sCO2-HeRo project deliverables

The page lists 20 deliverables related to the research project "sCO2-HeRo".

 List of Deliverables

sCO2-HeRo: list of downloadable deliverables.
title and desprition type last update

Release design requirements (connections, flanges, installation of components)

In collaboration with WP1 a specification of all necessary glass model modifications will be written. The specification will describe the mechanical and control system changes. A safety concept, safety valve and CO2 Alarm is required

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Data of simple CO2 experiment for code validation

Delivery of experimental data of different test configurations of the compact heat exchanger will be provided to validate the CFD code for high and low temperature applications.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Compact heat exchanger hardware to be attached to the glass model at GfS

Delivery of the compact heat exchanger hardware to be installed into the glass model at Gfs.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Public website

The public web site covers the communication of progress and results, of events and news from the project towards the wider public

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Dissemination, communication and exploitation plan (annually updated), including updates of activities undertaken in Task 5.2 to 5.6

The report will be the guidance for the partners regarding the protection and exploitation of results, the procedures and objectives of a targeted dissemination as well for the communication towards the wider public. The report will sum up the background of the project and provide a disclosure procedure for the evaluation of the patentability of IPRs. The report will updates once per year with information regarding the published articles (T5.2), glass model visits and training courses (T5.3), the IPRs (T5.4), the use of the project’s web site (T5.5) and promotions (T5.6)

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Release test program glass model

Test program for the glass model shall include all scenarios with loss of internal power of reactor model. The test program will be based on safety analyses performed in WP 1, according to deliverable D3-1.3.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Start-up system hardware

Describing the start-up system of the cycle and manufacturing drawings. In case the hardware is an integral part of the turbomachinery the delivery contains sketches only.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Shipping of turbo-machine set to CV Rez

The hardware of the turbo-machine set including the start-up system shall be shipped to CV Rez. The hardware does not include the connecting piping between the start-up system neither the integration piping into the CV Rez system.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Other 2019-05-31

Release documentation of preparation glass model

With collaboration of WP1 a specification of the necessary glass model modifications will be written. The specification will describe the mechanical and control system changes to invite offers for both manufacturing of components and installation.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Sink heat exchanger hardware shipping to GfS and delivery of validated performance maps

Basic experiments and verification of operation of heat exchanger will be performed.
Based on experimental results performance maps will be created.
Then the heat exchanger will be shipped to GfS.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Kick-off meeting

UDE will organise and prepare the project’s kick-off meeting. It will allow all partners (scientific, management and administrative/financial staff) meeting together and clarifying actual procedures within the research activities.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Other 2019-05-31

Sink heat exchanger hardware

Specification of operating conditions will be presented in detail. Technical requirements of the heat sink exchanger will be determined by preliminary calculations. Consequently, the heat exchanger will be purchased (if affordable on the market) or manufactured, based on the technical assessment.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

BWR simulations of decay heat management

After finishing the preparation of the BWR simulator several operational and transient simulations with respect to the ATHLET-calculations done by Venker will be carried out.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Visits at the glass model accompanied by specific training module

Training scenarios will describe the behaviour of the glass model with implementation of the sCO2-HeRo during appropriate transients. These training scenarios will be incorporated into an overall training program as a part of complementary element to safety/security seminars dedicated to students and PhD candidates.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Release thermodynamic cycle parameter

List of all necessary data of the glass model, like steam temperature, pressure, flow, and the transferred power.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Final conference

At the Final Conference, ReGround will present its achievements to both the public and the interested scientific community.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Other 2019-05-31

Shipping of turbo-machine set to GfS

Turbo-machine set will be tested and a basic measurement to obtain the necessary experimental data will be performed. Then the facility will be shipped to GfS.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Other 2019-05-31

Mechanical/thermal stresses

Documentation of the thermal and mechanical stresses for the parts of the turbo-machine (rotating parts and casing).

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Report of articles published in scientific and technical journals and presentations given at conferences

The reports lists all publications made during the lifetime of the project including their abstracts.

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31

Reporting templates and communication guidance

The reports summarises all templates for reporting, deliverables and communication activities and explains how reports and deliverables have to be produced

Programme: H2020-Euratom-1.1. - Topic(s): NFRP-03-2014

download deliverable 

Documents, reports 2019-05-31