM-IT

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06

Virtualised Tier 2

virtualised Tier-2 Grid infrastructure hosted by the Torino CI, fully interfaced with IHEP Computing Center and other BESIII distributed computing sites

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-05-30

Second and Third layers

second and third layers of the CGEM-IT

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06

Assembled CGEM-IT

CGEM-IT ready for installation

Programme: H2020-EU.1.3.3. - Topic(s): MSCA-RISE-2014

download deliverable 

Other 2019-06-06