Opendata, web and dolomites

IVMR project deliverables

The page lists 35 deliverables related to the research project "IVMR".

 List of Deliverables

IVMR: list of downloadable deliverables.
title and desprition type last update

Final report on simulant stratified pool

Interim report on heat transfer within stratified molten pool with simulant materials, performed at KTH (POMECO facility)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-13

Final report on top cooling

Final report on direct cooling of the top metal layer performed in KTH facility

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-13

Final project report

Summary of activities and main results obtained during the whole project

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-13

Report on CERES tests

Final report on complementary experiments on the CERES facilities (MTA-EK)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-13

Synthesis report on spray cooling

Synthesis report on RPV spray cooling for IVMR and recommendations for system design.

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-11

Report on experimental study of spray cooling

Synthesis report on experimental study of CHF and post dry heat transfer with spray water cooling of downward inclined vessel steel surface (performed at KTH)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Review of alternative innovations

Synthesis report on benefits of several innovations to improve IVMR success

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Synthesis report on corium pool behaviour

Final report on physicochemical phenomena in corium debris and molten pool

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Final report on the large scale cold-crucible experiment

Final report on the measurements of heat flux between the vessel wall and the stratified molten pool performed in the large scale cold-crucible experiment at CVR

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Review of spray cooling

Final report on spray cooling (existing options, design, efficiency)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Report on mechanical resistance

Synthesis report on task 2.4 about the mechanical resistance of ablated wall under high heat flux

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Review of vessel coating

Final report on the efficiency of various vessel coatings

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Report on the use of CFD

Synthesis report on task 2.3 about the use of CFD for simulation of stratified molten pool or external cooling.

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Communication action Plan

Communication action Plan (CAP)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-03-06

Final report on critical scenarios

Final report on task 5.1 – Options to reduce the probability of critical scenarios

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-27

Methodology - Synthesis

Synthesis report about the updated methodology for demonstration of In-Vessel melt retention

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on core debris coolability

Final report on the effect of partially melted debris re-flood performed in PEAL and PRELUDE facilities (IRSN)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Results of the PIRT on phenomena relevant for IVR modelling

Description of the method to establish the rankings and conclusions of the ranking

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on innovations

Final report on innovations

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Review of baffling of the vessel

Final report on baffling of the vessel (design, efficiency, optimization)

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on full scale tests

Final report on full scale geometry tests (2D slice) performed at UJV

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Report on modelling

Synthesis report on task 2.2 about modelling and improvement of codes

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on oxide conductivity

Final report on measurements of heat conductivity of the solid oxide phase performed in ITU facility

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Review of active passive/injection systems

Final report on the review of active/passive in-vessel injection systems

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on melt properties

Final report on melt properties measurements performed in CEA facilities

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Influence of oxidation and fluid properties on boiling and CHF: Results of the CNU-M1 and ANUBIS tests

Influence of oxidation and fluid properties on boiling and CHF: Results of the CNU-M1 and ANUBIS tests

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

3rd periodic report

Summary of activities and main results obtained during the third year of the project

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on core reflood

Final report on the effect of core re-flood

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Review of instrumentation for SAMG

Final report on instrumention to monitor the IVMR management

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

First periodic report

Summary of activities and main results obtained during the first year of the project

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

IVMR website

Creation of IVMR website

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-14

2nd periodic report

Summary of activities and main results obtained during the second year of the project

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Preliminary report on spray cooling

State-of-the-art review of spray cooling and heat transfer models and feasibility study report

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Minutes of the kick-off meeting

Summary of initial discussions and presentations about the objectives of the project and the contributions of participants.

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14

Final report on small scale tests

Final report of small scale experimental results performed at UJV

Programme: H2020-Euratom-1.8.;H2020-Euratom-1.3.;H2020-Euratom-1.1. - Topic(s): NFRP-01-2014

download deliverable 

Documents, reports 2020-02-14