ARCADES project deliverables
The page lists 8 deliverables related to the research project "ARCADES".
List of Deliverables
ARCADES: list of downloadable deliverables.
title and desprition
| type |
last update |
Draft 1st Periodic report
Report on advances in research, training, dissemination, and management. The basis for the midterm review.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Documents, reports |
2019-06-27 |
1st scientific advances report on WP3
1st scientific advances report: state of the art, research organisation, and first results.
Task 3.1 Control structures for motion design (ESR7): State of the art and performance comparisons of known approaches, possibly new approaches, if sufficiently developed, in motion design.
Task 3.2 Skeleton-based design of surfaces (ESR6): Formulation and experimentation of topologically accurate convolution surfaces for skeletons made of arcs of circles and line segments.
Task 3.3 Singularities and syzygies of parameterisations (ESR3): Familiarity with methods already known to compute invariants of parameterisations by exploiting syzygies and singularities, and implementations to use these ideas in an efficient and fast way.
Task 3.4 Distance to NURBS curves and surfaces (ESR4): New method based on matrix representations for determining all the closest points to a single Bezier patch.
Task 3.5 Path planning and workspace modelling (ESR2): Design of adaptive algebraic algorithms to model the workspace of mechanisms.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Documents, reports |
2019-06-27 |
Midterm Review Meeting
Midterm review meeting.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Other |
2019-06-27 |
Kickoff Workshop & Recruitment Event
Network Kickoff workshop, and Recruitment event.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Other |
2019-06-27 |
1st progress report
Detailing the project progress so far including all aspects (hiring situation, training, and management).
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Documents, reports |
2019-06-27 |
1st scientific advances report on WP2
1st scientific advances report: state of the art, research organisation and first results.
Task 2.1 Refinement strategies for LR-splines (ESR8): First results on refinement strategies and linear independence.
Task 2.2 Parametric modelling of complex shapes (ESR5): Analysis and construction of Gk splines on domains with arbitrary topology.
Task 2.3 Integrating novel shape representations with Isogeometric Analysis (ESR11): CADfix-aligned T/LR-spline based IGA-BEM solver with applications in ship-system hydrodynamics.
Task 2.4 Integration and evaluation of novel parametric modellers tools for design optimisation (ESR10): T-spline based parametric modellers that can handle smoothness, interpolation and shape-preservation constraints.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Documents, reports |
2019-06-27 |
Advertisement of ESR openings
Advertisement of ESR positions and the recruitment event using the project\'s and the Euraxess webportals, emailing lists and social networks, and printed material such as posters, leaflets, etc.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Other |
2019-06-27 |
1st scientific advances report on WP1
1st scientific advances report: state of the art, research organisation and first results.
Task 1.1 Adaptive algebraic representations (ESR1): New, adaptive and efficient implicit representation of parametric, and point-cloud models.
Task 1.2 Locally refined approximate implicitisation (ESR9): Bivariate approximate implicitisation using LR B-splines.
Task 1.3 Constraint formulation and computing with constraint varieties at interactive rates (ESR12): Interactive modelling with developable NURBS surfaces.
Task 1.4 Constrained geometry for fabrication (ESR13): Computational design of pattern-like arrangements and support structures in equilibrium.
Programme: H2020-EU.1.3.1. - Topic(s): MSCA-ITN-2015-ETN
download deliverable
|
Documents, reports |
2019-06-27 |