UPGRID project deliverables

The page lists 20 deliverables related to the research project "UPGRID".

 List of Deliverables

UPGRID: list of downloadable deliverables.
title and desprition type last update

Report of Societal Research, Socio-economic impact of Smart Grid, Report of transfer replication strategy and communication

This report will present the summary and main conclusions related to the evaluation of the socio-economic impact observed in every demonstration on the social stakeholders under research. The report will cover the demonstrations both ex-ante and ex-post phases for the different impact issues considered in T9.3.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report about system wide benefits of UPGRID services

This report will firstly describe the approaches and models specifically developed in Task 8.6 to assess the economic impact of UPGRID innovation on the operation and design of the future power systems with different low carbon generation and demand portfolios. The whole-system modelling will quantify the economic and carbon benefits of rolling out UPGRID solutions and technologies that provide services not only to local distribution networks but also system wide benefits at the national level. Based on real data and results available from the trials and demonstration carried in 4 UPGRID regions, this deliverable will describe how UPGRID concepts can facilitate a cost effective evolution to a lower carbon future.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Project Dissemination Plan. Web site Report of Project Dissemination analysis impact

Project Dissemination Plan. Web site Report of Project Dissemination analysis impact

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Other 2019-05-31

Report including a brief summary of results obtained in WP8 and recommendations

Brief summary of results obtained in WP8 and recommendations

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Systems testing and optimization

The deliverable 6.5 includes the solution test, analysis and examining the scalability possibilities over the whole OSD area. The report will include results solution built within the project, particularly:
• Report about the demonstrator various functions tests and optimisation
• Report containing new rules for electric power system management
• Report defining new rules for electric power system development (if the demonstrator operation will show such possibility)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Result of the demonstration project

T5.3.1.- Report: Evaluation of the achieved performance
Content:
-Technical result of the project demonstration.
-Cost benefit analyzes of the demonstration project
-Final illustrations of developed system functionalities from each system provider

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Incentive framework for facilitating investments in UPGRID innovative concepts

This deliverable will synthesize relevant project results including the expected economic and environmental benefits of a mass-market rollout of UPGRID solutions. This task will consider provisions that regulatory agency may establish to allow distribution companies to include the risk associated with new technologies in network planning investment programmes. This will lead to a roadmap and a thereof derived list of actions to prepare the successful rollout of UPGRID solutions throughout Europe. The report will outline the key changes in commercial and regulatory policy frameworks that will be needed to achieve the key policy evolution milestones, particularly focusing on risk management associated with UPGRID paradigm and facilitating efficient strategic investment in new technologies under uncertainty. The roadmap will also take into account a number of stakeholder perspectives involved, including network operators, energy suppliers, regulators and policy makers. The very final output will thus be a clear set recommendations to different stakeholders as to how to make the demo based UPGRID experience a reality for the millions of EU electricity customers.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on Market barriers for deployment of UPGRID innovative concepts

The key aim of this deliverable is to identify barriers in the present regulatory and commercial framework and limitations of the existing distribution network operation and design standards, particularly in 4 Demo Region, that may limit or prevent roll-out of UPGRID innovative concepts and solutions. This will involve critical assessment of the regulatory incentives to invest in both smart and traditional networks solutions while considering conflicts and synergies between electricity network and energy supply objectives, including present network operation and planning practices.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Evaluation of Demonstration Results and Data collection

This deliverable will be the product of tasks 4.3 and 4.4 which includes the report on the evaluation of the demonstration, including results, and the collection of data relevant for further analysis at project level, namely KPIs and cross demonstration analysis.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Demonstration results Evaluation and Opportunities

Evaluate the performance of the improved real operation with the expected results.
Interaction and support to network planning, by providing high level of detail on the performance of specific areas of LV networks. Analyze different DSO processes evaluating the possible improvement achieved on them as a consequence of the innovations being carried out in the demonstration.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report about KPIs analysis and methods of comparison

This document will present the results of the analysis and validation of the KPIs, methods and alternatives of comparison, that were previously identified and defined in WP1 for each demonstration with respect their actual implementation in those correspondent demonstration allowing the revision and validation of the initial hypotheses performed.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on non-technical local incentives and barriers

Description of the non-technical local incentives and barriers take into account regulation and incentives,policy context, economic conditions, market uptake and business opportunities expectations and societal and final user related issues.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on the performance of the selected tools that were tested in laboratory

Description of the performance of the selected tools tested in laboratory.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on common KPIs

Definition of common KPIs to monitor the performance of each of the demonstrations that will be running at the end of the project in order to ensure the reliability, success, quality and cost of the different targets of the project. The KPIs will be focused on Supervisory and control parameters of the LV network of the different pilot sites and they will be use to validate and compare the results of the project.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on standards and potential synergies

Description of the implementation of standardized solutions and improvements in some of the proposed demo projects by maximizing the use of interoperable and standardized equipment.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on the implementation of CIM as the reference data model for the project

The report will gather all the relevant information about the application of CIM model and the associated messages in the project. It will include: model requirements of the MV/LV networks in the scope of the project, coverage of the general CIM model, application of other developed MV/LV CIM profiles, design of MV/LV CIM extensions if this is necessary, guidelines for applying the CIM in the project, coverage of the standardized IEC 61968/62325 messages, development of new MV/LV CIM messages if this is necessary, the guidelines for using the messages and the guidelines for developing new messages to assure the interoperability.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Targeted Social stakeholders segmentation and analysis.

Analysis on targeted social stakeholders segmentation. Description of social stakeholders.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Conclusions of Load and Generation Forecasting; Data analysis, model identification and model validation procedures

Conclusions of Load and Generation Forecasting;
Data analysis, model identification and model validation procedures

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Report on Services provided by DSOs to the retail market

The D2.2 report will provide the identification, specification and technical design of the EDR, DEC and IEM set of services for the Demand Side Management, which will be tested through proof-of-concept in a pilot trial with a set of clients in the EDP and Iberdrola test sites.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Documents, reports 2019-05-31

Communication Campaigns Planning. Communication Support material and dynamics design. Communication Campaigns development, information gathered and conclusions.

Description of the communication campaigns that will be carried out within the project to ensure a proper communication

Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014

download deliverable 

Other 2019-05-31